IDEAS home Printed from https://ideas.repec.org/a/eee/reensy/v94y2009i1p111-124.html
   My bibliography  Save this article

Methodology of using delay-time analysis for a manufacturing industry

Author

Listed:
  • Jones, B.
  • Jenkinson, I.
  • Wang, J.

Abstract

This paper has been written to give a methodology of applying delay-time analysis to a maintenance and inspection department. The aim is to reduce downtime of plant items and/or reducing maintenance and inspection costs, taking into account the possible environmental impact of a failure in terms of cost, both to the company and the environment. The paper also attempts to give a subjective measure of the consequences of such a failure in terms of cost to the environment, in monetary value to the company and the damaging effect to the company image.

Suggested Citation

  • Jones, B. & Jenkinson, I. & Wang, J., 2009. "Methodology of using delay-time analysis for a manufacturing industry," Reliability Engineering and System Safety, Elsevier, vol. 94(1), pages 111-124.
  • Handle: RePEc:eee:reensy:v:94:y:2009:i:1:p:111-124
    DOI: 10.1016/j.ress.2007.12.005
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0951832007002694
    Download Restriction: Full text for ScienceDirect subscribers only

    File URL: https://libkey.io/10.1016/j.ress.2007.12.005?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Christer, A. H. & Lee, C. & Wang, W., 2000. "A data deficiency based parameter estimating problem and case study in delay time PM modeling," International Journal of Production Economics, Elsevier, vol. 67(1), pages 63-76, August.
    2. Zhao, Jianmin & Chan, A.H.C. & Roberts, C. & Madelin, K.B., 2007. "Reliability evaluation and optimisation of imperfect inspections for a component with multi-defects," Reliability Engineering and System Safety, Elsevier, vol. 92(1), pages 65-73.
    3. Kallen, M.J. & van Noortwijk, J.M., 2005. "Optimal maintenance decisions under imperfect inspection," Reliability Engineering and System Safety, Elsevier, vol. 90(2), pages 177-185.
    4. Podofillini, Luca & Zio, Enrico & Vatn, Jørn, 2006. "Risk-informed optimisation of railway tracks inspection and maintenance procedures," Reliability Engineering and System Safety, Elsevier, vol. 91(1), pages 20-35.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Fu, Bo & Wang, Wenbin & Shi, Xin, 2012. "A risk analysis based on a two-stage delayed diagnosis regression model with application to chronic disease progression," European Journal of Operational Research, Elsevier, vol. 218(3), pages 847-855.
    2. Wang, Wenbin, 2012. "A stochastic model for joint spare parts inventory and planned maintenance optimisation," European Journal of Operational Research, Elsevier, vol. 216(1), pages 127-139.
    3. Wang, Wenbin, 2011. "A joint spare part and maintenance inspection optimisation model using the Delay-Time concept," Reliability Engineering and System Safety, Elsevier, vol. 96(11), pages 1535-1541.
    4. van Oosterom, C.D. & Elwany, A.H. & Çelebi, D. & van Houtum, G.J., 2014. "Optimal policies for a delay time model with postponed replacement," European Journal of Operational Research, Elsevier, vol. 232(1), pages 186-197.
    5. Wang, Wenbin & Syntetos, Aris A., 2011. "Spare parts demand: Linking forecasting to equipment maintenance," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 47(6), pages 1194-1209.
    6. Jones, B. & Jenkinson, I. & Yang, Z. & Wang, J., 2010. "The use of Bayesian network modelling for maintenance planning in a manufacturing industry," Reliability Engineering and System Safety, Elsevier, vol. 95(3), pages 267-277.
    7. Wang, Wenbin, 2011. "An inspection model based on a three-stage failure process," Reliability Engineering and System Safety, Elsevier, vol. 96(7), pages 838-848.
    8. Wang, Wenbin & Banjevic, Dragan & Pecht, Michael, 2010. "A multi-component and multi-failure mode inspection model based on the delay time concept," Reliability Engineering and System Safety, Elsevier, vol. 95(8), pages 912-920.
    9. Wang, Wenbin, 2012. "An overview of the recent advances in delay-time-based maintenance modelling," Reliability Engineering and System Safety, Elsevier, vol. 106(C), pages 165-178.
    10. Wang, Wenbin, 2013. "Models of inspection, routine service, and replacement for a serviceable one-component system," Reliability Engineering and System Safety, Elsevier, vol. 116(C), pages 57-63.
    11. Wang, Wenbin & Banjevic, Dragan, 2012. "Ergodicity of forward times of the renewal process in a block-based inspection model using the delay time concept," Reliability Engineering and System Safety, Elsevier, vol. 100(C), pages 1-7.
    12. Simeu-Abazi, Zineb & Di Mascolo, Maria & Knotek, Michal, 2010. "Fault diagnosis for discrete event systems: Modelling and verification," Reliability Engineering and System Safety, Elsevier, vol. 95(4), pages 369-378.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Wang, Wenbin, 2012. "An overview of the recent advances in delay-time-based maintenance modelling," Reliability Engineering and System Safety, Elsevier, vol. 106(C), pages 165-178.
    2. Ye, Zhenggeng & Cai, Zhiqiang & Zhou, Fuli & Zhao, Jiangbin & Zhang, Pan, 2019. "Reliability analysis for series manufacturing system with imperfect inspection considering the interaction between quality and degradation," Reliability Engineering and System Safety, Elsevier, vol. 189(C), pages 345-356.
    3. Macchi, Marco & Garetti, Marco & Centrone, Domenico & Fumagalli, Luca & Piero Pavirani, Gian, 2012. "Maintenance management of railway infrastructures based on reliability analysis," Reliability Engineering and System Safety, Elsevier, vol. 104(C), pages 71-83.
    4. Yang, Li & Ma, Xiaobing & Peng, Rui & Zhai, Qingqing & Zhao, Yu, 2017. "A preventive maintenance policy based on dependent two-stage deterioration and external shocks," Reliability Engineering and System Safety, Elsevier, vol. 160(C), pages 201-211.
    5. van Noortwijk, J.M., 2009. "A survey of the application of gamma processes in maintenance," Reliability Engineering and System Safety, Elsevier, vol. 94(1), pages 2-21.
    6. Liu, Xingheng & Matias, José & Jäschke, Johannes & Vatn, Jørn, 2022. "Gibbs sampler for noisy Transformed Gamma process: Inference and remaining useful life estimation," Reliability Engineering and System Safety, Elsevier, vol. 217(C).
    7. Bragatto, Paolo A. & Pittiglio, Paolo & Ansaldi, Silvia, 2009. "The management of mechanical integrity inspections at small-sized “Seveso†facilities," Reliability Engineering and System Safety, Elsevier, vol. 94(2), pages 412-417.
    8. M D Pandey & T Cheng & J A M van der Weide, 2011. "Finite-time maintenance cost analysis of engineering systems affected by stochastic degradation," Journal of Risk and Reliability, , vol. 225(2), pages 241-250, June.
    9. Wang, Changxi & Elsayed, Elsayed A., 2020. "Stochastic modeling of corrosion growth," Reliability Engineering and System Safety, Elsevier, vol. 204(C).
    10. E Zio & M Librizzi & G Sansavini, 2008. "A combined Monte Carlo and cellular automata approach to the unreliability analysis of binary network systems," Journal of Risk and Reliability, , vol. 222(1), pages 31-38, March.
    11. de Jonge, Bram & Teunter, Ruud & Tinga, Tiedo, 2017. "The influence of practical factors on the benefits of condition-based maintenance over time-based maintenance," Reliability Engineering and System Safety, Elsevier, vol. 158(C), pages 21-30.
    12. Odolinski, Kristofer, 2019. "The impact of cumulative tonnes on track failures: An empirical approach," Papers 2019:1, Research Programme in Transport Economics.
    13. Faisal I. Khan & Mahmoud M. Haddara & Subrata K. Bhattacharya, 2006. "Risk‐Based Integrity and Inspection Modeling (RBIIM) of Process Components/System," Risk Analysis, John Wiley & Sons, vol. 26(1), pages 203-221, February.
    14. Hong, H.P. & Zhou, W. & Zhang, S. & Ye, W., 2014. "Optimal condition-based maintenance decisions for systems with dependent stochastic degradation of components," Reliability Engineering and System Safety, Elsevier, vol. 121(C), pages 276-288.
    15. Hao, Songhua & Yang, Jun & Berenguer, Christophe, 2019. "Degradation analysis based on an extended inverse Gaussian process model with skew-normal random effects and measurement errors," Reliability Engineering and System Safety, Elsevier, vol. 189(C), pages 261-270.
    16. Ferreira, Rodrigo J.P. & de Almeida, Adiel Teixeira & Cavalcante, Cristiano A.V., 2009. "A multi-criteria decision model to determine inspection intervals of condition monitoring based on delay time analysis," Reliability Engineering and System Safety, Elsevier, vol. 94(5), pages 905-912.
    17. Guo, Chiming & Wang, Wenbin & Guo, Bo & Si, Xiaosheng, 2013. "A maintenance optimization model for mission-oriented systems based on Wiener degradation," Reliability Engineering and System Safety, Elsevier, vol. 111(C), pages 183-194.
    18. Wang, Wenbin & Zhao, Fei & Peng, Rui, 2014. "A preventive maintenance model with a two-level inspection policy based on a three-stage failure process," Reliability Engineering and System Safety, Elsevier, vol. 121(C), pages 207-220.
    19. Dongliang Lu & Mahesh D Pandey & Wei-Chau Xie, 2013. "An efficient method for the estimation of parameters of stochastic gamma process from noisy degradation measurements," Journal of Risk and Reliability, , vol. 227(4), pages 425-433, August.
    20. Saleh, Ali & Remenyte-Prescott, Rasa & Prescott, Darren & Chiachío, Manuel, 2024. "Intelligent and adaptive asset management model for railway sections using the iPN method," Reliability Engineering and System Safety, Elsevier, vol. 241(C).

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:reensy:v:94:y:2009:i:1:p:111-124. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: https://www.journals.elsevier.com/reliability-engineering-and-system-safety .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.