IDEAS home Printed from https://ideas.repec.org/a/eee/proeco/v81-82y2003i1p215-224.html
   My bibliography  Save this article

The consignment stock of inventories: industrial case and performance analysis

Author

Listed:
  • Valentini, Giovanni
  • Zavanella, Lucio

Abstract

No abstract is available for this item.

Suggested Citation

  • Valentini, Giovanni & Zavanella, Lucio, 2003. "The consignment stock of inventories: industrial case and performance analysis," International Journal of Production Economics, Elsevier, vol. 81(1), pages 215-224, January.
  • Handle: RePEc:eee:proeco:v:81-82:y:2003:i:1:p:215-224
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0925-5273(02)00300-6
    Download Restriction: Full text for ScienceDirect subscribers only
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Suresh P. Sethi & Feng Cheng, 1997. "Optimality of ( s , S ) Policies in Inventory Models with Markovian Demand," Operations Research, INFORMS, vol. 45(6), pages 931-939, December.
    2. Lu, Lu, 1995. "A one-vendor multi-buyer integrated inventory model," European Journal of Operational Research, Elsevier, vol. 81(2), pages 312-323, March.
    3. Goyal, Suresh K. & Gupta, Yash P., 1989. "Integrated inventory models: The buyer-vendor coordination," European Journal of Operational Research, Elsevier, vol. 41(3), pages 261-269, August.
    4. Hill, Roger M., 1997. "The single-vendor single-buyer integrated production-inventory model with a generalised policy," European Journal of Operational Research, Elsevier, vol. 97(3), pages 493-499, March.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Hesham K. Alfares & Ahmed M. Attia, 2017. "A supply chain model with vendor-managed inventory, consignment, and quality inspection errors," International Journal of Production Research, Taylor & Francis Journals, vol. 55(19), pages 5706-5727, October.
    2. Emde, Simon & Boysen, Nils, 2012. "Optimally locating in-house logistics areas to facilitate JIT-supply of mixed-model assembly lines," International Journal of Production Economics, Elsevier, vol. 135(1), pages 393-402.
    3. Hariga, Moncer & As’ad, Rami & Khan, Zeinab, 2017. "Manufacturing-remanufacturing policies for a centralized two stage supply chain under consignment stock partnership," International Journal of Production Economics, Elsevier, vol. 183(PB), pages 362-374.
    4. Po-Yu Chen, 2017. "Optimal Retail Price Model for Partial Consignment to Multiple Retailers," Complexity, Hindawi, vol. 2017, pages 1-11, December.
    5. Braglia, Marcello & Castellano, Davide & Frosolini, Marco, 2014. "Safety stock management in single vendor–single buyer problem under VMI with consignment stock agreement," International Journal of Production Economics, Elsevier, vol. 154(C), pages 16-31.
    6. Zavanella, Lucio & Zanoni, Simone, 2009. "A one-vendor multi-buyer integrated production-inventory model: The 'Consignment Stock' case," International Journal of Production Economics, Elsevier, vol. 118(1), pages 225-232, March.
    7. Hsun Chuan Cho & Ying Jiun Hsieh & Lan Ying Huang, 2018. "Capturing the Risk-Pooling Effect through Inventory Planning and Demand Switching," Sustainability, MDPI, vol. 10(11), pages 1-14, November.
    8. Siraj K. Zahran & Mohamad Y. Jaber & Simone Zanoni, 2017. "Comparing different coordination scenarios in a three-level supply chain system," International Journal of Production Research, Taylor & Francis Journals, vol. 55(14), pages 4068-4088, July.
    9. Makoena Sebatjane & Olufemi Adetunji, 2022. "Optimal inventory replenishment and shipment policies in a three-echelon supply chain for growing items with expiration dates," OPSEARCH, Springer;Operational Research Society of India, vol. 59(3), pages 809-838, September.
    10. Wang, Zhiqiang & Wang, Qiang & Lai, Yin & Liang, Chaojie, 2020. "Drivers and outcomes of supply chain finance adoption: An empirical investigation in China," International Journal of Production Economics, Elsevier, vol. 220(C).
    11. Darwish, M.A. & Odah, O.M., 2010. "Vendor managed inventory model for single-vendor multi-retailer supply chains," European Journal of Operational Research, Elsevier, vol. 204(3), pages 473-484, August.
    12. Bazan, Ehab & Jaber, Mohamad Y. & Zanoni, Simone & Zavanella, Lucio E., 2014. "Vendor Managed Inventory (VMI) with Consignment Stock (CS) agreement for a two-level supply chain with an imperfect production process with/without restoration interruptions," International Journal of Production Economics, Elsevier, vol. 157(C), pages 289-301.
    13. Wu, Kan & Yuan, Xue-Ming, 2016. "Optimal production-inventory policy for an integrated multi-stage supply chain with time-varying demandAuthor-Name: Zhao, Shi Tao," European Journal of Operational Research, Elsevier, vol. 255(2), pages 364-379.
    14. Taleizadeh, Ata Allah & Moshtagh, Mohammad Sadegh, 2019. "A consignment stock scheme for closed loop supply chain with imperfect manufacturing processes, lost sales, and quality dependent return: Multi Levels Structure," International Journal of Production Economics, Elsevier, vol. 217(C), pages 298-316.
    15. Sawik, Tadeusz, 2009. "Coordinated supply chain scheduling," International Journal of Production Economics, Elsevier, vol. 120(2), pages 437-451, August.
    16. Varun Karamshetty & Harwin De Vries & Luk N. Van Wassenhove & Sarah Dewilde & Warnyta Minnaard & Dennis Ongarora & Kennedy Abuga & Prashant Yadav, 2022. "Inventory Management Practices in Private Healthcare Facilities in Nairobi County," Production and Operations Management, Production and Operations Management Society, vol. 31(2), pages 828-846, February.
    17. Sarker, Bhaba R., 2014. "Consignment stocking policy models for supply chain systems: A critical review and comparative perspectives," International Journal of Production Economics, Elsevier, vol. 155(C), pages 52-67.
    18. Glock, Christoph H. & Grosse, Eric H., 2021. "The impact of controllable production rates on the performance of inventory systems: A systematic review of the literature," European Journal of Operational Research, Elsevier, vol. 288(3), pages 703-720.
    19. Lau, Amy Hing Ling & Lau, Hon-Shiang & Wang, Jian-Cai, 2008. "How a dominant retailer might design a purchase contract for a newsvendor-type product with price-sensitive demand," European Journal of Operational Research, Elsevier, vol. 190(2), pages 443-458, October.
    20. Gümüs, Mehmet & Jewkes, Elizabeth M. & Bookbinder, James H., 2008. "Impact of consignment inventory and vendor-managed inventory for a two-party supply chain," International Journal of Production Economics, Elsevier, vol. 113(2), pages 502-517, June.
    21. Zanoni, Simone & Jaber, Mohamad Y. & Zavanella, Lucio E., 2012. "Vendor managed inventory (VMI) with consignment considering learning and forgetting effects," International Journal of Production Economics, Elsevier, vol. 140(2), pages 721-730.
    22. B. C. Giri & A. Chakraborty & T. Maiti, 2017. "Effectiveness of consignment stock policy in a three-level supply chain," Operational Research, Springer, vol. 17(1), pages 39-66, April.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Sarmah, S.P. & Acharya, D. & Goyal, S.K., 2006. "Buyer vendor coordination models in supply chain management," European Journal of Operational Research, Elsevier, vol. 175(1), pages 1-15, November.
    2. Chung, Chun Jen & Wee, Hui Ming, 2007. "Optimizing the economic lot size of a three-stage supply chain with backordering derived without derivatives," European Journal of Operational Research, Elsevier, vol. 183(2), pages 933-943, December.
    3. Lee, Shine-Der & Fu, Yen-Chen, 2014. "Joint production and delivery lot sizing for a make-to-order producer–buyer supply chain with transportation cost," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 66(C), pages 23-35.
    4. Zavanella, Lucio & Zanoni, Simone, 2009. "A one-vendor multi-buyer integrated production-inventory model: The 'Consignment Stock' case," International Journal of Production Economics, Elsevier, vol. 118(1), pages 225-232, March.
    5. Abdul-Jalbar, Beatriz & Gutierrez, Jose M. & Sicilia, Joaquin, 2007. "An integrated inventory model for the single-vendor two-buyer problem," International Journal of Production Economics, Elsevier, vol. 108(1-2), pages 246-258, July.
    6. David, Israel & Eben-Chaime, Moshe, 2003. "How far should JIT vendor-buyer relationships go?," International Journal of Production Economics, Elsevier, vol. 81(1), pages 361-368, January.
    7. Sucky, Eric, 2006. "A bargaining model with asymmetric information for a single supplier-single buyer problem," European Journal of Operational Research, Elsevier, vol. 171(2), pages 516-535, June.
    8. Sucky, Eric, 2005. "Inventory management in supply chains: A bargaining problem," International Journal of Production Economics, Elsevier, vol. 93(1), pages 253-262, January.
    9. Banerjee, Avijit & Kim, Seung-Lae & Burton, Jonathan, 2007. "Supply chain coordination through effective multi-stage inventory linkages in a JIT environment," International Journal of Production Economics, Elsevier, vol. 108(1-2), pages 271-280, July.
    10. Ben-Daya, M. & Darwish, M. & Ertogral, K., 2008. "The joint economic lot sizing problem: Review and extensions," European Journal of Operational Research, Elsevier, vol. 185(2), pages 726-742, March.
    11. Po-Yu Chen, 2017. "Optimal Retail Price Model for Partial Consignment to Multiple Retailers," Complexity, Hindawi, vol. 2017, pages 1-11, December.
    12. Simpson, N.C., 2007. "Central versus local multiple stage inventory planning: An analysis of solutions," European Journal of Operational Research, Elsevier, vol. 181(1), pages 127-138, August.
    13. Jiafu Tang & Kai-Leung Yung & Iko Kaku & Jianbo Yang, 2008. "The scheduling of deliveries in a production-distribution system with multiple buyers," Annals of Operations Research, Springer, vol. 161(1), pages 5-23, July.
    14. Jung, Jung Woo & Lee, Young Hae, 2010. "Heuristic algorithms for production and transportation planning through synchronization of a serial supply chain," International Journal of Production Economics, Elsevier, vol. 124(2), pages 433-447, April.
    15. Affisco, John F. & Javad Paknejad, M. & Nasri, Farrokh, 2002. "Quality improvement and setup reduction in the joint economic lot size model," European Journal of Operational Research, Elsevier, vol. 142(3), pages 497-508, November.
    16. Chung, Chun-Jen & Wee, Hui-Ming, 2008. "Green-component life-cycle value on design and reverse manufacturing in semi-closed supply chain," International Journal of Production Economics, Elsevier, vol. 113(2), pages 528-545, June.
    17. Bylka, Stanislaw, 2003. "Competitive and cooperative policies for the vendor-buyer system," International Journal of Production Economics, Elsevier, vol. 81(1), pages 533-544, January.
    18. Chiou, Chuang-Chun & Yao, Ming-Jong & Tsai, Jenteng, 2007. "A mutually beneficial coordination mechanism for a one-supplier multi-retailers supply chain," International Journal of Production Economics, Elsevier, vol. 108(1-2), pages 314-328, July.
    19. Chan, Chi Kin & Lee, Y.C.E. & Campbell, J.F., 2013. "Environmental performance—Impacts of vendor–buyer coordination," International Journal of Production Economics, Elsevier, vol. 145(2), pages 683-695.
    20. Kim, Seung-Lae & Ha, Daesung, 2003. "A JIT lot-splitting model for supply chain management: Enhancing buyer-supplier linkage," International Journal of Production Economics, Elsevier, vol. 86(1), pages 1-10, October.

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:proeco:v:81-82:y:2003:i:1:p:215-224. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/ijpe .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.