IDEAS home Printed from https://ideas.repec.org/a/eee/reensy/v104y2012icp71-83.html
   My bibliography  Save this article

Maintenance management of railway infrastructures based on reliability analysis

Author

Listed:
  • Macchi, Marco
  • Garetti, Marco
  • Centrone, Domenico
  • Fumagalli, Luca
  • Piero Pavirani, Gian

Abstract

Railway infrastructure maintenance plays a crucial role for rail transport. It aims at guaranteeing safety of operations and availability of railway tracks and related equipment for traffic regulation. Moreover, it is one major cost for rail transport operations. Thus, the increased competition in traffic market is asking for maintenance improvement, aiming at the reduction of maintenance expenditures while keeping the safety of operations. This issue is addressed by the methodology presented in the paper. The first step of the methodology consists of a family-based approach for the equipment reliability analysis; its purpose is the identification of families of railway items which can be given the same reliability targets. The second step builds the reliability model of the railway system for identifying the most critical items, given a required service level for the transportation system. The two methods have been implemented and tested in practical case studies, in the context of Rete Ferroviaria Italiana, the Italian public limited company for railway transportation.

Suggested Citation

  • Macchi, Marco & Garetti, Marco & Centrone, Domenico & Fumagalli, Luca & Piero Pavirani, Gian, 2012. "Maintenance management of railway infrastructures based on reliability analysis," Reliability Engineering and System Safety, Elsevier, vol. 104(C), pages 71-83.
  • Handle: RePEc:eee:reensy:v:104:y:2012:i:c:p:71-83
    DOI: 10.1016/j.ress.2012.03.017
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0951832012000518
    Download Restriction: Full text for ScienceDirect subscribers only

    File URL: https://libkey.io/10.1016/j.ress.2012.03.017?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Podofillini, Luca & Zio, Enrico & Vatn, Jørn, 2006. "Risk-informed optimisation of railway tracks inspection and maintenance procedures," Reliability Engineering and System Safety, Elsevier, vol. 91(1), pages 20-35.
    2. Lisnianski, Anatoly, 2007. "Extended block diagram method for a multi-state system reliability assessment," Reliability Engineering and System Safety, Elsevier, vol. 92(12), pages 1601-1607.
    3. Levitin, Gregory, 2007. "Block diagram method for analyzing multi-state systems with uncovered failures," Reliability Engineering and System Safety, Elsevier, vol. 92(6), pages 727-734.
    4. Vatn, Jørn & Aven, Terje, 2010. "An approach to maintenance optimization where safety issues are important," Reliability Engineering and System Safety, Elsevier, vol. 95(1), pages 58-63.
    5. Zio, Enrico & Marella, Marco & Podofillini, Luca, 2007. "Importance measures-based prioritization for improving the performance of multi-state systems: application to the railway industry," Reliability Engineering and System Safety, Elsevier, vol. 92(10), pages 1303-1314.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Chao Fang & Piao Dong & Yi-Ping Fang & Enrico Zio, 2020. "Vulnerability analysis of critical infrastructure under disruptions: An application to China Railway High-speed," Journal of Risk and Reliability, , vol. 234(2), pages 235-245, April.
    2. Suyog S. Patil & Anand K. Bewoor & Ravinder Kumar & Mohammad Hossein Ahmadi & Mohsen Sharifpur & Seepana PraveenKumar, 2022. "Development of Optimized Maintenance Program for a Steam Boiler System Using Reliability-Centered Maintenance Approach," Sustainability, MDPI, vol. 14(16), pages 1-20, August.
    3. Alebrant Mendes, Angélica & Duarte Ribeiro, José Luis, 2014. "Establishment of a maintenance plan based on quantitative analysis in the context of RCM in a JIT production scenario," Reliability Engineering and System Safety, Elsevier, vol. 127(C), pages 21-29.
    4. Zai-Wei Li & Xiao-Zhou Liu & Si-Xin Chen, 2022. "A reliability assessment approach for slab track structure based on vehicle-track dynamics and surrogate model," Journal of Risk and Reliability, , vol. 236(1), pages 79-89, February.
    5. Cats, Oded & Koppenol, Gert-Jaap & Warnier, Martijn, 2017. "Robustness assessment of link capacity reduction for complex networks: Application for public transport systems," Reliability Engineering and System Safety, Elsevier, vol. 167(C), pages 544-553.
    6. Hong, Liu & Ouyang, Min & Peeta, Srinivas & He, Xiaozheng & Yan, Yongze, 2015. "Vulnerability assessment and mitigation for the Chinese railway system under floods," Reliability Engineering and System Safety, Elsevier, vol. 137(C), pages 58-68.
    7. Cancela, Héctor & Guerberoff, Gustavo & Robledo, Franco & Romero, Pablo, 2021. "Analysis and reliability of separable systems," Operations Research Perspectives, Elsevier, vol. 8(C).
    8. Yu, Huan & Yang, Jun & Peng, Rui & Zhao, Yu, 2016. "Reliability evaluation of linear multi-state consecutively-connected systems constrained by m consecutive and n total gaps," Reliability Engineering and System Safety, Elsevier, vol. 150(C), pages 35-43.
    9. Li, Zai-Wei & Zhou, Yun-Lai & Liu, Xiao-Zhou & Abdel Wahab, Magd, 2023. "Service reliability assessment of ballastless track in high speed railway via improved response surface method," Reliability Engineering and System Safety, Elsevier, vol. 234(C).
    10. Jiang, Xiuhong & Duan, Fuhai & Tian, Heng & Wei, Xuedong, 2015. "Optimization of reliability centered predictive maintenance scheme for inertial navigation system," Reliability Engineering and System Safety, Elsevier, vol. 140(C), pages 208-217.
    11. Rhayma, N. & Bressolette, Ph. & Breul, P. & Fogli, M. & Saussine, G., 2013. "Reliability analysis of maintenance operations for railway tracks," Reliability Engineering and System Safety, Elsevier, vol. 114(C), pages 12-25.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Adrian Gill & Piotr Smoczyński, 2021. "Optimization of Safety System Structures in Railway Transport," Sustainability, MDPI, vol. 13(19), pages 1-15, September.
    2. Macchi, Marco & Kristjanpoller, Fredy & Garetti, Marco & Arata, Adolfo & Fumagalli, Luca, 2012. "Introducing buffer inventories in the RBD analysis of process production systems," Reliability Engineering and System Safety, Elsevier, vol. 104(C), pages 84-95.
    3. Hui Shang & Christophe Bérenguer & John Andrews, 2017. "Delayed maintenance modelling considering speed restriction for a railway section," Journal of Risk and Reliability, , vol. 231(4), pages 411-428, August.
    4. Rhayma, N. & Bressolette, Ph. & Breul, P. & Fogli, M. & Saussine, G., 2013. "Reliability analysis of maintenance operations for railway tracks," Reliability Engineering and System Safety, Elsevier, vol. 114(C), pages 12-25.
    5. Yang, Li & Ma, Xiaobing & Peng, Rui & Zhai, Qingqing & Zhao, Yu, 2017. "A preventive maintenance policy based on dependent two-stage deterioration and external shocks," Reliability Engineering and System Safety, Elsevier, vol. 160(C), pages 201-211.
    6. Baroud, Hiba & Barker, Kash & Ramirez-Marquez, Jose E. & Rocco S., Claudio M., 2014. "Importance measures for inland waterway network resilience," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 62(C), pages 55-67.
    7. Yu, Shui & Wang, Zhonglai & Zhang, Kewang, 2018. "Sequential time-dependent reliability analysis for the lower extremity exoskeleton under uncertainty," Reliability Engineering and System Safety, Elsevier, vol. 170(C), pages 45-52.
    8. Kim, Jaehoon & Jeong, Hyun- Yong, 2013. "Evaluation of the adequacy of maintenance tasks using the failure consequences of railroad vehicles," Reliability Engineering and System Safety, Elsevier, vol. 117(C), pages 30-39.
    9. Son, Kwang Seop & Seong, Seung Hwan & Kang, Hyun Gook & Jang, Gwi Sook, 2020. "Development of state-based integrated dependability model of RPS in NPPs considering CCF and periodic testing effects at the early design phase," Reliability Engineering and System Safety, Elsevier, vol. 193(C).
    10. Levitin, Gregory & Xing, Liudong & Ben-Haim, Hanoch & Dai, Yuanshun, 2011. "Multi-state systems with selective propagated failures and imperfect individual and group protections," Reliability Engineering and System Safety, Elsevier, vol. 96(12), pages 1657-1666.
    11. Huseby, Arne B. & Natvig, Bent, 2013. "Discrete event simulation methods applied to advanced importance measures of repairable components in multistate network flow systems," Reliability Engineering and System Safety, Elsevier, vol. 119(C), pages 186-198.
    12. Sheu, Shey-Huei & Chang, Chin-Chih & Chen, Yen-Luan & George Zhang, Zhe, 2015. "Optimal preventive maintenance and repair policies for multi-state systems," Reliability Engineering and System Safety, Elsevier, vol. 140(C), pages 78-87.
    13. Simeu-Abazi, Zineb & Ahmad, Alali Alhouaij, 2011. "Optimisation of distributed maintenance: Modelling and application to the multi-factory production," Reliability Engineering and System Safety, Elsevier, vol. 96(11), pages 1564-1575.
    14. Flage, Roger, 2014. "A delay time model with imperfect and failure-inducing inspections," Reliability Engineering and System Safety, Elsevier, vol. 124(C), pages 1-12.
    15. M. López-Campos & F. Kristjanpoller & P. Viveros & R. Pascual, 2018. "Reliability Assessment Methodology for Massive Manufacturing Using Multi-Function Equipment," Complexity, Hindawi, vol. 2018, pages 1-8, February.
    16. E Zio & M Librizzi & G Sansavini, 2008. "A combined Monte Carlo and cellular automata approach to the unreliability analysis of binary network systems," Journal of Risk and Reliability, , vol. 222(1), pages 31-38, March.
    17. Odolinski, Kristofer, 2019. "The impact of cumulative tonnes on track failures: An empirical approach," Papers 2019:1, Research Programme in Transport Economics.
    18. Dong, Wenjie & Liu, Sifeng & Tao, Liangyan & Cao, Yingsai & Fang, Zhigeng, 2019. "Reliability variation of multi-state components with inertial effect of deteriorating output performances," Reliability Engineering and System Safety, Elsevier, vol. 186(C), pages 176-185.
    19. Liu, Baoliang & Cui, Lirong & Wen, Yanqing & Shen, Jingyuan, 2013. "A performance measure for Markov system with stochastic supply patterns and stochastic demand patterns," Reliability Engineering and System Safety, Elsevier, vol. 119(C), pages 294-299.
    20. Lisnianski, Anatoly & Ding, Yi, 2009. "Redundancy analysis for repairable multi-state system by using combined stochastic processes methods and universal generating function technique," Reliability Engineering and System Safety, Elsevier, vol. 94(11), pages 1788-1795.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:reensy:v:104:y:2012:i:c:p:71-83. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: https://www.journals.elsevier.com/reliability-engineering-and-system-safety .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.