IDEAS home Printed from https://ideas.repec.org/a/eee/proeco/v89y2004i1p45-56.html
   My bibliography  Save this article

Quantification of flexibility in advanced manufacturing systems using fuzzy concept

Author

Listed:
  • Beskese, Ahmet
  • Kahraman, Cengiz
  • Irani, Zahir

Abstract

No abstract is available for this item.

Suggested Citation

  • Beskese, Ahmet & Kahraman, Cengiz & Irani, Zahir, 2004. "Quantification of flexibility in advanced manufacturing systems using fuzzy concept," International Journal of Production Economics, Elsevier, vol. 89(1), pages 45-56, May.
  • Handle: RePEc:eee:proeco:v:89:y:2004:i:1:p:45-56
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0925-5273(03)00195-6
    Download Restriction: Full text for ScienceDirect subscribers only
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Chang, Shih-Chia & Yang, Chen-Lung & Cheng, Hsin-Chia & Sheu, Chwen, 2003. "Manufacturing flexibility and business strategy: An empirical study of small and medium sized firms," International Journal of Production Economics, Elsevier, vol. 83(1), pages 13-26, January.
    2. K Iwamura & B Liu, 1998. "Chance constrained integer programming models for capital budgeting in fuzzy environments," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 49(8), pages 854-860, August.
    3. Bengtsson, Jens, 2001. "Manufacturing flexibility and real options: A review," International Journal of Production Economics, Elsevier, vol. 74(1-3), pages 213-224, December.
    4. Bernardo, John J. & Mohamed, Zubair, 1992. "The measurement and use of operational flexibility in the loading of Flexible Manufacturing Systems," European Journal of Operational Research, Elsevier, vol. 60(2), pages 144-155, July.
    5. Kahraman, Cengiz & Tolga, Ethem & Ulukan, Ziya, 2000. "Justification of manufacturing technologies using fuzzy benefit/cost ratio analysis," International Journal of Production Economics, Elsevier, vol. 66(1), pages 45-52, June.
    6. Sajjad Zahir, M., 1991. "Incorporating the uncertainty of decision judgements in the analytic hierarchy process," European Journal of Operational Research, Elsevier, vol. 53(2), pages 206-216, July.
    7. A. H. Boussabaine & Taha Elhag, 1999. "Applying fuzzy techniques to cash flow analysis," Construction Management and Economics, Taylor & Francis Journals, vol. 17(6), pages 745-755.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Seebacher, Gottfried & Winkler, Herwig, 2014. "Evaluating flexibility in discrete manufacturing based on performance and efficiency," International Journal of Production Economics, Elsevier, vol. 153(C), pages 340-351.
    2. Kulak, Osman & Kahraman, Cengiz, 2005. "Multi-attribute comparison of advanced manufacturing systems using fuzzy vs. crisp axiomatic design approach," International Journal of Production Economics, Elsevier, vol. 95(3), pages 415-424, March.
    3. Čičak Josip & Vašiček Davor, 2019. "Determining the Level of Accounting Conservatism through the Fuzzy Logic System," Business Systems Research, Sciendo, vol. 10(1), pages 88-101, April.
    4. Sushil, 2020. "Interpretive multi-criteria ranking of production systems with ordinal weights and transitive dominance relationships," Annals of Operations Research, Springer, vol. 290(1), pages 677-695, July.
    5. Choe, Pilsung & Tew, Jeffrey D. & Tong, Songzhen, 2015. "Effect of cognitive automation in a material handling system on manufacturing flexibility," International Journal of Production Economics, Elsevier, vol. 170(PC), pages 891-899.
    6. Bonfatti, M. & Caridi, M. & Schiavina, L., 2006. "A fuzzy model for load-oriented manufacturing control," International Journal of Production Economics, Elsevier, vol. 104(2), pages 502-513, December.
    7. Lin, Ching-Torng & Chiu, Hero & Tseng, Yi-Hong, 2006. "Agility evaluation using fuzzy logic," International Journal of Production Economics, Elsevier, vol. 101(2), pages 353-368, June.
    8. Azadegan, Arash & Porobic, Lejla & Ghazinoory, Sepehr & Samouei, Parvaneh & Saman Kheirkhah, Amir, 2011. "Fuzzy logic in manufacturing: A review of literature and a specialized application," International Journal of Production Economics, Elsevier, vol. 132(2), pages 258-270, August.
    9. Iraj Noravesh & Mohammad Delasay Sorkhab & Faegh Salehi, 2006. "A Fuzzy Approach for Projects Evaluation and Selection; an Iranian Auto Manufacturer Case Study," Iranian Economic Review (IER), Faculty of Economics,University of Tehran.Tehran,Iran, vol. 11(1), pages 171-185, winter.
    10. Llorens, F. Javier & Molina, Luis M. & Verdu, Antonio J., 2005. "Flexibility of manufacturing systems, strategic change and performance," International Journal of Production Economics, Elsevier, vol. 98(3), pages 273-289, December.
    11. Khalid Aljohani & Russell G. Thompson, 2018. "A Stakeholder-Based Evaluation of the Most Suitable and Sustainable Delivery Fleet for Freight Consolidation Policies in the Inner-City Area," Sustainability, MDPI, vol. 11(1), pages 1-27, December.
    12. Chang, An-Yuan, 2007. "On the measurement of routing flexibility: A multiple attribute approach," International Journal of Production Economics, Elsevier, vol. 109(1-2), pages 122-136, September.
    13. Suman Gothwal & Tilak Raj, 2017. "Analyzing the factors affecting the flexibility in FMS using weighted interpretive structural modeling (WISM) approach," International Journal of System Assurance Engineering and Management, Springer;The Society for Reliability, Engineering Quality and Operations Management (SREQOM),India, and Division of Operation and Maintenance, Lulea University of Technology, Sweden, vol. 8(2), pages 408-422, June.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Llorens, F. Javier & Molina, Luis M. & Verdu, Antonio J., 2005. "Flexibility of manufacturing systems, strategic change and performance," International Journal of Production Economics, Elsevier, vol. 98(3), pages 273-289, December.
    2. Tolga, Ethem & Demircan, Murat Levent & Kahraman, Cengiz, 2005. "Operating system selection using fuzzy replacement analysis and analytic hierarchy process," International Journal of Production Economics, Elsevier, vol. 97(1), pages 89-117, July.
    3. Chang, An-Yuan, 2007. "On the measurement of routing flexibility: A multiple attribute approach," International Journal of Production Economics, Elsevier, vol. 109(1-2), pages 122-136, September.
    4. Álvarez, María José, 1993. "Capital budgeting and flexible manufacturing," DEE - Working Papers. Business Economics. WB 7080, Universidad Carlos III de Madrid. Departamento de Economía de la Empresa.
    5. Santos, Lúcia & Soares, Isabel & Mendes, Carla & Ferreira, Paula, 2014. "Real Options versus Traditional Methods to assess Renewable Energy Projects," Renewable Energy, Elsevier, vol. 68(C), pages 588-594.
    6. Qingbin Cui & Makarand Hastak & Daniel Halpin, 2010. "Systems analysis of project cash flow management strategies," Construction Management and Economics, Taylor & Francis Journals, vol. 28(4), pages 361-376.
    7. Enrico Teich & Thorsten Claus, 2017. "Measurement of Load and Capacity Flexibility in Manufacturing," Global Journal of Flexible Systems Management, Springer;Global Institute of Flexible Systems Management, vol. 18(4), pages 291-302, December.
    8. Levary, Reuven R. & Wan, Ke, 1999. "An analytic hierarchy process based simulation model for entry mode decision regarding foreign direct investment," Omega, Elsevier, vol. 27(6), pages 661-677, December.
    9. Shu-Shun Liu & Chang-Jung Wang, 2009. "Two-stage profit optimization model for linear scheduling problems considering cash flow," Construction Management and Economics, Taylor & Francis Journals, vol. 27(11), pages 1023-1037.
    10. Kumar, Akhilesh & Prakash & Tiwari, M.K. & Shankar, Ravi & Baveja, Alok, 2006. "Solving machine-loading problem of a flexible manufacturing system with constraint-based genetic algorithm," European Journal of Operational Research, Elsevier, vol. 175(2), pages 1043-1069, December.
    11. Metaxas, Theodore & Kallioras, Dimitris, 2013. "Small and medium-sized firms' competitiveness and territorial characteristics/assets: The cases of Bari, Varna and Thessaloniki," MPRA Paper 52446, University Library of Munich, Germany.
    12. He, Yuanqiong & Keung Lai, Kin & Sun, Hongyi & Chen, Yun, 2014. "The impact of supplier integration on customer integration and new product performance: The mediating role of manufacturing flexibility under trust theory," International Journal of Production Economics, Elsevier, vol. 147(PB), pages 260-270.
    13. Rabelo, Luis & Eskandari, Hamidreza & Shaalan, Tarek & Helal, Magdy, 2007. "Value chain analysis using hybrid simulation and AHP," International Journal of Production Economics, Elsevier, vol. 105(2), pages 536-547, February.
    14. Khouloud Dorgham & Issam Nouaouri & Jean-Christophe Nicolas & Gilles Goncalves, 2022. "Collaborative hospital supply chain network design problem under uncertainty," Operational Research, Springer, vol. 22(5), pages 4607-4640, November.
    15. Mohamed, Zubair M. & Kumar, Ashok & Motwani, Jaideep, 1999. "An improved part grouping model for minimizing makespan in FMS," European Journal of Operational Research, Elsevier, vol. 116(1), pages 171-182, July.
    16. Theodore Metaxas, 2012. "Urban Advantages and Disadvantages in Southeastern Europe: An Appreciation of Industrial Firms by Using Exploratory Factor Analysis," European Research Studies Journal, European Research Studies Journal, vol. 0(2), pages 81-104.
    17. Rosenbloom, E. S., 1997. "A probabilistic interpretation of the final rankings in AHP," European Journal of Operational Research, Elsevier, vol. 96(2), pages 371-378, January.
    18. Bengtsson, Jens & Olhager, Jan, 2002. "The impact of the product mix on the value of flexibility," Omega, Elsevier, vol. 30(4), pages 265-273, August.
    19. Dowlatshahi, Shad & Cao, Qing, 2006. "The relationships among virtual enterprise, information technology, and business performance in agile manufacturing: An industry perspective," European Journal of Operational Research, Elsevier, vol. 174(2), pages 835-860, October.
    20. Martinez, Marian Garcia & Poole, Nigel D., 2004. "Analysing Linkages between Strategy, Performance, Management Structure and Culture in the Spanish Fresh Produce Industry," International Food and Agribusiness Management Review, International Food and Agribusiness Management Association, vol. 7(4), pages 1-24.

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:proeco:v:89:y:2004:i:1:p:45-56. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/ijpe .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.