Heuristic algorithms for production and transportation planning through synchronization of a serial supply chain

Author

Listed:
  • Jung, Jung Woo
  • Lee, Young Hae

Abstract

This study suggests an approach that synchronizes timing points found between a supplier and a buyer in a serial supply chain with one in two timing points to allow for more efficient and agile material flow. This approach is applied to the problem of finding an optimal solution for the production quantity in each production lot and the job sequence with minimum supply chain total cost and lead time. Five heuristic algorithms were developed based on simulated annealing (SA) and a genetic algorithm (GA). Of the developed heuristic algorithms, GA2 exhibited the most robustness.

Suggested Citation

  • Jung, Jung Woo & Lee, Young Hae, 2010. "Heuristic algorithms for production and transportation planning through synchronization of a serial supply chain," International Journal of Production Economics, Elsevier, vol. 124(2), pages 433-447, April.
  • Handle: RePEc:eee:proeco:v:124:y:2010:i:2:p:433-447
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0925-5273(09)00453-8
    Download Restriction: Full text for ScienceDirect subscribers only
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Takahashi, Katsuhiko & Myreshka & Hirotani, Daisuke, 2005. "Comparing CONWIP, synchronized CONWIP, and Kanban in complex supply chains," International Journal of Production Economics, Elsevier, vol. 93(1), pages 25-40, January.
    2. Lu, Lu, 1995. "A one-vendor multi-buyer integrated inventory model," European Journal of Operational Research, Elsevier, vol. 81(2), pages 312-323, March.
    3. De Boeck, L. & Vandaele, N., 2008. "Coordination and synchronization of material flows in supply chains: An analytical approach," International Journal of Production Economics, Elsevier, vol. 116(2), pages 199-207, December.
    4. Nicholas G. Hall & Chelliah Sriskandarajah, 1996. "A Survey of Machine Scheduling Problems with Blocking and No-Wait in Process," Operations Research, INFORMS, vol. 44(3), pages 510-525, June.
    5. Chan K. Hahn & Edward A. Duplaga & Janet L. Hartley, 2000. "Supply-Chain Synchronization: Lessons from Hyundai Motor Company," Interfaces, INFORMS, vol. 30(4), pages 32-45, August.
    6. S. Lin & B. W. Kernighan, 1973. "An Effective Heuristic Algorithm for the Traveling-Salesman Problem," Operations Research, INFORMS, vol. 21(2), pages 498-516, April.
    7. Wang, Wei & Fung, Richard Y. K. & Chai, Yueting, 2004. "Approach of just-in-time distribution requirements planning for supply chain management," International Journal of Production Economics, Elsevier, vol. 91(2), pages 101-107, September.
    8. M Khouja, 2003. "Synchronization in supply chains: implications for design and management," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 54(9), pages 984-994, September.
    9. Hill, Roger M., 1997. "The single-vendor single-buyer integrated production-inventory model with a generalised policy," European Journal of Operational Research, Elsevier, vol. 97(3), pages 493-499, March.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Ik Sun Lee, 2016. "Production and shipment policy under dynamic demand in the supply chain environments," International Journal of Applied Management Science, Inderscience Enterprises Ltd, vol. 8(1), pages 1-19.
    2. Sancak, Emre & Salman, F. Sibel, 2011. "Multi-item dynamic lot-sizing with delayed transportation policy," International Journal of Production Economics, Elsevier, vol. 131(2), pages 595-603, June.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Sarmah, S.P. & Acharya, D. & Goyal, S.K., 2006. "Buyer vendor coordination models in supply chain management," European Journal of Operational Research, Elsevier, vol. 175(1), pages 1-15, November.
    2. Valentini, Giovanni & Zavanella, Lucio, 2003. "The consignment stock of inventories: industrial case and performance analysis," International Journal of Production Economics, Elsevier, vol. 81(1), pages 215-224, January.
    3. Affisco, John F. & Javad Paknejad, M. & Nasri, Farrokh, 2002. "Quality improvement and setup reduction in the joint economic lot size model," European Journal of Operational Research, Elsevier, vol. 142(3), pages 497-508, November.
    4. Chung, Chun-Jen & Wee, Hui-Ming, 2008. "Green-component life-cycle value on design and reverse manufacturing in semi-closed supply chain," International Journal of Production Economics, Elsevier, vol. 113(2), pages 528-545, June.
    5. Bylka, Stanislaw, 2003. "Competitive and cooperative policies for the vendor-buyer system," International Journal of Production Economics, Elsevier, vol. 81(1), pages 533-544, January.
    6. Chiou, Chuang-Chun & Yao, Ming-Jong & Tsai, Jenteng, 2007. "A mutually beneficial coordination mechanism for a one-supplier multi-retailers supply chain," International Journal of Production Economics, Elsevier, vol. 108(1-2), pages 314-328, July.
    7. Kim, Seung-Lae & Ha, Daesung, 2003. "A JIT lot-splitting model for supply chain management: Enhancing buyer-supplier linkage," International Journal of Production Economics, Elsevier, vol. 86(1), pages 1-10, October.
    8. Hoque, M. A. & Goyal, S. K., 2000. "An optimal policy for a single-vendor single-buyer integrated production-inventory system with capacity constraint of the transport equipment," International Journal of Production Economics, Elsevier, vol. 65(3), pages 305-315, May.
    9. Kaya, Onur & Kubalı, Deniz & Örmeci, Lerzan, 2013. "A coordinated production and shipment model in a supply chain," International Journal of Production Economics, Elsevier, vol. 143(1), pages 120-131.
    10. Chung, Chun Jen & Wee, Hui Ming, 2007. "Optimizing the economic lot size of a three-stage supply chain with backordering derived without derivatives," European Journal of Operational Research, Elsevier, vol. 183(2), pages 933-943, December.
    11. Liu, Xingchu & Cetinkaya, Sila, 2007. "A note on "quality improvement and setup reduction in the joint economic lot size model"," European Journal of Operational Research, Elsevier, vol. 182(1), pages 194-204, October.
    12. Lee, Shine-Der & Fu, Yen-Chen, 2014. "Joint production and delivery lot sizing for a make-to-order producer–buyer supply chain with transportation cost," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 66(C), pages 23-35.
    13. Bylka, Stanislaw, 2009. "Non-cooperative strategies for production and shipments lot sizing in the vendor-buyer system," International Journal of Production Economics, Elsevier, vol. 118(1), pages 243-252, March.
    14. Gümüs, Mehmet & Jewkes, Elizabeth M. & Bookbinder, James H., 2008. "Impact of consignment inventory and vendor-managed inventory for a two-party supply chain," International Journal of Production Economics, Elsevier, vol. 113(2), pages 502-517, June.
    15. AlDurgam, Mohammad & Adegbola, Kehinde & Glock, Christoph H., 2017. "A single-vendor single-manufacturer integrated inventory model with stochastic demand and variable production rate," International Journal of Production Economics, Elsevier, vol. 191(C), pages 335-350.
    16. Zavanella, Lucio & Zanoni, Simone, 2009. "A one-vendor multi-buyer integrated production-inventory model: The 'Consignment Stock' case," International Journal of Production Economics, Elsevier, vol. 118(1), pages 225-232, March.
    17. Zhou, Yong-Wu & Wang, Sheng-Dong, 2007. "Optimal production and shipment models for a single-vendor-single-buyer integrated system," European Journal of Operational Research, Elsevier, vol. 180(1), pages 309-328, July.
    18. Ho, Chia-Huei & Ouyang, Liang-Yuh & Su, Chia-Hsien, 2008. "Optimal pricing, shipment and payment policy for an integrated supplier-buyer inventory model with two-part trade credit," European Journal of Operational Research, Elsevier, vol. 187(2), pages 496-510, June.
    19. Abdul-Jalbar, Beatriz & Gutierrez, Jose M. & Sicilia, Joaquin, 2007. "An integrated inventory model for the single-vendor two-buyer problem," International Journal of Production Economics, Elsevier, vol. 108(1-2), pages 246-258, July.
    20. E J Comeaux & B R Sarker, 2005. "Joint optimization of process improvement investments for supplier–buyer cooperative commerce," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 56(11), pages 1310-1324, November.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:proeco:v:124:y:2010:i:2:p:433-447. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/ijpe .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.