IDEAS home Printed from https://ideas.repec.org/r/eee/ejores/v201y2010i1p99-111.html
   My bibliography  Save this item

Concerning the theory of workload control

Citations

Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
as


Cited by:

  1. Matthias Thürer & Nuno O. Fernandes & Mark Stevenson, 2020. "Material Flow Control in High‐Variety Make‐to‐Order Shops: Combining COBACABANA and POLCA," Production and Operations Management, Production and Operations Management Society, vol. 29(9), pages 2138-2152, September.
  2. Kasper, T.A. Arno & Land, Martin J. & Teunter, Ruud H., 2023. "Non-hierarchical work-in-progress control in manufacturing," International Journal of Production Economics, Elsevier, vol. 257(C).
  3. Matthias Thürer & Mark Stevenson, 2016. "Card-based delivery date promising in pure flow shops with order release control," International Journal of Production Research, Taylor & Francis Journals, vol. 54(22), pages 6798-6811, November.
  4. Davood Golmohammadi & S. Afshin Mansouri, 2015. "Complexity and workload considerations in product mix decisions under the theory of constraints," Naval Research Logistics (NRL), John Wiley & Sons, vol. 62(5), pages 357-369, August.
  5. Romero-Silva, Rodrigo & Hernández-López, Gabriel, 2020. "Shop-floor scheduling as a competitive advantage: A study on the relevance of cyber-physical systems in different manufacturing contexts," International Journal of Production Economics, Elsevier, vol. 224(C).
  6. Thürer, Matthias & Stevenson, Mark & Qu, Ting & Godinho Filho, Moacir, 2014. "The design of simple subcontracting rules for make-to-order shops: An assessment by simulation," European Journal of Operational Research, Elsevier, vol. 239(3), pages 854-864.
  7. Fernandes, Nuno O. & Thürer, Matthias & Silva, Cristóvão & Carmo-Silva, Sílvio, 2017. "Improving workload control order release: Incorporating a starvation avoidance trigger into continuous release," International Journal of Production Economics, Elsevier, vol. 194(C), pages 181-189.
  8. Yarong Chen & Hongming Zhou & Peiyu Huang & FuhDer Chou & Shenquan Huang, 2022. "A refined order release method for achieving robustness of non-repetitive dynamic manufacturing system performance," Annals of Operations Research, Springer, vol. 311(1), pages 65-79, April.
  9. Onay, Anita & Stampfer, Christina & Missbauer, Hubert, 2023. "A behavioral perspective on workload control concepts: The influence of order release on operators’ reaction behavior," International Journal of Production Economics, Elsevier, vol. 264(C).
  10. Thürer, Matthias & Stevenson, Mark & Land, Martin J., 2016. "On the integration of input and output control: Workload Control order release," International Journal of Production Economics, Elsevier, vol. 174(C), pages 43-53.
  11. Thürer, Matthias & Land, Martin J. & Stevenson, Mark, 2014. "Card-based workload control for job shops: Improving COBACABANA," International Journal of Production Economics, Elsevier, vol. 147(PA), pages 180-188.
  12. Thürer, Matthias & Land, Martin J. & Stevenson, Mark & Fredendall, Lawrence D., 2016. "Card-based delivery date promising in high-variety manufacturing with order release control," International Journal of Production Economics, Elsevier, vol. 172(C), pages 19-30.
  13. Federica Costa & Alberto Portioli-Staudacher, 2021. "Labor flexibility integration in workload control in Industry 4.0 era," Operations Management Research, Springer, vol. 14(3), pages 420-433, December.
  14. Matthias Thürer & Mark Stevenson, 2016. "Workload control in job shops with re-entrant flows: an assessment by simulation," International Journal of Production Research, Taylor & Francis Journals, vol. 54(17), pages 5136-5150, September.
  15. Sagawa, Juliana Keiko & Oliveira, Allan Freitas & Mušič, Gašper & Land, Martin J. & Maluf, Arthur Sarro, 2023. "Smart workload input-output control of production systems: A proof of concept," European Journal of Operational Research, Elsevier, vol. 309(1), pages 286-305.
  16. Pürgstaller, Peter & Missbauer, Hubert, 2012. "Rule-based vs. optimisation-based order release in workload control: A simulation study of a MTO manufacturer," International Journal of Production Economics, Elsevier, vol. 140(2), pages 670-680.
  17. Guodong Huang & Jie Chen & Yacob Khojasteh, 2021. "A cyber-physical system deployment based on pull strategies for one-of-a-kind production with limited resources," Journal of Intelligent Manufacturing, Springer, vol. 32(2), pages 579-596, February.
  18. Thürer, Matthias & Stevenson, Mark, 2018. "Bottleneck-oriented order release with shifting bottlenecks: An assessment by simulation," International Journal of Production Economics, Elsevier, vol. 197(C), pages 275-282.
  19. Stefan Haeussler & Philipp Neuner & Matthias Thürer, 2023. "Balancing earliness and tardiness within workload control order release: an assessment by simulation," Flexible Services and Manufacturing Journal, Springer, vol. 35(2), pages 487-508, June.
  20. Matthias Thürer & Nuno O. Fernandes & Mark Stevenson & Ting Qu, 2017. "On the backlog-sequencing decision for extending the applicability of ConWIP to high-variety contexts: an assessment by simulation," International Journal of Production Research, Taylor & Francis Journals, vol. 55(16), pages 4695-4711, August.
  21. Robinson, Stewart & Radnor, Zoe J. & Burgess, Nicola & Worthington, Claire, 2012. "SimLean: Utilising simulation in the implementation of lean in healthcare," European Journal of Operational Research, Elsevier, vol. 219(1), pages 188-197.
  22. Matthias Thürer & Mark Stevenson, 2021. "Material handling and order release control in high-variety make-to-order shops: an assessment by simulation," Operations Management Research, Springer, vol. 14(3), pages 494-506, December.
  23. von Schéele, Fabian & Haftor, Darek M., 2018. "Temporal workload in economic organizations: A hidden non-linear condition of economic efficiency," Journal of Business Research, Elsevier, vol. 88(C), pages 415-420.
  24. Golmohammadi, Davood, 2015. "A study of scheduling under the theory of constraints," International Journal of Production Economics, Elsevier, vol. 165(C), pages 38-50.
  25. Matthias Thürer & Mark Stevenson & Ting Qu, 2016. "Job sequencing and selection within workload control order release: an assessment by simulation," International Journal of Production Research, Taylor & Francis Journals, vol. 54(4), pages 1061-1075, February.
  26. Jianjun Liu & Martin J. Land & Jos A. C. Bokhorst & Qingxin Chen, 2023. "Improving coordination in assembly job shops: redesigning order release and dispatching," Flexible Services and Manufacturing Journal, Springer, vol. 35(3), pages 669-697, September.
  27. Thürer, Matthias & Stevenson, Mark & Silva, Cristovao & Qu, Ting, 2017. "Drum-buffer-rope and workload control in High-variety flow and job shops with bottlenecks: An assessment by simulation," International Journal of Production Economics, Elsevier, vol. 188(C), pages 116-127.
  28. Pergher, Isaac & Frej, Eduarda Asfora & Roselli, Lucia Reis Peixoto & de Almeida, Adiel Teixeira, 2020. "Integrating simulation and FITradeoff method for scheduling rules selection in job-shop production systems," International Journal of Production Economics, Elsevier, vol. 227(C).
IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.