IDEAS home Printed from https://ideas.repec.org/a/gam/jlogis/v7y2023i4p67-d1245871.html
   My bibliography  Save this article

Carbon Emissions Effect on Vendor-Managed Inventory System Considering Displaced Re-Start-Up Production Time

Author

Listed:
  • Adel A. Alamri

    (Department of Business Administration, College of Business Administration, Majmaah University, Majmaah 11952, Saudi Arabia)

Abstract

Background : The classical mathematical formulation of the vendor-managed inventory (VMI) model assumes an infinite planning horizon, and consequently, the solution derived ignored the impact of the first cycle. The classical formulation is associated with another implicit assumption that input parameters remain static indefinitely. Methods : This paper develops two mathematical models for VMI for a joint economic lot-sizing (JELS) policy. Each model considers investment in green production, energy used for keeping items in storage, and carbon emissions from production, storage, and transportation activities under the carbon cap-and-trade policy. The first model underlies the first cycle, while the second underlies subsequent cycles. Results : The re-start-up production time for subsequent cycles commences only at the time required to produce and replenish the first lot, which implies further cost reduction. Mathematical formulations are perceived as important both for academics and practitioners. For example, the base model of the first cycle (subsequent cycles) generates an optimal produced quantity with 18.42% (4.35%) less total system cost when compared with the pest scenario in favor of the existing literature. Moreover, such a percentage of total system cost reduction increases as the production rate increases. Further, the proposed models not only produce better results but also offer the opportunity to adjust the input parameters for subsequent cycles, where each cycle is independent from the previous one. Conclusions : The emissions generated by the system are very much related to the demand rate and the amount of investment in green production. Illustrative examples, special cases, model overview, and managerial insights are given. The discussion related to the contribution of the proposed model, the concluding remarks, and further research are also provided. The proposed model rectifies the base model adopted by the existing literature, which can be further extended to be implemented in several interesting further inquiries related to JELS inventory mathematical modeling.

Suggested Citation

  • Adel A. Alamri, 2023. "Carbon Emissions Effect on Vendor-Managed Inventory System Considering Displaced Re-Start-Up Production Time," Logistics, MDPI, vol. 7(4), pages 1-29, September.
  • Handle: RePEc:gam:jlogis:v:7:y:2023:i:4:p:67-:d:1245871
    as

    Download full text from publisher

    File URL: https://www.mdpi.com/2305-6290/7/4/67/pdf
    Download Restriction: no

    File URL: https://www.mdpi.com/2305-6290/7/4/67/
    Download Restriction: no
    ---><---

    References listed on IDEAS

    as
    1. Hua, Guowei & Cheng, T.C.E. & Wang, Shouyang, 2011. "Managing carbon footprints in inventory management," International Journal of Production Economics, Elsevier, vol. 132(2), pages 178-185, August.
    2. Glock, C. H. & Kim, T., 2012. "A joint economic lot sizemodel with returnable transport items," Publications of Darmstadt Technical University, Institute for Business Studies (BWL) 59079, Darmstadt Technical University, Department of Business Administration, Economics and Law, Institute for Business Studies (BWL).
    3. Qingguo Bai & Yeming Gong & Mingzhou Jin & Xianhao Xu, 2019. "Effects of carbon emission reduction on supply chain coordination with vendor-managed deteriorating product inventory," Post-Print hal-02312264, HAL.
    4. De Giovanni, Pietro & Karray, Salma & Martín-Herrán, Guiomar, 2019. "Vendor Management Inventory with consignment contracts and the benefits of cooperative advertising," European Journal of Operational Research, Elsevier, vol. 272(2), pages 465-480.
    5. Rad, M. A. & Khoshalhan, F. & Glock, C. H., 2018. "Optimal production and distribution policies for a two-stage supply chain with imperfect items and price- and advertisement-sensitive demand: A note," Publications of Darmstadt Technical University, Institute for Business Studies (BWL) 84500, Darmstadt Technical University, Department of Business Administration, Economics and Law, Institute for Business Studies (BWL).
    6. X.J. Wang & S.H. Choi, 2016. "Impacts of carbon emission reduction mechanisms on uncertain make-to-order manufacturing," International Journal of Production Research, Taylor & Francis Journals, vol. 54(11), pages 3311-3328, June.
    7. Saravanan Venkatachalam & Arunachalam Narayanan, 2016. "Efficient formulation and heuristics for multi-item single source ordering problem with transportation cost," International Journal of Production Research, Taylor & Francis Journals, vol. 54(14), pages 4087-4103, July.
    8. Angappa Gunasekaran & Zahir Irani & Thanos Papadopoulos, 2014. "Modelling and analysis of sustainable operations management: certain investigations for research and applications," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 65(6), pages 806-823, June.
    9. Dong, Yan & Xu, Kefeng, 2002. "A supply chain model of vendor managed inventory," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 38(2), pages 75-95, April.
    10. Tarhini, Hussein & Karam, Mario & Jaber, Mohamad Y., 2020. "An integrated single-vendor multi-buyer production inventory model with transshipments between buyers," International Journal of Production Economics, Elsevier, vol. 225(C).
    11. Sarkar, Biswajit & Saren, Sharmila, 2016. "Product inspection policy for an imperfect production system with inspection errors and warranty cost," European Journal of Operational Research, Elsevier, vol. 248(1), pages 263-271.
    12. Adel A. Alamri, 2023. "A Sustainable Closed-Loop Supply Chains Inventory Model Considering Optimal Number of Remanufacturing Times," Sustainability, MDPI, vol. 15(12), pages 1-23, June.
    13. Phan, Dinh Anh & Vo, Thi Le Hoa & Lai, Anh Ngoc & Nguyen, Thi Lan Anh, 2019. "Coordinating contracts for VMI systems under manufacturer-CSR and retailer-marketing efforts," International Journal of Production Economics, Elsevier, vol. 211(C), pages 98-118.
    14. Asif Iqbal Malik & Byung Soo Kim, 2020. "A Constrained Production System Involving Production Flexibility and Carbon Emissions," Mathematics, MDPI, vol. 8(2), pages 1-21, February.
    15. B.C. Giri & A. Chakraborty & T. Maiti, 2017. "Consignment stock policy with unequal shipments and process unreliability for a two-level supply chain," International Journal of Production Research, Taylor & Francis Journals, vol. 55(9), pages 2489-2505, May.
    16. Steven A. Lippman, 1971. "Economic Order Quantities and Multiple Set-Up Costs," Management Science, INFORMS, vol. 18(1), pages 39-47, September.
    17. Rekik, Yacine & Syntetos, Aris & Jemai, Zied, 2015. "An e-retailing supply chain subject to inventory inaccuracies," International Journal of Production Economics, Elsevier, vol. 167(C), pages 139-155.
    18. Bai, Qingguo & Gong, Yeming (Yale) & Jin, Mingzhou & Xu, Xianhao, 2019. "Effects of carbon emission reduction on supply chain coordination with vendor-managed deteriorating product inventory," International Journal of Production Economics, Elsevier, vol. 208(C), pages 83-99.
    19. Yacine Rekik & Aris Syntetos & Zied Jemai, 2015. "An e-Retailing Supply Chain Subject to Inventory Inaccuracies," Post-Print hal-02313281, HAL.
    20. Tiwari, Sunil & Kazemi, Nima & Modak, Nikunja Mohan & Cárdenas-Barrón, Leopoldo Eduardo & Sarkar, Sumon, 2020. "The effect of human errors on an integrated stochastic supply chain model with setup cost reduction and backorder price discount," International Journal of Production Economics, Elsevier, vol. 226(C).
    21. Glock, C. H., 2012. "The joint economic lot size problem: a review," Publications of Darmstadt Technical University, Institute for Business Studies (BWL) 57811, Darmstadt Technical University, Department of Business Administration, Economics and Law, Institute for Business Studies (BWL).
    22. Konur, Dinçer, 2014. "Carbon constrained integrated inventory control and truckload transportation with heterogeneous freight trucks," International Journal of Production Economics, Elsevier, vol. 153(C), pages 268-279.
    23. M. Ganesh Kumar & R. Uthayakumar, 2019. "Modelling on vendor-managed inventory policies with equal and unequal shipments under GHG emission-trading scheme," International Journal of Production Research, Taylor & Francis Journals, vol. 57(11), pages 3362-3381, June.
    24. Glock, Christoph H., 2012. "The joint economic lot size problem: A review," International Journal of Production Economics, Elsevier, vol. 135(2), pages 671-686.
    Full references (including those not matched with items on IDEAS)

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Tiwari, Sunil & Kazemi, Nima & Modak, Nikunja Mohan & Cárdenas-Barrón, Leopoldo Eduardo & Sarkar, Sumon, 2020. "The effect of human errors on an integrated stochastic supply chain model with setup cost reduction and backorder price discount," International Journal of Production Economics, Elsevier, vol. 226(C).
    2. Daryanto, Yosef & Wee, Hui Ming & Astanti, Ririn Diar, 2019. "Three-echelon supply chain model considering carbon emission and item deterioration," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 122(C), pages 368-383.
    3. Asif Iqbal Malik & Biswajit Sarkar, 2020. "Coordination Supply Chain Management Under Flexible Manufacturing, Stochastic Leadtime Demand, and Mixture of Inventory," Mathematics, MDPI, vol. 8(6), pages 1-32, June.
    4. Andriolo, Alessandro & Battini, Daria & Grubbström, Robert W. & Persona, Alessandro & Sgarbossa, Fabio, 2014. "A century of evolution from Harris׳s basic lot size model: Survey and research agenda," International Journal of Production Economics, Elsevier, vol. 155(C), pages 16-38.
    5. Konur, Dinçer, 2017. "Non-collaborative emission targets joining and quantity flow decisions in a Stackelberg setting," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 105(C), pages 60-82.
    6. K. F. Mary Latha & M. Ganesh Kumar & R. Uthayakumar, 2021. "Two echelon economic lot sizing problems with geometric shipment policy backorder price discount and optimal investment to reduce ordering cost," OPSEARCH, Springer;Operational Research Society of India, vol. 58(4), pages 1133-1163, December.
    7. Taleizadeh, Ata Allah & Shokr, Iman & Konstantaras, Ioannis & VafaeiNejad, Mahyar, 2020. "Stock replenishment policies for a vendor-managed inventory in a retailing system," Journal of Retailing and Consumer Services, Elsevier, vol. 55(C).
    8. Tarhini, Hussein & Karam, Mario & Jaber, Mohamad Y., 2020. "An integrated single-vendor multi-buyer production inventory model with transshipments between buyers," International Journal of Production Economics, Elsevier, vol. 225(C).
    9. Castellano, Davide & Gallo, Mosè & Grassi, Andrea & Santillo, Liberatina C., 2019. "The effect of GHG emissions on production, inventory replenishment and routing decisions in a single vendor-multiple buyers supply chain," International Journal of Production Economics, Elsevier, vol. 218(C), pages 30-42.
    10. Jonas C.P. Yu & Kung-Jeng Wang & Yu-Siang Lin, 2016. "Managing dual warehouses with an incentive policy for deteriorating items," International Journal of Systems Science, Taylor & Francis Journals, vol. 47(3), pages 586-602, February.
    11. Adeinat, Hamza & Pazhani, Subramanian & Mendoza, Abraham & Ventura, Jose A., 2022. "Coordination of pricing and inventory replenishment decisions in a supply chain with multiple geographically dispersed retailers," International Journal of Production Economics, Elsevier, vol. 248(C).
    12. Noblesse, Ann M. & Boute, Robert N. & Lambrecht, Marc R. & Van Houdt, Benny, 2014. "Lot sizing and lead time decisions in production/inventory systems," International Journal of Production Economics, Elsevier, vol. 155(C), pages 351-360.
    13. Chan, Chi Kin & Fang, Fei & Langevin, André, 2018. "Single-vendor multi-buyer supply chain coordination with stochastic demand," International Journal of Production Economics, Elsevier, vol. 206(C), pages 110-133.
    14. Jawad, Hussam & Jaber, Mohamad Y. & Nuwayhid, Rida Y., 2018. "Improving supply chain sustainability using exergy analysis," European Journal of Operational Research, Elsevier, vol. 269(1), pages 258-271.
    15. Pal, Brojeswar & Sana, Shib Sankar & Chaudhuri, Kripasindhu, 2014. "Joint pricing and ordering policy for two echelon imperfect production inventory model with two cycles," International Journal of Production Economics, Elsevier, vol. 155(C), pages 229-238.
    16. Faranak Emtehani & Nasim Nahavandi & Farimah Mokhatab Rafiei, 2021. "A joint inventory–finance model for coordinating a capital-constrained supply chain with financing limitations," Financial Innovation, Springer;Southwestern University of Finance and Economics, vol. 7(1), pages 1-39, December.
    17. Herbon, Avi, 2020. "An approximated solution to the constrained integrated manufacturer-buyer supply problem," Operations Research Perspectives, Elsevier, vol. 7(C).
    18. Meherishi, Lavanya & Narayana, Sushmita A. & Ranjani, K.S., 2021. "Integrated product and packaging decisions with secondary packaging returns and protective packaging management," European Journal of Operational Research, Elsevier, vol. 292(3), pages 930-952.
    19. Beatrice Marchi & Simone Zanoni & Mohamad Y. Jaber, 2020. "Improving Supply Chain Profit through Reverse Factoring: A New Multi-Suppliers Single-Vendor Joint Economic Lot Size Model," IJFS, MDPI, vol. 8(2), pages 1-16, April.
    20. Ali Ekici & Baṣak Altan & Okan Örsan Özener, 2016. "Pricing decisions in a strategic single retailer/dual suppliers setting under order size constraints," International Journal of Production Research, Taylor & Francis Journals, vol. 54(7), pages 1887-1898, April.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:gam:jlogis:v:7:y:2023:i:4:p:67-:d:1245871. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: MDPI Indexing Manager (email available below). General contact details of provider: https://www.mdpi.com .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.