IDEAS home Printed from https://ideas.repec.org/a/eee/trapol/v73y2019icp152-161.html
   My bibliography  Save this article

The effect of critical success factors on project success in Public-Private Partnership projects: A case study of highway projects in Iran

Author

Listed:
  • Ahmadabadi, Ali Akbari
  • Heravi, Gholamreza

Abstract

Public-Private Partnership (PPP) has been promoted as an alternative procurement method to provide public services. In recent years, several studies have been carried out in order to identify and assess the critical success factors (CSFs) of PPP projects. However, the interrelation between success criteria (SC) and CSFs in PPP projects has not received attention from researchers. To fill this gap, this paper intended to evaluate the effects of CSFs on the success of PPP projects using PLS-SEM. To this end, SC were monitored throughout construction, operation, and final transfer stages, whereas CSFs were taken into account during the procurement stage of the PPP project. Then, based on an opinion survey in Iran, the effects of CSFs on the success of PPP projects were evaluated based on the developed PLS-SEM model. Moreover, in order to validate the proposed model, two national highway projects in Iran were studied in detail. The results confirmed the effect of CSF on project success and showed that private sector capability has a direct effect on project success during the construction period and government capability is very effective during the project operation stage. In addition, investigating the case studies with respect to the introduced model indicated that a transparent bidding process, risk allocation, and good partnering are among the CSFs in PPP projects in developing countries.

Suggested Citation

  • Ahmadabadi, Ali Akbari & Heravi, Gholamreza, 2019. "The effect of critical success factors on project success in Public-Private Partnership projects: A case study of highway projects in Iran," Transport Policy, Elsevier, vol. 73(C), pages 152-161.
  • Handle: RePEc:eee:trapol:v:73:y:2019:i:c:p:152-161
    DOI: 10.1016/j.tranpol.2018.07.004
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0967070X17304687
    Download Restriction: Full text for ScienceDirect subscribers only

    File URL: https://libkey.io/10.1016/j.tranpol.2018.07.004?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Willoughby, Christopher, 2013. "How much can public private partnership really do for urban transport in developing countries?," Research in Transportation Economics, Elsevier, vol. 40(1), pages 34-55.
    2. Bing Li & A. Akintoye & P. J. Edwards & C. Hardcastle, 2005. "Critical success factors for PPP/PFI projects in the UK construction industry," Construction Management and Economics, Taylor & Francis Journals, vol. 23(5), pages 459-471.
    3. José Luis Guasch & Daniel Benitez & Irene Portabales & Lincoln Flor, 2014. "The Renegotiation of PPP Contracts: An Overview of its Recent Evolution in Latin America," International Transport Forum Discussion Papers 2014/18, OECD Publishing.
    4. Meunier, David & Quinet, Emile, 2010. "Tips and Pitfalls in PPP design," Research in Transportation Economics, Elsevier, vol. 30(1), pages 126-138.
    5. Gordon, Cameron & Mulley, Corinne & Stevens, Nick & Daniels, Rhonda, 2013. "Public–private contracting and incentives for public transport: Can anything be learned from the Sydney Metro experience?," Transport Policy, Elsevier, vol. 27(C), pages 73-84.
    6. Chen, Zhenhua & Daito, Nobuhiko & Gifford, Jonathan L., 2017. "Socioeconomic impacts of transportation public-private partnerships: A dynamic CGE assessment," Transport Policy, Elsevier, vol. 58(C), pages 80-87.
    7. Alain Fayard & Francesco Gaeta & Emile Quinet, 2005. "French motorways: experience and assessment," Post-Print halshs-00754050, HAL.
    8. Emile Quinet & David Meunier, 2010. "Tips and Pitfalls in PPP design," PSE-Ecole d'économie de Paris (Postprint) halshs-00754415, HAL.
    9. Jingfeng Yuan & Alex Yajun Zeng & Miroslaw Skibniewski & Qiming Li, 2009. "Selection of performance objectives and key performance indicators in public-private partnership projects to achieve value for money," Construction Management and Economics, Taylor & Francis Journals, vol. 27(3), pages 253-270.
    10. Akintola Akintoye & Cliff Hardcastle & Matthias Beck & Ezekiel Chinyio & Darinka Asenova, 2003. "Achieving best value in private finance initiative project procurement," Construction Management and Economics, Taylor & Francis Journals, vol. 21(5), pages 461-470.
    11. Fayard, Alain & Gaeta, Francesco & Quinet, Emile, 2005. "French motorways: experience and assessment," Research in Transportation Economics, Elsevier, vol. 15(1), pages 93-105, January.
    12. Emile Quinet & David Meunier, 2010. "Tips and Pitfalls in PPP design," Post-Print halshs-00754415, HAL.
    13. Galilea, Patricia & Medda, Francesca, 2010. "Does the political and economic context influence the success of a transport project? An analysis of transport public-private partnerships," Research in Transportation Economics, Elsevier, vol. 30(1), pages 102-109.
    14. Carpintero, Samuel & Siemiatycki, Matti, 2016. "The politics of delivering light rail transit projects through public-private partnerships in Spain: A case study approach," Transport Policy, Elsevier, vol. 49(C), pages 159-167.
    15. Marques, Rui Cunha & Berg, Sanford V, 2010. "Revisiting the strengths and limitations of regulatory contracts in infrastructure industries," MPRA Paper 32890, University Library of Munich, Germany.
    16. John Hulland, 1999. "Use of partial least squares (PLS) in strategic management research: a review of four recent studies," Strategic Management Journal, Wiley Blackwell, vol. 20(2), pages 195-204, February.
    17. Dowling, Robyn & Kent, Jennifer, 2015. "Practice and public–private partnerships in sustainable transport governance: The case of car sharing in Sydney, Australia," Transport Policy, Elsevier, vol. 40(C), pages 58-64.
    18. Champika Liyanage & Felix Villalba-Romero, 2015. "Measuring Success of PPP Transport Projects: A Cross-Case Analysis of Toll Roads," Transport Reviews, Taylor & Francis Journals, vol. 35(2), pages 140-161, March.
    19. Müller, Ralf & Turner, Rodney, 2007. "The Influence of Project Managers on Project Success Criteria and Project Success by Type of Project," European Management Journal, Elsevier, vol. 25(4), pages 298-309, August.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Hussain, Shahid & Xuetong, Wang & Maqbool, Rashid & Hussain, Mustansar & Shahnawaz, Muhammad, 2022. "The influence of government support, organizational innovativeness and community participation in renewable energy project success: A case of Pakistan," Energy, Elsevier, vol. 239(PC).
    2. Wang, Wei (Walker) & Jin, Xi & Tan, Zhijia & Sun, Huijun & Wu, Jianjun, 2022. "Modeling the effects of government subsidy and regulation on BOT transport project contract design within contractible service quality," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 164(C).
    3. Butković Lana Lovrenčić, 2021. "A new framework for ranking Critical Success Factors for International Construction Projects," Organization, Technology and Management in Construction, Sciendo, vol. 13(2), pages 2505-2520, July.
    4. Umer Zaman & Laura Florez-Perez & Saba Abbasi & Shahid Nawaz & Pablo Farías & Mahir Pradana, 2022. "A Stitch in Time Saves Nine: Nexus between Critical Delay Factors, Leadership Self-Efficacy, and Transnational Mega Construction Project Success," Sustainability, MDPI, vol. 14(4), pages 1-19, February.
    5. Soo-Yong Kim & Le Dinh Thuc, 2020. "Sustainable Location Selection for Investing in Public–Private Partnership Infrastructure Projects: From a Developing Country’s Perspective," Sustainability, MDPI, vol. 12(15), pages 1-19, July.
    6. Binchao Deng & Dongjie Zhou & Jiachen Zhao & Yilin Yin & Xiaoyu Li, 2021. "Fuzzy Synthetic Evaluation of the Critical Success Factors for the Sustainability of Public Private Partnership Projects in China," Sustainability, MDPI, vol. 13(5), pages 1-23, February.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Binchao Deng & Dongjie Zhou & Jiachen Zhao & Yilin Yin & Xiaoyu Li, 2021. "Fuzzy Synthetic Evaluation of the Critical Success Factors for the Sustainability of Public Private Partnership Projects in China," Sustainability, MDPI, vol. 13(5), pages 1-23, February.
    2. Akbari Ahmadabadi, Ali & Heravi, Gholamreza, 2019. "Risk assessment framework of PPP-megaprojects focusing on risk interaction and project success," Transportation Research Part A: Policy and Practice, Elsevier, vol. 124(C), pages 169-188.
    3. Wang, Nannan & Gong, Zheng & Liu, Yunfei & Thomson, Craig, 2020. "The influence of governance on the implementation of Public-Private Partnerships in the United Kingdom and China: A systematic comparison," Utilities Policy, Elsevier, vol. 64(C).
    4. Nannan Wang & Minxun Ma & Yunfei Liu, 2020. "The Whole Lifecycle Management Efficiency of the Public Sector in PPP Infrastructure Projects," Sustainability, MDPI, vol. 12(7), pages 1-17, April.
    5. Páez-Pérez, David & Sánchez-Silva, Mauricio, 2016. "A dynamic principal-agent framework for modeling the performance of infrastructure," European Journal of Operational Research, Elsevier, vol. 254(2), pages 576-594.
    6. Garrido, Laura & Gomez, Juan & Baeza, María de los Ángeles & Vassallo, José Manuel, 2017. "Is EU financial support enhancing the economic performance of PPP projects? An empirical analysis on the case of spanish road infrastructure," Transport Policy, Elsevier, vol. 56(C), pages 19-28.
    7. Juli�n Sierra Tamayo & Jose Manuel Vassallo & María de los Ángeles Baeza, 2014. "Unbundling tolls from contracts: a new road PPP model," Public Money & Management, Taylor & Francis Journals, vol. 34(6), pages 447-451, November.
    8. Zhao, Jianfeng & Greenwood, David & Thurairajah, Niraj & Liu, Henry J. & Haigh, Richard, 2022. "Value for money in transport infrastructure investment: An enhanced model for better procurement decisions," Transport Policy, Elsevier, vol. 118(C), pages 68-78.
    9. Qiang Wang & Thomas Dogot & Yueling Yang & Jian Jiao & Boyang Shi & Changbin Yin, 2020. "From “Coal to Gas” to “Coal to Biomass”: The Strategic Choice of Social Capital in China," Energies, MDPI, vol. 13(16), pages 1-22, August.
    10. Mohammed Fadhil Dulaimi & Mohamed Alhashemi & Florence Yean Yng Ling & Mohan Kumaraswamy, 2010. "The execution of public-private partnership projects in the UAE," Construction Management and Economics, Taylor & Francis Journals, vol. 28(4), pages 393-402.
    11. Guangbin Wang & Yingxia Xue & Mirosław Jan Skibniewski & Jiule Song & Hao Lu, 2018. "Analysis of Private Investors Conduct Strategies by Governments Supervising Public-Private Partnership Projects in the New Media Era," Sustainability, MDPI, vol. 10(12), pages 1-26, December.
    12. Jingfeng Yuan & Wenying Ji & Jiyue Guo & Mirosław J. Skibniewski, 2019. "Simulation-based dynamic adjustments of prices and subsidies for transportation PPP projects based on stakeholders’ satisfaction," Transportation, Springer, vol. 46(6), pages 2309-2345, December.
    13. Musa M. Mukhtar & Roslan Bin Amirudin & Trevor Sofield & Ismail Bin Mohamad, 2017. "Critical success factors for public housing projects in developing countries: a case study of Nigeria," Environment, Development and Sustainability: A Multidisciplinary Approach to the Theory and Practice of Sustainable Development, Springer, vol. 19(5), pages 2039-2067, October.
    14. Xiaodan Zheng & Jingfeng Yuan & Jiyue Guo & Mirosław J. Skibniewski & Sujun Zhao, 2018. "Influence of Relational Norms on User Interests in PPP Projects: Mediating Effect of Project Performance," Sustainability, MDPI, vol. 10(6), pages 1-19, June.
    15. Abraham Park & Chen Yu Chang, 2013. "Impacts of Construction Events on the Project Equity Value of the Channel Tunnel Project," ERES eres2013_97, European Real Estate Society (ERES).
    16. Jin, Ruoyu & Chen, Qian & Soboyejo, Alfred, 2015. "Survey of the current status of sustainable concrete production in the U.S," Resources, Conservation & Recycling, Elsevier, vol. 105(PA), pages 148-159.
    17. Soo-Yong Kim & Le Dinh Thuc, 2020. "Sustainable Location Selection for Investing in Public–Private Partnership Infrastructure Projects: From a Developing Country’s Perspective," Sustainability, MDPI, vol. 12(15), pages 1-19, July.
    18. Yanchun Zhang & Jianglin Gu & Ming Shan & Yazhi Xiao & Amos Darko, 2018. "Investigating Private Sectors’ Behavioral Intention to Participate in PPP Projects: An Empirical Examination Based on the Theory of Planned Behavior," Sustainability, MDPI, vol. 10(8), pages 1-25, August.
    19. Veiko LEMBER & Ole Helby PETERSEN & Walter SCHERRER & Robert ÅGREN, 2019. "Understanding The Relationship Between Infrastructure Public‒Private Partnerships And Innovation," Annals of Public and Cooperative Economics, Wiley Blackwell, vol. 90(2), pages 371-391, June.
    20. Bernadine J. Dykes & Charles E. Stevens & Nandini Lahiri, 2020. "Foreignness in public–private partnerships: The case of project finance investments," Journal of International Business Policy, Palgrave Macmillan, vol. 3(2), pages 183-197, June.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:trapol:v:73:y:2019:i:c:p:152-161. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/wps/find/journaldescription.cws_home/30473/description#description .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.