IDEAS home Printed from https://ideas.repec.org/a/bjc/journl/v11y2024i4p609-630.html
   My bibliography  Save this article

Effects of Construction Contracts on Performance: The Case of Construction Firms in Kampala, Uganda

Author

Listed:
  • Ahereza Gilbert

    (School of Engineering and Applied Sciences, Kampala International University)

Abstract

The study aimed to investigate the influence of construction contracts on the overall performance of selected construction firms in Kampala district. Specifically, it sought to assess the impact of formally contracting personnel, evaluate the effect of special contract conditions, and examine the role of surety bonds on firm performance within the construction industry. A descriptive design utilizing quantitative methods was utilized. The study utilized purposive and random sampling techniques to select relevant respondents from various positions within construction firms, ensuring a comprehensive analysis of the subject matter. A sample size of 76 respondents was involved in the study. Data collection was facilitated through a structured questionnaire comprising Likert scale type questions, piloted to ensure relevance and logical flow. The study achieved an 88.3% response rate, with 80 questionnaires returned and analyzed. The study found that there exist a significant controlling effect on the relationship between (i) contracted (temporary) personnel and performance of construction firms (r=0.778, p=0.000), (ii) special conditions of contract and performance of construction firms (r=892, p=0.000) and (iii) surety bonds and performance of construction firms (r=0.830, p=0.000). Analysis of performance indicators highlighted the importance of factors such as adherence to construction codes, client satisfaction, and innovative practices in determining firm success. In conclusion, the study underscored the critical role of construction contracts in shaping the performance of construction firms in Kampala district. To optimize firm performance, it is recommended that firms prioritize the recruitment and retention of skilled personnel, adhere meticulously to construction contracts, and leverage surety bonds for risk mitigation. These findings provide valuable insights for construction industry stakeholders, guiding strategic decision-making to enhance operational efficiency and project outcomes.

Suggested Citation

  • Ahereza Gilbert, 2024. "Effects of Construction Contracts on Performance: The Case of Construction Firms in Kampala, Uganda," International Journal of Research and Scientific Innovation, International Journal of Research and Scientific Innovation (IJRSI), vol. 11(4), pages 609-630, April.
  • Handle: RePEc:bjc:journl:v:11:y:2024:i:4:p:609-630
    as

    Download full text from publisher

    File URL: https://www.rsisinternational.org/journals/ijrsi/digital-library/volume-11-issue-4/609-630.pdf
    Download Restriction: no

    File URL: https://rsisinternational.org/journals/ijrsi/articles/effects-of-construction-contracts-on-performance-the-case-of-construction-firms-in-kampala-uganda/
    Download Restriction: no
    ---><---

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:bjc:journl:v:11:y:2024:i:4:p:609-630. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    We have no bibliographic references for this item. You can help adding them by using this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Dr. Renu Malsaria (email available below). General contact details of provider: https://www.rsisinternational.org/journals/ijrsi/ .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.