IDEAS home Printed from https://ideas.repec.org/a/pal/jorsoc/v58y2007i6d10.1057_palgrave.jors.2602198.html
   My bibliography  Save this article

Forecasting both time varying MTBF of fighter aircraft module and expected demand of minor parts

Author

Listed:
  • K B Yoon

    (Yonsei University)

  • S Y Sohn

    (Yonsei University)

Abstract

A fundamental aspect of inventory management of fighter aircraft is to forecast the demand of minor parts installed in the main module. Most of the existing inventory models do not take into account the time-varying characteristics of modules composed of minor parts even though the demand rate of minor parts is sensitive to the conditions of module. In this paper, we propose random-effects regression models to forecast the mean time between failure (MTBF) of modules and the expected demand for the minor parts in the module based on time-varying characteristics of modules. Subsequently, we show how they can be applied to find necessary seasonal demand of minor parts. Our study is expected to contribute to ROKAF (Republic of Korea Air Force) in terms of providing base information for inventory policy for minor parts.

Suggested Citation

  • K B Yoon & S Y Sohn, 2007. "Forecasting both time varying MTBF of fighter aircraft module and expected demand of minor parts," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 58(6), pages 714-719, June.
  • Handle: RePEc:pal:jorsoc:v:58:y:2007:i:6:d:10.1057_palgrave.jors.2602198
    DOI: 10.1057/palgrave.jors.2602198
    as

    Download full text from publisher

    File URL: http://link.springer.com/10.1057/palgrave.jors.2602198
    File Function: Abstract
    Download Restriction: Access to full text is restricted to subscribers.

    File URL: https://libkey.io/10.1057/palgrave.jors.2602198?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Vaughan, Timothy S., 2005. "Failure replacement and preventive maintenance spare parts ordering policy," European Journal of Operational Research, Elsevier, vol. 161(1), pages 183-190, February.
    2. Fujiwara, Okitsugu & Sedarage, Dayani, 1997. "An optimal (Q,r) policy for a multipart assembly system under stochastic part procurement lead times," European Journal of Operational Research, Elsevier, vol. 100(3), pages 550-556, August.
    3. Hill, Roger M., 1997. "Applying Bayesian methodology with a uniform prior to the single period inventory model," European Journal of Operational Research, Elsevier, vol. 98(3), pages 555-562, May.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. S Y Sohn & Y Kim & B T Kim, 2009. "Cost of ownership model for spare engines purchase for the Korean navy acquisition program," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 60(12), pages 1674-1682, December.
    2. S Y Sohn & K B Yoon, 2010. "Dynamic preventive maintenance scheduling of the modules of fighter aircraft based on random effects regression model," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 61(6), pages 974-979, June.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Mostard, Julien & Teunter, Ruud, 2006. "The newsboy problem with resalable returns: A single period model and case study," European Journal of Operational Research, Elsevier, vol. 169(1), pages 81-96, February.
    2. Ye, Yuan & Lu, Yonggang & Robinson, Powell & Narayanan, Arunachalam, 2022. "An empirical Bayes approach to incorporating demand intermittency and irregularity into inventory control," European Journal of Operational Research, Elsevier, vol. 303(1), pages 255-272.
    3. Halkos, George & Kevork, Ilias, 2012. "Validity and precision of estimates in the classical newsvendor model with exponential and rayleigh demand," MPRA Paper 36460, University Library of Munich, Germany.
    4. Gel, Esma S. & Salman, F. Sibel, 2022. "Dynamic ordering decisions with approximate learning of supply yield uncertainty," International Journal of Production Economics, Elsevier, vol. 243(C).
    5. Kevork, Ilias S., 2010. "Estimating the optimal order quantity and the maximum expected profit for single-period inventory decisions," Omega, Elsevier, vol. 38(3-4), pages 218-227, June.
    6. Wang, Wenbin & Banjevic, Dragan, 2012. "Ergodicity of forward times of the renewal process in a block-based inspection model using the delay time concept," Reliability Engineering and System Safety, Elsevier, vol. 100(C), pages 1-7.
    7. Louly, Mohamed-Aly & Dolgui, Alexandre, 2011. "Optimal time phasing and periodicity for MRP with POQ policy," International Journal of Production Economics, Elsevier, vol. 131(1), pages 76-86, May.
    8. Wang, Wenbin, 2011. "A joint spare part and maintenance inspection optimisation model using the Delay-Time concept," Reliability Engineering and System Safety, Elsevier, vol. 96(11), pages 1535-1541.
    9. Biyu He & Franklin Dexter & Alex Macario & Stefanos Zenios, 2012. "The Timing of Staffing Decisions in Hospital Operating Rooms: Incorporating Workload Heterogeneity into the Newsvendor Problem," Manufacturing & Service Operations Management, INFORMS, vol. 14(1), pages 99-114, January.
    10. Louly, Mohamed-Aly Ould & Dolgui, Alexandre, 2009. "Calculating safety stocks for assembly systems with random component procurement lead times: A branch and bound algorithm," European Journal of Operational Research, Elsevier, vol. 199(3), pages 723-731, December.
    11. Zhang, Xiaohong & Zeng, Jianchao, 2017. "Joint optimization of condition-based opportunistic maintenance and spare parts provisioning policy in multiunit systems," European Journal of Operational Research, Elsevier, vol. 262(2), pages 479-498.
    12. Halkos, George & Kevork, Ilias, 2012. "Evaluating alternative estimators for optimal order quantities in the newsvendor model with skewed demand," MPRA Paper 36205, University Library of Munich, Germany.
    13. Khouja, Moutaz, 1999. "The single-period (news-vendor) problem: literature review and suggestions for future research," Omega, Elsevier, vol. 27(5), pages 537-553, October.
    14. Zahedi-Hosseini, Farhad & Scarf, Philip & Syntetos, Aris, 2017. "Joint optimisation of inspection maintenance and spare parts provisioning: a comparative study of inventory policies using simulation and survey data," Reliability Engineering and System Safety, Elsevier, vol. 168(C), pages 306-316.
    15. Eungab Kim & Kaphoon Lee & Suk-Ho Kang, 2006. "Optimal purchasing policy in a two-component assembly system with different purchasing contracts for each component," Mathematical Methods of Operations Research, Springer;Gesellschaft für Operations Research (GOR);Nederlands Genootschap voor Besliskunde (NGB), vol. 63(2), pages 301-327, May.
    16. Nguyen, T.P. Khanh & Yeung, Thomas G. & Castanier, Bruno, 2013. "Optimal maintenance and replacement decisions under technological change with consideration of spare parts inventories," International Journal of Production Economics, Elsevier, vol. 143(2), pages 472-477.
    17. Z Hua & J Yang & F Huang & X Xu, 2009. "A static-dynamic strategy for spare part inventory systems with nonstationary stochastic demand," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 60(9), pages 1254-1263, September.
    18. Brito, Anderson J. & de Almeida, Adiel T., 2012. "Modeling a multi-attribute utility newsvendor with partial backlogging," European Journal of Operational Research, Elsevier, vol. 220(3), pages 820-830.
    19. Vernon Ning Hsu & Chung Yee Lee & Kut C. So, 2006. "Optimal Component Stocking Policy for Assemble-to-Order Systems with Lead-Time-Dependent Component and Product Pricing," Management Science, INFORMS, vol. 52(3), pages 337-351, March.
    20. Boutselis, Petros & McNaught, Ken, 2014. "Finite-Time Horizon Logistics Decision Making Problems: Consideration of a Wider Set of Factors," Chapters from the Proceedings of the Hamburg International Conference of Logistics (HICL), in: Blecker, Thorsten & Kersten, Wolfgang & Ringle, Christian M. (ed.), Innovative Methods in Logistics and Supply Chain Management: Current Issues and Emerging Practices. Proceedings of the Hamburg International Conferenc, volume 19, pages 249-274, Hamburg University of Technology (TUHH), Institute of Business Logistics and General Management.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:pal:jorsoc:v:58:y:2007:i:6:d:10.1057_palgrave.jors.2602198. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Sonal Shukla or Springer Nature Abstracting and Indexing (email available below). General contact details of provider: http://www.palgrave-journals.com/ .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.