IDEAS home Printed from https://ideas.repec.org/a/spr/jsched/v22y2019i6d10.1007_s10951-019-00606-w.html
   My bibliography  Save this article

Sequencing assembly lines to facilitate synchronized just-in-time part supply

Author

Listed:
  • Simon Emde

    (Technische Universität Darmstadt, Fachgebiet Management Science/Operations Research)

  • Lukas Polten

    (Technische Universität Darmstadt, Fachgebiet Management Science/Operations Research)

Abstract

The problem of sequencing assembly lines consists of determining the order in which a given set of products is launched down the line. Since individual products may require different parts in different quantities, the production sequence has a big influence on line-side inventory. Classically, sequences are often optimized with the goal of attaining level schedules, i.e., the part demand should be smooth during the planning horizon. However, this approach does not necessarily work well if parts are delivered at discrete points in time in bulk quantities. In this paper, we consider a production system where bins of parts are delivered periodically by a tow train from a central depot at fixed times. Due to the limited space at the assembly line, the maximum number of bins in stock at any time at any station should be minimal. We propose an exact solution method based on combinatorial Benders decomposition as well as bounding procedures and heuristics for this problem. The algorithms are shown to perform well both on instances from the literature and on new data sets. We also investigate whether classic level scheduling methods are effective at reducing line-side stock in an assembly system supplied by tow train, and to what degree line-side stock can be traded off for more frequent deliveries.

Suggested Citation

  • Simon Emde & Lukas Polten, 2019. "Sequencing assembly lines to facilitate synchronized just-in-time part supply," Journal of Scheduling, Springer, vol. 22(6), pages 607-621, December.
  • Handle: RePEc:spr:jsched:v:22:y:2019:i:6:d:10.1007_s10951-019-00606-w
    DOI: 10.1007/s10951-019-00606-w
    as

    Download full text from publisher

    File URL: http://link.springer.com/10.1007/s10951-019-00606-w
    File Function: Abstract
    Download Restriction: Access to the full text of the articles in this series is restricted.

    File URL: https://libkey.io/10.1007/s10951-019-00606-w?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Boysen, Nils & Emde, Simon & Hoeck, Michael & Kauderer, Markus, 2015. "Part logistics in the automotive industry: Decision problems, literature review and research agenda," Publications of Darmstadt Technical University, Institute for Business Studies (BWL) 79443, Darmstadt Technical University, Department of Business Administration, Economics and Law, Institute for Business Studies (BWL).
    2. Emde, Simon & Gendreau, Michel, 2017. "Scheduling in-house transport vehicles to feed parts to automotive assembly lines," European Journal of Operational Research, Elsevier, vol. 260(1), pages 255-267.
    3. Simon Emde & Malte Fliedner & Nils Boysen, 2012. "Optimally loading tow trains for just-in-time supply of mixed-model assembly lines," IISE Transactions, Taylor & Francis Journals, vol. 44(2), pages 121-135.
    4. Boysen, Nils & Emde, Simon & Hoeck, Michael & Kauderer, Markus, 2015. "Part logistics in the automotive industry: Decision problems, literature review and research agenda," European Journal of Operational Research, Elsevier, vol. 242(1), pages 107-120.
    5. Bautista, J. & Companys, R. & Corominas, A., 1996. "Heuristics and exact algorithms for solving the Monden problem," European Journal of Operational Research, Elsevier, vol. 88(1), pages 101-113, January.
    6. Massimiliano M. Schiraldi & Francesco Giordano, 2013. "On Just-In-Time Production Leveling," Chapters, in: Massimiliano M. Schiraldi (ed.), Operations Management, IntechOpen.
    7. Emde, Simon, 2017. "Scheduling the replenishment of just-in-time supermarkets in assembly plants," Publications of Darmstadt Technical University, Institute for Business Studies (BWL) 109730, Darmstadt Technical University, Department of Business Administration, Economics and Law, Institute for Business Studies (BWL).
    8. Emde, Simon & Boysen, Nils, 2012. "Optimally locating in-house logistics areas to facilitate JIT-supply of mixed-model assembly lines," International Journal of Production Economics, Elsevier, vol. 135(1), pages 393-402.
    9. Boysen, Nils & Fliedner, Malte & Scholl, Armin, 2009. "Sequencing mixed-model assembly lines: Survey, classification and model critique," European Journal of Operational Research, Elsevier, vol. 192(2), pages 349-373, January.
    10. Emde, Simon & Gendreau, Michel, 2017. "Scheduling in-house transport vehicles to feed parts to automotive assembly lines," Publications of Darmstadt Technical University, Institute for Business Studies (BWL) 109727, Darmstadt Technical University, Department of Business Administration, Economics and Law, Institute for Business Studies (BWL).
    11. repec:spr:pharme:v:21:y:2003:i:12:p:839-851 is not listed on IDEAS
    12. Solnon, Christine & Cung, Van Dat & Nguyen, Alain & Artigues, Christian, 2008. "The car sequencing problem: Overview of state-of-the-art methods and industrial case-study of the ROADEF'2005 challenge problem," European Journal of Operational Research, Elsevier, vol. 191(3), pages 912-927, December.
    13. Boysen, Nils & Emde, Simon, 2014. "Scheduling the part supply of mixed-model assembly lines in line-integrated supermarkets," Publications of Darmstadt Technical University, Institute for Business Studies (BWL) 79439, Darmstadt Technical University, Department of Business Administration, Economics and Law, Institute for Business Studies (BWL).
    14. Jordi Pereira & Mariona Vilà, 2015. "An exact algorithm for the mixed-model level scheduling problem," International Journal of Production Research, Taylor & Francis Journals, vol. 53(19), pages 5809-5825, October.
    15. Emde, Simon & Fliedner, Malte & Boysen, Nils, 2012. "Optimally loading tow trains for just-in-time supply of mixed-model assembly lines," Publications of Darmstadt Technical University, Institute for Business Studies (BWL) 79434, Darmstadt Technical University, Department of Business Administration, Economics and Law, Institute for Business Studies (BWL).
    16. Kubiak, Wieslaw, 1993. "Minimizing variation of production rates in just-in-time systems: A survey," European Journal of Operational Research, Elsevier, vol. 66(3), pages 259-271, May.
    17. Emde, Simon, 2017. "Optimally scheduling interfering and non-interfering cranes," Publications of Darmstadt Technical University, Institute for Business Studies (BWL) 90176, Darmstadt Technical University, Department of Business Administration, Economics and Law, Institute for Business Studies (BWL).
    18. Emde, Simon & Boysen, Nils, 2012. "Optimally locating in-house logistics areas to facilitate JIT-supply of mixed-model assembly lines," Publications of Darmstadt Technical University, Institute for Business Studies (BWL) 79445, Darmstadt Technical University, Department of Business Administration, Economics and Law, Institute for Business Studies (BWL).
    19. Emde, Simon & Boysen, Nils, 2012. "Optimally routing and scheduling tow trains for JIT-supply of mixed-model assembly lines," European Journal of Operational Research, Elsevier, vol. 217(2), pages 287-299.
    20. Boysen, Nils & Emde, Simon, 2014. "Scheduling the part supply of mixed-model assembly lines in line-integrated supermarkets," European Journal of Operational Research, Elsevier, vol. 239(3), pages 820-829.
    21. Battini, Daria & Boysen, Nils & Emde, Simon, 2013. "Just-in-Time supermarkets for part supply in the automobile industry," Publications of Darmstadt Technical University, Institute for Business Studies (BWL) 79438, Darmstadt Technical University, Department of Business Administration, Economics and Law, Institute for Business Studies (BWL).
    22. Daria Battini & Nils Boysen & Simon Emde, 2013. "Just-in-Time supermarkets for part supply in the automobile industry," Metrika: International Journal for Theoretical and Applied Statistics, Springer, vol. 24(2), pages 209-217, July.
    23. Rahmaniani, Ragheb & Crainic, Teodor Gabriel & Gendreau, Michel & Rei, Walter, 2017. "The Benders decomposition algorithm: A literature review," European Journal of Operational Research, Elsevier, vol. 259(3), pages 801-817.
    24. Gianni Codato & Matteo Fischetti, 2006. "Combinatorial Benders' Cuts for Mixed-Integer Linear Programming," Operations Research, INFORMS, vol. 54(4), pages 756-766, August.
    25. Simon Emde, 2017. "Scheduling the replenishment of just-in-time supermarkets in assembly plants," OR Spectrum: Quantitative Approaches in Management, Springer;Gesellschaft für Operations Research e.V., vol. 39(1), pages 321-345, January.
    Full references (including those not matched with items on IDEAS)

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Diefenbach, Heiko & Emde, Simon & Glock, Christoph H., 2020. "Loading tow trains ergonomically for just-in-time part supply," European Journal of Operational Research, Elsevier, vol. 284(1), pages 325-344.
    2. Simon Emde & Michael Schneider, 2018. "Just-In-Time Vehicle Routing for In-House Part Feeding to Assembly Lines," Transportation Science, INFORMS, vol. 52(3), pages 657-672, June.
    3. Emilio Moretti & Elena Tappia & Martina Mauri & Marco Melacini, 2022. "A performance model for mobile robot-based part feeding systems to supermarkets," Flexible Services and Manufacturing Journal, Springer, vol. 34(3), pages 580-613, September.
    4. Diefenbach, Heiko & Emde, Simon & Glock, Christoph H., 2023. "Multi-depot electric vehicle scheduling in in-plant production logistics considering non-linear charging models," European Journal of Operational Research, Elsevier, vol. 306(2), pages 828-848.
    5. Emde, Simon & Gendreau, Michel, 2017. "Scheduling in-house transport vehicles to feed parts to automotive assembly lines," European Journal of Operational Research, Elsevier, vol. 260(1), pages 255-267.
    6. C. Briand & Y. He & S. U. Ngueveu, 2018. "Energy-efficient planning for supplying assembly lines with vehicles," EURO Journal on Transportation and Logistics, Springer;EURO - The Association of European Operational Research Societies, vol. 7(4), pages 387-414, December.
    7. Boysen, Nils & Emde, Simon & Hoeck, Michael & Kauderer, Markus, 2015. "Part logistics in the automotive industry: Decision problems, literature review and research agenda," European Journal of Operational Research, Elsevier, vol. 242(1), pages 107-120.
    8. Masood Fathi & Morteza Ghobakhloo, 2020. "Enabling Mass Customization and Manufacturing Sustainability in Industry 4.0 Context: A Novel Heuristic Algorithm for in-Plant Material Supply Optimization," Sustainability, MDPI, vol. 12(16), pages 1-15, August.
    9. Boysen, Nils & Emde, Simon, 2014. "Scheduling the part supply of mixed-model assembly lines in line-integrated supermarkets," European Journal of Operational Research, Elsevier, vol. 239(3), pages 820-829.
    10. Simon Emde, 2017. "Scheduling the replenishment of just-in-time supermarkets in assembly plants," OR Spectrum: Quantitative Approaches in Management, Springer;Gesellschaft für Operations Research e.V., vol. 39(1), pages 321-345, January.
    11. Masood Fathi & Amir Nourmohammadi & Morteza Ghobakhloo & Milad Yousefi, 2020. "Production Sustainability via Supermarket Location Optimization in Assembly Lines," Sustainability, MDPI, vol. 12(11), pages 1-15, June.
    12. Mohammed Hichame Benbitour & Evren Sahin, 2018. "The use of internal cross-docking in just-in-time plants," Post-Print hal-01793491, HAL.
    13. Sternatz, Johannes, 2015. "The joint line balancing and material supply problem," International Journal of Production Economics, Elsevier, vol. 159(C), pages 304-318.
    14. Bock, Stefan, 2020. "Optimally solving a versatile Traveling Salesman Problem on tree networks with soft due dates and multiple congestion scenarios," European Journal of Operational Research, Elsevier, vol. 283(3), pages 863-882.
    15. Stefan Bock, 2016. "Finding optimal tour schedules on transportation paths under extended time window constraints," Journal of Scheduling, Springer, vol. 19(5), pages 527-546, October.
    16. Boysen, Nils & Schulze, Philipp & Scholl, Armin, 2022. "Assembly line balancing: What happened in the last fifteen years?," European Journal of Operational Research, Elsevier, vol. 301(3), pages 797-814.
    17. Daria Battini & Nils Boysen & Simon Emde, 2013. "Just-in-Time supermarkets for part supply in the automobile industry," Metrika: International Journal for Theoretical and Applied Statistics, Springer, vol. 24(2), pages 209-217, July.
    18. Masood Fathi & Victoria Rodríguez & Dalila B.M.M. Fontes & Maria Jesus Alvarez, 2016. "A modified particle swarm optimisation algorithm to solve the part feeding problem at assembly lines," International Journal of Production Research, Taylor & Francis Journals, vol. 54(3), pages 878-893, February.
    19. Lyu, Zhongyuan & Huang, George Q., 2023. "Cross-docking based factory logistics unitisation process: An approximate dynamic programming approach," European Journal of Operational Research, Elsevier, vol. 311(1), pages 112-124.
    20. Hanson, Robin & Finnsgård, Christian, 2014. "Impact of unit load size on in-plant materials supply efficiency," International Journal of Production Economics, Elsevier, vol. 147(PA), pages 46-52.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:spr:jsched:v:22:y:2019:i:6:d:10.1007_s10951-019-00606-w. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Sonal Shukla or Springer Nature Abstracting and Indexing (email available below). General contact details of provider: http://www.springer.com .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.