IDEAS home Printed from https://ideas.repec.org/a/eee/proeco/v96y2005i2p249-261.html
   My bibliography  Save this article

On the design of variable sample size and sampling intervals charts under non-normality

Author

Listed:
  • Lin, Yu-Chang
  • Chou, Chao-Yu

Abstract

No abstract is available for this item.

Suggested Citation

  • Lin, Yu-Chang & Chou, Chao-Yu, 2005. "On the design of variable sample size and sampling intervals charts under non-normality," International Journal of Production Economics, Elsevier, vol. 96(2), pages 249-261, May.
  • Handle: RePEc:eee:proeco:v:96:y:2005:i:2:p:249-261
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0925-5273(04)00154-9
    Download Restriction: Full text for ScienceDirect subscribers only
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Fu, James C. & Spiring, Fred A. & Xie, Hansheng, 2002. "On the average run lengths of quality control schemes using a Markov chain approach," Statistics & Probability Letters, Elsevier, vol. 56(4), pages 369-380, February.
    2. De Magalhaes, Maysa S. & Epprecht, Eugenio K. & Costa, Antonio F. B., 2001. "Economic design of a Vp chart," International Journal of Production Economics, Elsevier, vol. 74(1-3), pages 191-200, December.
    3. Bai, D. S. & Lee, K. T., 2002. "Variable sampling interval control charts with an improved switching rule," International Journal of Production Economics, Elsevier, vol. 76(2), pages 189-199, March.
    4. Bai, D. S. & Lee, K. T., 1998. "An economic design of variable sampling interval control charts," International Journal of Production Economics, Elsevier, vol. 54(1), pages 57-64, January.
    5. Prabhu, Sharad S. & Montgomery, Douglas C. & Runger, George C., 1997. "Economic-statistical design of an adaptive chart," International Journal of Production Economics, Elsevier, vol. 49(1), pages 1-15, March.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. De Magalhães, M.S. & Costa, A.F.B. & Moura Neto, F.D., 2009. "A hierarchy of adaptive control charts," International Journal of Production Economics, Elsevier, vol. 119(2), pages 271-283, June.
    2. Lim, S.L. & Khoo, Michael B.C. & Teoh, W.L. & Xie, M., 2015. "Optimal designs of the variable sample size and sampling interval X¯ chart when process parameters are estimated," International Journal of Production Economics, Elsevier, vol. 166(C), pages 20-35.
    3. Liu, J.Y. & Xie, M. & Goh, T.N. & Liu, Q.H. & Yang, Z.H., 2006. "Cumulative count of conforming chart with variable sampling intervals," International Journal of Production Economics, Elsevier, vol. 101(2), pages 286-297, June.
    4. Mohammad A. M. Abdel-Aal & Shokri Z. Selim, 2019. "A Generalized Process Targeting Model and an Application Involving a Production Process with Multiple Products," Mathematics, MDPI, vol. 7(8), pages 1-17, August.
    5. Yang, Yit-Ming & Su, Chia-Yi & Pearn, W.L., 2010. "Economic design of x¯-control charts for continuous flow process with multiple assignable causes," International Journal of Production Economics, Elsevier, vol. 128(1), pages 110-117, November.
    6. Chao-Yu Chou & Chung-Ho Chen & Hui-Rong Liu, 2006. "Economic Design of EWMA Charts with Variable Sampling Intervals," Quality & Quantity: International Journal of Methodology, Springer, vol. 40(6), pages 879-896, December.
    7. Zhou, Wenhui & Lian, Zhaotong, 2011. "Optimum design of a new VSS-NP chart with adjusting sampling inspection," International Journal of Production Economics, Elsevier, vol. 129(1), pages 8-13, January.
    8. Majid Ahmadabadi & Yaghub Farjami & Mohammad Bameni Moghadam, 2012. "A process control method based on five-parameter generalized lambda distribution," Quality & Quantity: International Journal of Methodology, Springer, vol. 46(4), pages 1097-1111, June.
    9. Chen, Yan-Kwang & Hsieh, Kun-Lin & Chang, Cheng-Chang, 2007. "Economic design of the VSSI control charts for correlated data," International Journal of Production Economics, Elsevier, vol. 107(2), pages 528-539, June.
    10. Ming-Hung Shu & Dinh-Chien Dang & Thanh-Lam Nguyen & Bi-Min Hsu & Ngoc-Son Phan, 2017. "Fuzzy and Control Charts: A Data-Adaptability and Human-Acceptance Approach," Complexity, Hindawi, vol. 2017, pages 1-17, April.
    11. M. A. Pasha & M. Bameni Moghadam & M. A. Rahim, 2020. "Effects of non-normal quality data on the integrated model of imperfect maintenance, early replacement, and economic design of $${\bar{X}}$$ X ¯ -control charts," Operational Research, Springer, vol. 20(4), pages 2519-2536, December.
    12. Costa, Antonio Fernando Branco & Machado, Marcela Aparecida Guerreiro, 2011. "Variable parameter and double sampling charts in the presence of correlation: The Markov chain approach," International Journal of Production Economics, Elsevier, vol. 130(2), pages 224-229, April.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Celano, Giovanni & De Magalhães, Maysa S. & Costa, Antonio F.B. & Fichera, Sergio, 2011. "A stochastic shift model for economically designed charts constrained by the process stage configuration," International Journal of Production Economics, Elsevier, vol. 132(2), pages 315-325, August.
    2. Chen, Yan-Kwang & Hsieh, Kun-Lin & Chang, Cheng-Chang, 2007. "Economic design of the VSSI control charts for correlated data," International Journal of Production Economics, Elsevier, vol. 107(2), pages 528-539, June.
    3. Tagaras, George, 2017. "New indices for the evaluation of the statistical properties of Bayesian x¯ control charts for short runsAuthor-Name: Nikolaidis, Yiannis," European Journal of Operational Research, Elsevier, vol. 259(1), pages 280-292.
    4. De Magalhaes, Maysa S. & Moura Neto, Francisco D., 2005. "Joint economic model for totally adaptive and R charts," European Journal of Operational Research, Elsevier, vol. 161(1), pages 148-161, February.
    5. Liu, J.Y. & Xie, M. & Goh, T.N. & Liu, Q.H. & Yang, Z.H., 2006. "Cumulative count of conforming chart with variable sampling intervals," International Journal of Production Economics, Elsevier, vol. 101(2), pages 286-297, June.
    6. Nenes, George, 2011. "A new approach for the economic design of fully adaptive control charts," International Journal of Production Economics, Elsevier, vol. 131(2), pages 631-642, June.
    7. Ho, Linda Lee & Trindade, Anderson Laécio Galindo, 2009. "Economic design of an X chart for short-run production," International Journal of Production Economics, Elsevier, vol. 120(2), pages 613-624, August.
    8. Mahadik Shashibhushan B. & Shirke Digambar T., 2007. "Economic Design of A Modified Variable Sample Size and Sampling Interval Chart," Stochastics and Quality Control, De Gruyter, vol. 22(2), pages 273-293, January.
    9. Lee, Pei-Hsi & Torng, Chau-Chen & Liao, Li-Fang, 2012. "An economic design of combined double sampling and variable sampling interval X¯ control chart," International Journal of Production Economics, Elsevier, vol. 138(1), pages 102-106.
    10. M. Abolmohammadi & A. Seif & M. H. Behzadi & M. B. Moghadam, 2021. "Economic statistical design of adaptive $$\bar{X}$$ X ¯ control charts based on quality loss functions," Operational Research, Springer, vol. 21(2), pages 1041-1080, June.
    11. Torng, Chau-Chen & Lee, Pei-Hsi & Liao, Nai-Yi, 2009. "An economic-statistical design of double sampling control chart," International Journal of Production Economics, Elsevier, vol. 120(2), pages 495-500, August.
    12. Naderkhani, Farnoosh & Makis, Viliam, 2016. "Economic design of multivariate Bayesian control chart with two sampling intervals," International Journal of Production Economics, Elsevier, vol. 174(C), pages 29-42.
    13. Markos V. Koutras & Sotirios Bersimis & Demetrios L. Antzoulakos, 2006. "Improving the Performance of the Chi-square Control Chart via Runs Rules," Methodology and Computing in Applied Probability, Springer, vol. 8(3), pages 409-426, September.
    14. Zhang, Cai Wen & Xie, Min & Goh, Thong Ngee, 2008. "Economic design of cumulative count of conforming charts under inspection by samples," International Journal of Production Economics, Elsevier, vol. 111(1), pages 93-104, January.
    15. De Magalhaes, Maysa S. & B. Costa, Antonio F. & Moura Neto, Francisco D., 2006. "Adaptive control charts: A Markovian approach for processes subject to independent disturbances," International Journal of Production Economics, Elsevier, vol. 99(1-2), pages 236-246, February.
    16. Linderman, Kevin & McKone-Sweet, Kathleen E. & Anderson, John C., 2005. "An integrated systems approach to process control and maintenance," European Journal of Operational Research, Elsevier, vol. 164(2), pages 324-340, July.
    17. Lim, S.L. & Khoo, Michael B.C. & Teoh, W.L. & Xie, M., 2015. "Optimal designs of the variable sample size and sampling interval X¯ chart when process parameters are estimated," International Journal of Production Economics, Elsevier, vol. 166(C), pages 20-35.
    18. Chen, Yan-Kwang, 2007. "Adaptive sampling enhancement for Hotelling's T2 charts," European Journal of Operational Research, Elsevier, vol. 178(3), pages 841-857, May.
    19. Xie, M. & Tang, X. Y. & Goh, T. N., 2001. "On economic design of cumulative count of conforming chart," International Journal of Production Economics, Elsevier, vol. 72(1), pages 89-97, June.
    20. Nenes, George & Tagaras, George, 2007. "The economically designed two-sided Bayesian control chart," European Journal of Operational Research, Elsevier, vol. 183(1), pages 263-277, November.

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:proeco:v:96:y:2005:i:2:p:249-261. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/ijpe .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.