Author
Listed:
- Do Ngoc Hien
(Department of Industrial & Systems Engineering, Ho Chi Minh City University of Technology (HCMUT), 268 Ly Thuong Kiet Street, Dien Hong Ward; Vietnam National University Ho Chi Minh City (VNU-HCM), Linh Xuan Ward, Ho Chi Minh City, Vietnam.)
- Tran Ngoc Tu
(Department of Industrial & Systems Engineering, Ho Chi Minh City University of Technology (HCMUT), 268 Ly Thuong Kiet Street, Dien Hong Ward; Vietnam National University Ho Chi Minh City (VNU-HCM), Linh Xuan Ward, Ho Chi Minh City, Vietnam.)
- Ha Thanh Tung
(Department of Industrial & Systems Engineering, Ho Chi Minh City University of Technology (HCMUT), 268 Ly Thuong Kiet Street, Dien Hong Ward; Vietnam National University Ho Chi Minh City (VNU-HCM), Linh Xuan Ward, Ho Chi Minh City, Vietnam.)
- Vo Thuy Thao Vy
(Department of Industrial & Systems Engineering, Ho Chi Minh City University of Technology (HCMUT), 268 Ly Thuong Kiet Street, Dien Hong Ward; Vietnam National University Ho Chi Minh City (VNU-HCM), Linh Xuan Ward, Ho Chi Minh City, Vietnam.)
Abstract
This paper would present a case study on solving a parallel machine scheduling problem in the printing department of a global leader in labeling solutions. Motivated by low-season conditions with below-capacity order volumes, the study prioritizes accelerating job completions to reduce resource idle time in downstream processes. It would focus on minimizing the total weighted completion time while addressing real-world constraints including machine-job compatibility, shift boundaries, and resource limitations in color matching processes. The problem was formulated as a three parallel machines with different speeds model and used Weighted Shortest Processing Time dispatching rule to find out solutions. The scheduling objective is to minimize total weighted completion time. Our approach progressively incorporates operational constraints and achieves around 11.11% improvement in objective value compared to the current manual scheduling method. Some discussions on implementation of research results, limitations, and future optimization opportunities and real-time production data integration would be mentioned.
Suggested Citation
Do Ngoc Hien & Tran Ngoc Tu & Ha Thanh Tung & Vo Thuy Thao Vy, 2025.
"Parallel Machine Scheduling with Constraints in a Labelling Industry Case Study,"
International Journal of Latest Technology in Engineering, Management & Applied Science, RSIS International, vol. 14(11), pages 244-255, December.
Handle:
RePEc:bjf:ijltem:v:14:y:2025:i:11:a:663
DOI: 10.51583/IJLTEMAS.2025.1411000024
Download full text from publisher
Corrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:bjf:ijltem:v:14:y:2025:i:11:a:663. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
We have no bibliographic references for this item. You can help adding them by using this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Dr. Pawan Verma (email available below). General contact details of provider: https://www.ijltemas.in/ .
Please note that corrections may take a couple of weeks to filter through
the various RePEc services.