IDEAS home Printed from https://ideas.repec.org/a/spr/annopr/v280y2019i1d10.1007_s10479-019-03262-7.html
   My bibliography  Save this article

Formulation and solution of an optimal control problem for industrial project control

Author

Listed:
  • Klaus Werner Schmidt

    (Middle East Technical University)

  • Öncü Hazır

    (Rennes School of Business)

Abstract

In this paper, we consider the monitoring and control of industrial projects that are performed by executing different activities within a given time duration. Hereby, it is desired to apply project control to each activity in order to avoid unexpected deviations in the project cost, respecting that the amount and cost of project control needs to be limited. We model the general setting of industrial project control as an optimal control problem with the goal of maximizing the cost reduction (savings) when applying control, while meeting constraints on the control effort. We then prove that it is optimal to apply a constant control effort to each activity during a given time duration. Consequently, we show that the exact optimal control solution can be obtained by nonlinear programming. We illustrate our results by an application example from the construction industry.

Suggested Citation

  • Klaus Werner Schmidt & Öncü Hazır, 2019. "Formulation and solution of an optimal control problem for industrial project control," Annals of Operations Research, Springer, vol. 280(1), pages 337-350, September.
  • Handle: RePEc:spr:annopr:v:280:y:2019:i:1:d:10.1007_s10479-019-03262-7
    DOI: 10.1007/s10479-019-03262-7
    as

    Download full text from publisher

    File URL: http://link.springer.com/10.1007/s10479-019-03262-7
    File Function: Abstract
    Download Restriction: Access to the full text of the articles in this series is restricted.

    File URL: https://libkey.io/10.1007/s10479-019-03262-7?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Jan Weogon glarz, 1981. "Project Scheduling with Continuously-Divisible, Doubly Constrained Resources," Management Science, INFORMS, vol. 27(9), pages 1040-1053, September.
    2. Roy Cerqueti & Daniele Marazzina & Marco Ventura, 2016. "Optimal Investment in Research and Development Under Uncertainty," Journal of Optimization Theory and Applications, Springer, vol. 168(1), pages 296-309, January.
    3. Bruce A. Conway, 2012. "A Survey of Methods Available for the Numerical Optimization of Continuous Dynamic Systems," Journal of Optimization Theory and Applications, Springer, vol. 152(2), pages 271-306, February.
    4. Abel Cadenillas & Ricardo Huamán-Aguilar, 2016. "Explicit formula for the optimal government debt ceiling," Annals of Operations Research, Springer, vol. 247(2), pages 415-449, December.
    5. Ö Hazır & A Shtub, 2011. "Effects of the information presentation format on project control," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 62(12), pages 2157-2161, December.
    6. Haleh Valian & Mohsen A. Jafari & Davood Golmohammadi, 2016. "Resource allocation with stochastic optimal control approach," Annals of Operations Research, Springer, vol. 239(2), pages 625-641, April.
    7. Caroline Mota & Adiel Almeida, 2012. "A multicriteria decision model for assigning priority classes to activities in project management," Annals of Operations Research, Springer, vol. 199(1), pages 361-372, October.
    8. Raz, Tzvi & Erel, Erdal, 2000. "Optimal timing of project control points," European Journal of Operational Research, Elsevier, vol. 127(2), pages 252-261, December.
    9. A. Messica & A. Mehrez & I. David, 2000. "Optimal Expenditure Patterns of a Double-Path Engineering Project," Journal of Optimization Theory and Applications, Springer, vol. 105(2), pages 441-455, May.
    10. Ö Hazır & A Shtub, 2011. "Effects of the information presentation format on project control," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 62(12), pages 2157-2161, December.
    11. Hilal Al Hamadi & N. Sangeetha & B. Sivakumar, 2015. "Optimal control of service parameter for a perishable inventory system maintained at service facility with impatient customers," Annals of Operations Research, Springer, vol. 233(1), pages 3-23, October.
    12. Amir Azaron & Hideki Katagiri & Masatoshi Sakawa, 2007. "Time-cost trade-off via optimal control theory in Markov PERT networks," Annals of Operations Research, Springer, vol. 150(1), pages 47-64, March.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Sheshadri Chatterjee & Ranjan Chaudhuri & Sachin Kamble & Shivam Gupta & Uthayasankar Sivarajah, 2023. "Adoption of Artificial Intelligence and Cutting-Edge Technologies for Production System Sustainability: A Moderator-Mediation Analysis," Information Systems Frontiers, Springer, vol. 25(5), pages 1779-1794, October.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Krishnaswamy N. & Selvarasu A., 2016. "Exploring interrelationship between three performance indicators with PMI’s Nine Knowledge Areas for successful Project Management," International Journal of Finance, Insurance and Risk Management, International Journal of Finance, Insurance and Risk Management, vol. 6(3), pages 1162-1162.
    2. V. Radhamani & B. Sivakumar & G. Arivarignan, 2022. "A Comparative Study on Replenishment Policies for Perishable Inventory System with Service Facility and Multiple Server Vacation," OPSEARCH, Springer;Operational Research Society of India, vol. 59(1), pages 229-265, March.
    3. Emre Berk & Ülkü Gürler & Saeed Poormoaied, 2020. "On the $$\varvec{(Q,r)}$$(Q,r) policy for perishables with positive lead times and multiple outstanding orders," Annals of Operations Research, Springer, vol. 284(1), pages 81-98, January.
    4. Kogan, Konstantin & Shtub, Avraham, 1999. "Scheduling projects with variable-intensity activities: The case of dynamic earliness and tardiness costs," European Journal of Operational Research, Elsevier, vol. 118(1), pages 65-80, October.
    5. Govindan, Kannan & Jepsen, Martin Brandt, 2016. "ELECTRE: A comprehensive literature review on methodologies and applications," European Journal of Operational Research, Elsevier, vol. 250(1), pages 1-29.
    6. Richters, Oliver, 2021. "Modeling the out-of-equilibrium dynamics of bounded rationality and economic constraints," Journal of Economic Behavior & Organization, Elsevier, vol. 188(C), pages 846-866.
    7. Hartmann, Sönke & Briskorn, Dirk, 2010. "A survey of variants and extensions of the resource-constrained project scheduling problem," European Journal of Operational Research, Elsevier, vol. 207(1), pages 1-14, November.
    8. Mauro Pontani, 2021. "Optimal Space Trajectories with Multiple Coast Arcs Using Modified Equinoctial Elements," Journal of Optimization Theory and Applications, Springer, vol. 191(2), pages 545-574, December.
    9. Talla Nobibon, Fabrice & Leus, Roel & Nip, Kameng & Wang, Zhenbo, 2015. "Resource loading with time windows," European Journal of Operational Research, Elsevier, vol. 244(2), pages 404-416.
    10. Jussi Lindgren, 2021. "Examination of Interest-Growth Differentials and the Risk of Sovereign Insolvency," Risks, MDPI, vol. 9(4), pages 1-14, April.
    11. Catalina García & José Pérez & Salvador Rambaud, 2010. "Proposal of a new distribution in PERT methodology," Annals of Operations Research, Springer, vol. 181(1), pages 515-538, December.
    12. Yaghoubi, Saeed & Noori, Siamak & Azaron, Amir & Fynes, Brian, 2015. "Resource allocation in multi-class dynamic PERT networks with finite capacity," European Journal of Operational Research, Elsevier, vol. 247(3), pages 879-894.
    13. Azaron, A. & Brown, K.N. & Tarim, S.A. & Modarres, M., 2008. "A multi-objective stochastic programming approach for supply chain design considering risk," International Journal of Production Economics, Elsevier, vol. 116(1), pages 129-138, November.
    14. Mauro Pontani & Bruce Conway, 2014. "Optimal Low-Thrust Orbital Maneuvers via Indirect Swarming Method," Journal of Optimization Theory and Applications, Springer, vol. 162(1), pages 272-292, July.
    15. Hua Wang & Jon Dieringer & Steve Guntz & Shankarraman Vaidyaraman & Shekhar Viswanath & Nikolaos H. Lappas & Sal Garcia-Munoz & Chrysanthos E. Gounaris, 2021. "Portfolio-Wide Optimization of Pharmaceutical R&D Activities Using Mathematical Programming," Interfaces, INFORMS, vol. 51(4), pages 262-279, July.
    16. Kadziński, Miłosz & Tervonen, Tommi & Rui Figueira, José, 2015. "Robust multi-criteria sorting with the outranking preference model and characteristic profiles," Omega, Elsevier, vol. 55(C), pages 126-140.
    17. Narjes Sabeghi & Hamed Reza Tareghian, 2020. "Using the generalized maximum covering location model to control a project’s progress," Computational Management Science, Springer, vol. 17(1), pages 1-21, January.
    18. Cerqueti, Roy & Quaranta, Anna Grazia & Ventura, Marco, 2016. "Innovation, imitation and policy inaction," Technological Forecasting and Social Change, Elsevier, vol. 111(C), pages 22-30.
    19. Ballestí­n, Francisco & Valls, Vicente & Quintanilla, Sacramento, 2008. "Pre-emption in resource-constrained project scheduling," European Journal of Operational Research, Elsevier, vol. 189(3), pages 1136-1152, September.
    20. Ö Hazır & A Shtub, 2011. "Effects of the information presentation format on project control," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 62(12), pages 2157-2161, December.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:spr:annopr:v:280:y:2019:i:1:d:10.1007_s10479-019-03262-7. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Sonal Shukla or Springer Nature Abstracting and Indexing (email available below). General contact details of provider: http://www.springer.com .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.