IDEAS home Printed from https://ideas.repec.org/a/bjf/ijltem/v15y2026i4a2415.html

Impact of Proactive Quality Management Practices on Construction Project Performance

Author

Listed:
  • Aakash Shah

    (Student, Department of Civil Engineering, U. V. Patel College of Engineering, Ganpat University, Kherva, Mehsana)

  • Jayraj Solanki

    (Head PG & Assistant Professor, Department of Civil Engineering, U. V. Patel College of Engineering, Ganpat University, Kherva, Mehsana)

  • Darshan Shah

    (Assistant Professor, Department of Civil Engineering, U. V. Patel College of Engineering, Ganpat University, Kherva, Mehsana)

  • V. M. Patel

    (Asso. Executive Dean & Professor, Core Engineering Programs, U. V. Patel College of Engineering, Ganpat University, Kherva, Mehsana)

Abstract

Quality management is an essential aspect of ensuring that construction projects are completed successfully. Conventional approaches to quality control tend to be reactive since defects are detected after completion, which necessitates rework, wasted materials, higher costs, and delayed schedules. To address such problems, the construction sector is gradually embracing proactive quality management techniques that aim at preventing defects and enhancing performance continuously. The present study examines the effects of proactive quality management techniques on the performance of construction projects. Specifically, the study addresses preventative inspections, method statements and quality checklists, and worker and engineer training programs. In this research, a mixed-method design was utilized, comprising questionnaires, interviews, site visits, and analysis of Non-Conformance Reports (NCRs). The gathered data was analyzed using percentage analysis, Relative Importance Index (RII), and ranking techniques. The results show that preventive inspections play a crucial role in recognizing any flaws in the early stages of development, whereas the use of method statements and quality checklists brings about consistency in construction operations. However, it was determined that training and skill development programs had the most significant contribution to productivity levels, quality of workmanship, and eliminating recurrent flaws. This study suggests that quality management approaches play an essential role in improving construction performance by decreasing the occurrence of defects, minimizing rework, reducing the cost of poor quality (CoPQ), and increasing productivity.

Suggested Citation

  • Aakash Shah & Jayraj Solanki & Darshan Shah & V. M. Patel, 2026. "Impact of Proactive Quality Management Practices on Construction Project Performance," International Journal of Latest Technology in Engineering, Management & Applied Science, RSIS International, vol. 15(4), pages 1334-1345, April.
  • Handle: RePEc:bjf:ijltem:v:15:y:2026:i:4:a:2415
    DOI: 10.51583/IJLTEMAS.2026.150400114
    as

    Download full text from publisher

    File URL: https://www.ijltemas.in/submission/online/article/view/4660/6298
    Download Restriction: no

    File URL: https://www.ijltemas.in/submission/online/article/view/4660
    Download Restriction: no

    File URL: https://libkey.io/10.51583/IJLTEMAS.2026.150400114?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:bjf:ijltem:v:15:y:2026:i:4:a:2415. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    We have no bibliographic references for this item. You can help adding them by using this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Dr. Pawan Verma (email available below). General contact details of provider: https://www.ijltemas.in/ .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.