Cycle time-oriented mid-term production planning for semiconductor wafer fabrication
Author
Abstract
Suggested Citation
DOI: 10.1080/00207543.2016.1278083
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
References listed on IDEAS
- Peter J. Billington & John O. McClain & L. Joseph Thomas, 1983. "Mathematical Programming Approaches to Capacity-Constrained MRP Systems: Review, Formulation and Problem Reduction," Management Science, INFORMS, vol. 29(10), pages 1126-1141, October.
- Yiwei Cai & Erhan Kutanoglu & John Hasenbein, 2011. "Production Planning and Scheduling: Interaction and Coordination," International Series in Operations Research & Management Science, in: Karl G Kempf & Pınar Keskinocak & Reha Uzsoy (ed.), Planning Production and Inventories in the Extended Enterprise, chapter 0, pages 15-42, Springer.
- Kim, Jong Soo & Leachman, Robert C., 1994. "Decomposition method application to a large scale linear programming WIP projection model," European Journal of Operational Research, Elsevier, vol. 74(1), pages 152-160, April.
- Robert C. Leachman & Jeenyoung Kang & Vincent Lin, 2002. "SLIM: Short Cycle Time and Low Inventory in Manufacturing at Samsung Electronics," Interfaces, INFORMS, vol. 32(1), pages 61-77, February.
- Kim, Bokang & Kim, Sooyoung, 2001. "Extended model for a hybrid production planning approach," International Journal of Production Economics, Elsevier, vol. 73(2), pages 165-173, September.
- Steven T. Hackman & Robert C. Leachman, 1989. "A General Framework for Modeling Production," Management Science, INFORMS, vol. 35(4), pages 478-495, April.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Julia Pahl & Stefan Voß & David Woodruff, 2007. "Production planning with load dependent lead times: an update of research," Annals of Operations Research, Springer, vol. 153(1), pages 297-345, September.
- Gopalswamy, Karthick & Uzsoy, Reha, 2021. "Conic programming models for production planning with clearing functions: Formulations and duality," European Journal of Operational Research, Elsevier, vol. 292(3), pages 953-966.
- Tian, Feng & Willems, Sean P. & Kempf, Karl G., 2011. "An iterative approach to item-level tactical production and inventory planning," International Journal of Production Economics, Elsevier, vol. 133(1), pages 439-450, September.
- Haeussler, S. & Stampfer, C. & Missbauer, H., 2020. "Comparison of two optimization based order release models with fixed and variable lead times," International Journal of Production Economics, Elsevier, vol. 227(C).
- Pürgstaller, Peter & Missbauer, Hubert, 2012. "Rule-based vs. optimisation-based order release in workload control: A simulation study of a MTO manufacturer," International Journal of Production Economics, Elsevier, vol. 140(2), pages 670-680.
- Jakob Asmundsson & Ronald L. Rardin & Can Hulusi Turkseven & Reha Uzsoy, 2009. "Production planning with resources subject to congestion," Naval Research Logistics (NRL), John Wiley & Sons, vol. 56(2), pages 142-157, March.
- Craig A. Tovey, 2002. "Tutorial on Computational Complexity," Interfaces, INFORMS, vol. 32(3), pages 30-61, June.
- Cherchye, Laurens & De Rock, Bram & Kerstens, Pieter Jan, 2018.
"Production with storable and durable inputs: Nonparametric analysis of intertemporal efficiency,"
European Journal of Operational Research, Elsevier, vol. 270(2), pages 498-513.
- Laurens Cherchye & Bram De Rock & Pieter Jan Kerstens, 2016. "Production with storable and durable inputs: nonparametric analysis of intertemporal efficiency," Working Papers of Department of Economics, Leuven 549617, KU Leuven, Faculty of Economics and Business (FEB), Department of Economics, Leuven.
- Laurens Cherchye & Bram De Rock, 2016. "Production with Storable and Durable Inputs: Nonparametric Analysis of Intertemporal Efficiency," Working Papers ECARES ECARES 2016-33, ULB -- Universite Libre de Bruxelles.
- Kefeli, Ali & Uzsoy, Reha & Fathi, Yahya & Kay, Michael, 2011. "Using a mathematical programming model to examine the marginal price of capacitated resources," International Journal of Production Economics, Elsevier, vol. 131(1), pages 383-391, May.
- Tao Wu & Leyuan Shi & Joseph Geunes & Kerem Akartunalı, 2012. "On the equivalence of strong formulations for capacitated multi-level lot sizing problems with setup times," Journal of Global Optimization, Springer, vol. 53(4), pages 615-639, August.
- J. F. Chen & W. E. Wilhelm, 1994. "Optimizing the allocation of components to kits in small‐lot, multiechelon assembly systems," Naval Research Logistics (NRL), John Wiley & Sons, vol. 41(2), pages 229-256, March.
- J. Drechsel & A. Kimms, 2010. "The subcoalition-perfect core of cooperative games," Annals of Operations Research, Springer, vol. 181(1), pages 591-601, December.
- Elena Katok & Holly S. Lewis & Terry P. Harrison, 1998. "Lot Sizing in General Assembly Systems with Setup Costs, Setup Times, and Multiple Constrained Resources," Management Science, INFORMS, vol. 44(6), pages 859-877, June.
- Leachman, Robert C. & Ding, Shengwei, 2007. "Integration of speed economics into decision-making for manufacturing management," International Journal of Production Economics, Elsevier, vol. 107(1), pages 39-55, May.
- Huang, Hai-Jun & Xu, Gang, 1998. "Aggregate scheduling and network solving of multi-stage and multi-item manufacturing systems," European Journal of Operational Research, Elsevier, vol. 105(1), pages 52-65, February.
- Stadtler, Hartmut, 1996. "Mixed integer programming model formulations for dynamic multi-item multi-level capacitated lotsizing," European Journal of Operational Research, Elsevier, vol. 94(3), pages 561-581, November.
- Kolisch, R., 2000. "Integration of assembly and fabrication for make-to-order production," International Journal of Production Economics, Elsevier, vol. 68(3), pages 287-306, December.
- Helber, Stefan & Sahling, Florian, 2010.
"A fix-and-optimize approach for the multi-level capacitated lot sizing problem,"
International Journal of Production Economics, Elsevier, vol. 123(2), pages 247-256, February.
- Helber, Stefan & Sahling, Florian, 2008. "A Fix-and-Optimize Approach for the Multi-Level Capacitated Lot Sizing Problems," Hannover Economic Papers (HEP) dp-393, Leibniz Universität Hannover, Wirtschaftswissenschaftliche Fakultät.
- Amirteimoori, Alireza & Kordrostami, Sohrab, 2012. "Production planning in data envelopment analysis," International Journal of Production Economics, Elsevier, vol. 140(1), pages 212-218.
- N.C. Simpson & S. Selcuk Erenguc, 2005. "Modeling multiple stage manufacturing systems with generalized costs and capacity issues," Naval Research Logistics (NRL), John Wiley & Sons, vol. 52(6), pages 560-570, September.
Corrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:taf:tprsxx:v:55:y:2017:i:16:p:4662-4679. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Chris Longhurst (email available below). General contact details of provider: http://www.tandfonline.com/TPRS20 .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.