Advanced Search
MyIDEAS: Login to save this article or follow this journal

Minimizing variation of production rates in just-in-time systems: A survey

Contents:

Author Info

  • Kubiak, Wieslaw
Registered author(s):

    Abstract

    No abstract is available for this item.

    Download Info

    If you experience problems downloading a file, check if you have the proper application to view it first. In case of further problems read the IDEAS help page. Note that these files are not on the IDEAS site. Please be patient as the files may be large.
    File URL: http://www.sciencedirect.com/science/article/B6VCT-48NBDBN-14H/2/61116b91797551810c7834fe99c3654b
    Download Restriction: Full text for ScienceDirect subscribers only

    As the access to this document is restricted, you may want to look for a different version under "Related research" (further below) or search for a different version of it.

    Bibliographic Info

    Article provided by Elsevier in its journal European Journal of Operational Research.

    Volume (Year): 66 (1993)
    Issue (Month): 3 (May)
    Pages: 259-271

    as in new window
    Handle: RePEc:eee:ejores:v:66:y:1993:i:3:p:259-271

    Contact details of provider:
    Web page: http://www.elsevier.com/locate/eor

    Related research

    Keywords:

    References

    No references listed on IDEAS
    You can help add them by filling out this form.

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as in new window

    Cited by:
    1. Boysen, Nils & Bock, Stefan, 2011. "Scheduling just-in-time part supply for mixed-model assembly lines," European Journal of Operational Research, Elsevier, vol. 211(1), pages 15-25, May.
    2. Ding, Fong-Yuen & Zhu, Jin & Sun, Hui, 2006. "Comparing two weighted approaches for sequencing mixed-model assembly lines with multiple objectives," International Journal of Production Economics, Elsevier, vol. 102(1), pages 108-131, July.
    3. Takahashi, Katsuhiko & Nakamura, Nobuto, 2002. "Decentralized reactive Kanban system," European Journal of Operational Research, Elsevier, vol. 139(2), pages 262-276, June.
    4. Nils Boysen & Malte Fliedner & Armin Scholl, 2006. "Level-Scheduling bei Variantenfließfertigung: Klassifikation, Literaturüberblick und Modellkritik," Jenaer Schriften zur Wirtschaftswissenschaft 26/2006, Friedrich-Schiller-Universität Jena, Wirtschaftswissenschaftliche Fakultät.
    5. Nils Boysen & Armin Scholl & Nico Wopperer, 2011. "Resequencing of mixed-model assembly lines: Survey and research agenda," Jena Research Papers in Business and Economics - Working and Discussion Papers 03/2011, Friedrich-Schiller-University Jena, School of Economics and Business Administration.
    6. Balinski, Michel & Ramirez, Victoriano, 1999. "Parametric methods of apportionment, rounding and production," Mathematical Social Sciences, Elsevier, vol. 37(2), pages 107-122, March.
    7. Xiaobo, Zhao & Ohno, Katsuhisa, 2000. "Properties of a sequencing problem for a mixed model assembly line with conveyor stoppages," European Journal of Operational Research, Elsevier, vol. 124(3), pages 560-570, August.
    8. Steiner, George & Yeomans, Julian Scott, 1996. "Optimal level schedules in mixed-model, multi-level JIT assembly systems with pegging," European Journal of Operational Research, Elsevier, vol. 95(1), pages 38-52, November.
    9. Korkmazel, Tugrul & Meral, Sedef, 2001. "Bicriteria sequencing methods for the mixed-model assembly line in just-in-time production systems," European Journal of Operational Research, Elsevier, vol. 131(1), pages 188-207, May.
    10. Boysen, Nils & Fliedner, Malte & Scholl, Armin, 2009. "Sequencing mixed-model assembly lines: Survey, classification and model critique," European Journal of Operational Research, Elsevier, vol. 192(2), pages 349-373, January.
    11. García-Villoria, Alberto & Salhi, Said & Corominas, Albert & Pastor, Rafael, 2011. "Hyper-heuristic approaches for the response time variability problem," European Journal of Operational Research, Elsevier, vol. 211(1), pages 160-169, May.
    12. Jin, Mingzhou & Luo, Yi & Eksioglu, Sandra D., 2008. "Integration of production sequencing and outbound logistics in the automotive industry," International Journal of Production Economics, Elsevier, vol. 113(2), pages 766-774, June.
    13. Bautista, J. & Companys, R. & Corominas, A., 1996. "Heuristics and exact algorithms for solving the Monden problem," European Journal of Operational Research, Elsevier, vol. 88(1), pages 101-113, January.
    14. Albert Corominas & Alberto García-Villoria & Rafael Pastor, 2013. "Metaheuristic algorithms hybridised with variable neighbourhood search for solving the response time variability problem," TOP: An Official Journal of the Spanish Society of Statistics and Operations Research, Springer, vol. 21(2), pages 296-312, July.
    15. Joaquín Bautista & Ramon Companys & Albert Corominas, 1997. "Modelling and solving the production rate variation problem (PRVP)," TOP: An Official Journal of the Spanish Society of Statistics and Operations Research, Springer, vol. 5(2), pages 221-239, December.
    16. Nils Boysen & Malte Fliedner & Armin Scholl, 2006. "Produktionsplanung bei Variantenfließfertigung: Planungshierarchie und Hierarchische Planung," Jenaer Schriften zur Wirtschaftswissenschaft 22/2006, Friedrich-Schiller-Universität Jena, Wirtschaftswissenschaftliche Fakultät.
    17. Zhu, Jin & Ding, Fong-Yuen, 2000. "A transformed two-stage method for reducing the part-usage variation and a comparison of the product-level and part-level solutions in sequencing mixed-model assembly lines," European Journal of Operational Research, Elsevier, vol. 127(1), pages 203-216, November.

    Lists

    This item is not listed on Wikipedia, on a reading list or among the top items on IDEAS.

    Statistics

    Access and download statistics

    Corrections

    When requesting a correction, please mention this item's handle: RePEc:eee:ejores:v:66:y:1993:i:3:p:259-271. See general information about how to correct material in RePEc.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: (Zhang, Lei).

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If references are entirely missing, you can add them using this form.

    If the full references list an item that is present in RePEc, but the system did not link to it, you can help with this form.

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your profile, as there may be some citations waiting for confirmation.

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.