IDEAS home Printed from https://ideas.repec.org/a/gam/jsusta/v13y2021i23p13174-d690032.html
   My bibliography  Save this article

Proposing a New Methodology for Monument Conservation “SCOPE MANAGEMENT” by the Use of an Analytic Hierarchy Process Project Management Institute System and the ICOMOS Burra Charter

Author

Listed:
  • Nina Almasifar

    (Faculty of Architecture, University of Çukurova, Adana 1380, Turkey)

  • Tülay Özdemir Canbolat

    (Faculty of Architecture, University of Çukurova, Adana 1380, Turkey)

  • Milad Akhavan

    (Faculty of Environmental Engineering, College of Engineering, University of Tehran, Tehran 1417935840, Iran)

  • Roberto Alonso González-Lezcano

    (Architecture and Design Department, Escuela Politécnica Superior, Montepríncipe Campus de Boadilla del Monte, Universidad San Pablo-CEU, 28668 Madrid, Spain)

Abstract

Managing the scope of the “Properties” and “Performances” domains plays a fundamental role in the scheduling and controlling of the wide variety of variables and processes involved in any project, for the purpose of increasing the quality of outputs, which leads to time and budget-saving. Notably, in monument conservation projects, “scope management” is a vital factor targeted at maintaining historical parameter values and accuracy in the number of interferences and occupations on sites. Nowadays, as urbanization speeds up unprecedently, the territories of these heritage sites have been demolished or have lost their place on the World Heritage List. Undoubtedly, the existence of such critical conditions makes it increasingly necessary to apply scope management methods to preserve such archaeological and historic sites across the world. The purpose of this article is to propose a “Comprehensive and Regular Systematic Schedule” for the purpose of monument conservation via the use of scope management, based on the International Council on Monuments and Sites (ICOMOS)—specifically the Burra Charter (1981). The results of this research include hierarchical levels of management processes which consider all the effective variables, both the tangible and intangible elements (independent factors) and the other weaknesses and opportunities of the project in order to determine the scope of the required operations, which must be scheduled based on historical sites’ conservation charters. In this way, in addition to reviving a cultural landscape’s (cultural heritage or site) essential and valuable parts, unnecessary changes can be avoided.

Suggested Citation

  • Nina Almasifar & Tülay Özdemir Canbolat & Milad Akhavan & Roberto Alonso González-Lezcano, 2021. "Proposing a New Methodology for Monument Conservation “SCOPE MANAGEMENT” by the Use of an Analytic Hierarchy Process Project Management Institute System and the ICOMOS Burra Charter," Sustainability, MDPI, vol. 13(23), pages 1-13, November.
  • Handle: RePEc:gam:jsusta:v:13:y:2021:i:23:p:13174-:d:690032
    as

    Download full text from publisher

    File URL: https://www.mdpi.com/2071-1050/13/23/13174/pdf
    Download Restriction: no

    File URL: https://www.mdpi.com/2071-1050/13/23/13174/
    Download Restriction: no
    ---><---

    References listed on IDEAS

    as
    1. Ngoc Thach Pham & Anh Duc Do & Quang Vinh Nguyen & Van Loi Ta & Thi Thanh Binh Dao & Dieu Linh Ha & Xuan Truong Hoang, 2021. "Research on Knowledge Management Models at Universities Using Fuzzy Analytic Hierarchy Process (FAHP)," Sustainability, MDPI, vol. 13(2), pages 1-15, January.
    2. Huan Yang & Ling Qiu & Xin Fu, 2021. "Toward Cultural Heritage Sustainability through Participatory Planning Based on Investigation of the Value Perceptions and Preservation Attitudes: Qing Mu Chuan, China," Sustainability, MDPI, vol. 13(3), pages 1-14, January.
    3. Yeeun Shin & Suyeon Kim & Sang-Woo Lee & Kyungjin An, 2020. "Identifying the Planning Priorities for Green Infrastructure within Urban Environments Using Analytic Hierarchy Process," Sustainability, MDPI, vol. 12(13), pages 1-13, July.
    4. Vaidya, Omkarprasad S. & Kumar, Sushil, 2006. "Analytic hierarchy process: An overview of applications," European Journal of Operational Research, Elsevier, vol. 169(1), pages 1-29, February.
    Full references (including those not matched with items on IDEAS)

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Garyfallos Arabatzis & Georgios Kolkos & Anastasia Stergiadou & Apostolos Kantartzis & Stergios Tampekis, 2024. "Optimal Allocation of Water Reservoirs for Sustainable Wildfire Prevention Planning via AHP-TOPSIS and Forest Road Network Analysis," Sustainability, MDPI, vol. 16(2), pages 1-27, January.
    2. Sushil, 2019. "Efficient interpretive ranking process incorporating implicit and transitive dominance relationships," Annals of Operations Research, Springer, vol. 283(1), pages 1489-1516, December.
    3. Wang, Ying-Ming & Elhag, Taha M.S., 2007. "A goal programming method for obtaining interval weights from an interval comparison matrix," European Journal of Operational Research, Elsevier, vol. 177(1), pages 458-471, February.
    4. Madjid Tavana & Mariya Sodenkamp & Leena Suhl, 2010. "A soft multi-criteria decision analysis model with application to the European Union enlargement," Annals of Operations Research, Springer, vol. 181(1), pages 393-421, December.
    5. Lim, Chulmin & Rowsell, Joe & Kim, Seongcheol, 2023. "Exploring the killer domains to create new value: A Comparative case study of Canadian and Korean telcos," 32nd European Regional ITS Conference, Madrid 2023: Realising the digital decade in the European Union – Easier said than done? 277998, International Telecommunications Society (ITS).
    6. Wenshuai Wu & Gang Kou, 2016. "A group consensus model for evaluating real estate investment alternatives," Financial Innovation, Springer;Southwestern University of Finance and Economics, vol. 2(1), pages 1-10, December.
    7. Rubio-Aliaga, Alvaro & García-Cascales, M. Socorro & Sánchez-Lozano, Juan Miguel & Molina-Garcia, Angel, 2021. "MCDM-based multidimensional approach for selection of optimal groundwater pumping systems: Design and case example," Renewable Energy, Elsevier, vol. 163(C), pages 213-224.
    8. Zhu, Bin & Xu, Zeshui, 2014. "Stochastic preference analysis in numerical preference relations," European Journal of Operational Research, Elsevier, vol. 237(2), pages 628-633.
    9. Wang, Ying-Ming & Luo, Ying & Hua, Zhongsheng, 2008. "On the extent analysis method for fuzzy AHP and its applications," European Journal of Operational Research, Elsevier, vol. 186(2), pages 735-747, April.
    10. Jing Xu & Ren Zhang & Yangjun Wang & Hengqian Yan & Quanhong Liu & Yutong Guo & Yongcun Ren, 2022. "A New Framework for Assessment of Offshore Wind Farm Location," Energies, MDPI, vol. 15(18), pages 1-17, September.
    11. M Tavana & M A Sodenkamp, 2010. "A fuzzy multi-criteria decision analysis model for advanced technology assessment at Kennedy Space Center," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 61(10), pages 1459-1470, October.
    12. Shiyao Zhu & Dezhi Li & Haibo Feng & Tiantian Gu & Jiawei Zhu, 2019. "AHP-TOPSIS-Based Evaluation of the Relative Performance of Multiple Neighborhood Renewal Projects: A Case Study in Nanjing, China," Sustainability, MDPI, vol. 11(17), pages 1-17, August.
    13. Jingya Qiao & Mo Wang & Dongqing Zhang & Chenyang Ding & Jingjing Wang & Dawei Xu, 2017. "Synergetic Development Assessment of Urban River System Landscapes," Sustainability, MDPI, vol. 9(12), pages 1-15, November.
    14. Baffoe, Gideon, 2019. "Exploring the utility of Analytic Hierarchy Process (AHP) in ranking livelihood activities for effective and sustainable rural development interventions in developing countries," Evaluation and Program Planning, Elsevier, vol. 72(C), pages 197-204.
    15. Lucas, Rochelle Irene & Promentilla, Michael Angelo & Ubando, Aristotle & Tan, Raymond Girard & Aviso, Kathleen & Yu, Krista Danielle, 2017. "An AHP-based evaluation method for teacher training workshop on information and communication technology," Evaluation and Program Planning, Elsevier, vol. 63(C), pages 93-100.
    16. Reed, Brinton & Chan-Halbrendt, Catherine & Tamang, B.B. & Chaudhary, Narendra, 2014. "Analysis of conservation agriculture preferences for researchers, extension agents, and tribal farmers in Nepal using Analytic Hierarchy Process," Agricultural Systems, Elsevier, vol. 127(C), pages 90-96.
    17. J Aznar & J Ferrís-Oñate & F Guijarro, 2010. "An ANP framework for property pricing combining quantitative and qualitative attributes," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 61(5), pages 740-755, May.
    18. Rahul S. Mor & Arvind Bhardwaj & Sarbjit Singh, 2019. "Integration of SWOT-AHP Approach for Measuring the Critical Factors of Dairy Supply Chain," Logistics, MDPI, vol. 3(1), pages 1-14, February.
    19. Koray Altintas & Ozalp Vayvay & Sinan Apak & Emine Cobanoglu, 2020. "An Extended GRA Method Integrated with Fuzzy AHP to Construct a Multidimensional Index for Ranking Overall Energy Sustainability Performances," Sustainability, MDPI, vol. 12(4), pages 1-21, February.
    20. Huaizhi Su & Meng Yang & Zhiping Wen, 2015. "Multi-Layer Multi-Index Comprehensive Evaluation for Dike Safety," Water Resources Management: An International Journal, Published for the European Water Resources Association (EWRA), Springer;European Water Resources Association (EWRA), vol. 29(13), pages 4683-4699, October.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:gam:jsusta:v:13:y:2021:i:23:p:13174-:d:690032. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: MDPI Indexing Manager (email available below). General contact details of provider: https://www.mdpi.com .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.