Author
Listed:
- Adebayo, Adeyinka V.
(Electrical Engineering Dept. Uni of Johannesburg, South Africa)
- Ismaheel Oyeyemi Oladejo
(Department of Electrical Engineering, The Polytechnic, Ibadan, Nigeria)
- Pelumi Peter Aluko-Olokun
(Electrical and Electronics Dept. Sheffield Hallam University, Sheffield)
- Hussein K. Adebayo
(Department of Electrical Engineering, Lead City University, Ibadan, Nigeria)
Abstract
This study examines outage patterns in the Dugbe Business Unit of the Ibadan Electricity Distribution Company (IBEDC) to highlight reliability challenges and operational improvements at the distribution level within a large Nigerian franchise area. It combines quantitative reliability metrics, such as System Interruption Duration Index (SAIDI), System Average Interruption Frequency Index (SAIFI), and Consumer Average Interruption Duration Index (CAIDI), with qualitative data from stakeholder surveys, interviews, and archival records to analyse outage frequency, duration, and restoration performance. The study identifies key technical and operational factors driving outages. From 2021 to 2024, SAIFI decreased from 520 to 390 interruptions per customer, while SAIDI dropped from 2,800 to 2,200 hours per customer; CAIDI increased slightly from 5.38 to 5.64 hours. The year-to-date figures for 2025 show similar trends: 250 SAIFI, 1,500 SAIDI, and 6.00 CAIDI. These patterns suggest that prevention measures have improved more quickly than restoration efforts, resulting in fewer outages and lower total disruption, but with slightly longer average restoration times. Root cause analysis reveals that certain technical factors- such as air-conditioning equipment, capacitors, cabling, conductors, transformers, and low-voltage lines- as well as random drivers, explain a significant portion of outages, with a persistent downstream pattern at one substation. We recommend a dual approach: enhance event prevention through risk-based and condition-based maintenance, along with targeted undergrounding, while also streamlining restoration processes via automation, OMS/SCADA workflows, staging crews, and spare parts, as well as standard switching procedures. Although focused on distribution outages and limited by the preliminary nature of the 2025 year-to-date data, this analysis provides a practical model for improving reliability and governance at the feeder and business-unit levels.
Suggested Citation
Adebayo, Adeyinka V. & Ismaheel Oyeyemi Oladejo & Pelumi Peter Aluko-Olokun & Hussein K. Adebayo, 2025.
"Power Outage Analysis in Electricity Distribution Network: A Case Study of Dugbe Business Unit, Ibadan, Nigeria,"
International Journal of Latest Technology in Engineering, Management & Applied Science, RSIS International, vol. 14(8), pages 1428-1439, August.
Handle:
RePEc:bjf:ijltem:v:14:y:2025:i:8:a:1755
DOI: 10.51583/IJLTEMAS.2025.1408000182
Download full text from publisher
Corrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:bjf:ijltem:v:14:y:2025:i:8:a:1755. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
We have no bibliographic references for this item. You can help adding them by using this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Dr. Pawan Verma (email available below). General contact details of provider: https://www.ijltemas.in/ .
Please note that corrections may take a couple of weeks to filter through
the various RePEc services.