IDEAS home Printed from https://ideas.repec.org/a/eee/proeco/v130y2011i1p125-133.html
   My bibliography  Save this article

A multi-objective dynamic scheduling approach using multiple attribute decision making in semiconductor manufacturing

Author

Listed:
  • Yao, Shiqing
  • Jiang, Zhibin
  • Li, Na
  • Zhang, Huai
  • Geng, Na

Abstract

This paper proposes a multi-objective dynamic scheduling approach that combines three attributes based on a hybrid multiple attribute decision making (MADM) technique. With consideration of two kinds of uncertainties, three advanced attributes are specifically designed to optimize four key performance measures. Each attribute is converted into a relative closeness to the ideal alternative, and collaborate with the others at each scheduling instant. Furthermore, a cutoff method is used to make the proposed approach adapt to full-scale semiconductor manufacturing systems (SMSs) better. Results in two SMS models show that the proposed approach is validated for the real-time multi-objective scheduling problem.

Suggested Citation

  • Yao, Shiqing & Jiang, Zhibin & Li, Na & Zhang, Huai & Geng, Na, 2011. "A multi-objective dynamic scheduling approach using multiple attribute decision making in semiconductor manufacturing," International Journal of Production Economics, Elsevier, vol. 130(1), pages 125-133, March.
  • Handle: RePEc:eee:proeco:v:130:y:2011:i:1:p:125-133
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0925-5273(10)00483-4
    Download Restriction: Full text for ScienceDirect subscribers only
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. R. W. Conway & W. L. Maxwell, 1962. "Network Dispatching by the Shortest-Operation Discipline," Operations Research, INFORMS, vol. 10(1), pages 51-73, February.
    2. Robert C. Leachman & Jeenyoung Kang & Vincent Lin, 2002. "SLIM: Short Cycle Time and Low Inventory in Manufacturing at Samsung Electronics," Interfaces, INFORMS, vol. 32(1), pages 61-77, February.
    3. Olafsson, Sigurdur & Li, Xiaonan, 2010. "Learning effective new single machine dispatching rules from optimal scheduling data," International Journal of Production Economics, Elsevier, vol. 128(1), pages 118-126, November.
    4. Wu, Muh-Cherng & Jiang, Jr-Hsiung & Chang, Wen-Jen, 2008. "Scheduling a hybrid MTO/MTS semiconductor fab with machine-dedication features," International Journal of Production Economics, Elsevier, vol. 112(1), pages 416-426, March.
    5. Wong, Bo K. & Lai, Vincent S., 2011. "A survey of the application of fuzzy set theory in production and operations management: 1998-2009," International Journal of Production Economics, Elsevier, vol. 129(1), pages 157-168, January.
    6. Thiesse, Frédéric & Fleisch, Elgar, 2008. "On the value of location information to lot scheduling in complex manufacturing processes," International Journal of Production Economics, Elsevier, vol. 112(2), pages 532-547, April.
    7. Vinod, V. & Sridharan, R., 2011. "Simulation modeling and analysis of due-date assignment methods and scheduling decision rules in a dynamic job shop production system," International Journal of Production Economics, Elsevier, vol. 129(1), pages 127-146, January.
    8. Allahverdi, Ali & Soroush, H.M., 2008. "The significance of reducing setup times/setup costs," European Journal of Operational Research, Elsevier, vol. 187(3), pages 978-984, June.
    9. Yang, Taho & Chou, Pohung, 2005. "Solving a multiresponse simulation-optimization problem with discrete variables using a multiple-attribute decision-making method," Mathematics and Computers in Simulation (MATCOM), Elsevier, vol. 68(1), pages 9-21.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Yu-Fang Wang, 2020. "Adaptive job shop scheduling strategy based on weighted Q-learning algorithm," Journal of Intelligent Manufacturing, Springer, vol. 31(2), pages 417-432, February.
    2. Eduardo Fernández & Claudia Gómez-Santillán & Nelson Rangel-Valdez & Laura Cruz-Reyes, 2022. "Group Multi-Objective Optimization Under Imprecision and Uncertainty Using a Novel Interval Outranking Approach," Group Decision and Negotiation, Springer, vol. 31(5), pages 945-994, October.
    3. Fausto Balderas & Eduardo Fernandez & Claudia Gomez-Santillan & Nelson Rangel-Valdez & Laura Cruz, 2019. "An Interval-Based Approach for Evolutionary Multi-Objective Optimization of Project Portfolios," International Journal of Information Technology & Decision Making (IJITDM), World Scientific Publishing Co. Pte. Ltd., vol. 18(04), pages 1317-1358, July.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. A. S. Xanthopoulos & D. E. Koulouriotis, 2018. "Cluster analysis and neural network-based metamodeling of priority rules for dynamic sequencing," Journal of Intelligent Manufacturing, Springer, vol. 29(1), pages 69-91, January.
    2. Pickardt, Christoph W. & Hildebrandt, Torsten & Branke, Jürgen & Heger, Jens & Scholz-Reiter, Bernd, 2013. "Evolutionary generation of dispatching rule sets for complex dynamic scheduling problems," International Journal of Production Economics, Elsevier, vol. 145(1), pages 67-77.
    3. Li, Yan-Lai & Tang, Jia-Fu & Chin, Kwai-Sang & Jiang, Yu-Shi & Han, Yi & Pu, Yun, 2011. "Estimating the final priority ratings of engineering characteristics in mature-period product improvement by MDBA and AHP," International Journal of Production Economics, Elsevier, vol. 131(2), pages 575-586, June.
    4. David Opresnik & Maurizio Fiasché & Marco Taisch & Manuel Hirsch, 0. "An evolving fuzzy inference system for extraction of rule set for planning a product–service strategy," Information Technology and Management, Springer, vol. 0, pages 1-17.
    5. Zhou, Wei & Piramuthu, Selwyn, 2012. "Manufacturing with item-level RFID information: From macro to micro quality control," International Journal of Production Economics, Elsevier, vol. 135(2), pages 929-938.
    6. Yang, Taho & Wen, Yuan-Feng & Wang, Fang-Fang, 2011. "Evaluation of robustness of supply chain information-sharing strategies using a hybrid Taguchi and multiple criteria decision-making method," International Journal of Production Economics, Elsevier, vol. 134(2), pages 458-466, December.
    7. Romauch, Martin & Hartl, Richard F., 2017. "Capacity planning for cluster tools in the semiconductor industry," International Journal of Production Economics, Elsevier, vol. 194(C), pages 167-180.
    8. Kenneth David Strang, 2012. "Man versus math: Behaviorist exploration of post-crisis non-banking asset management," Journal of Asset Management, Palgrave Macmillan, vol. 13(5), pages 348-367, October.
    9. Leachman, Robert C. & Ding, Shengwei, 2007. "Integration of speed economics into decision-making for manufacturing management," International Journal of Production Economics, Elsevier, vol. 107(1), pages 39-55, May.
    10. Chuang Wang & Pingyu Jiang, 2019. "Deep neural networks based order completion time prediction by using real-time job shop RFID data," Journal of Intelligent Manufacturing, Springer, vol. 30(3), pages 1303-1318, March.
    11. Seyed Mahmoud Zanjirchi & Mina Rezaeian Abrishami & Negar Jalilian, 2019. "Four decades of fuzzy sets theory in operations management: application of life-cycle, bibliometrics and content analysis," Scientometrics, Springer;Akadémiai Kiadó, vol. 119(3), pages 1289-1309, June.
    12. Phillip O. Kriett & Sebastian Eirich & Martin Grunow, 2017. "Cycle time-oriented mid-term production planning for semiconductor wafer fabrication," International Journal of Production Research, Taylor & Francis Journals, vol. 55(16), pages 4662-4679, August.
    13. Jin Xu & Natarajan Gautam, 2020. "On competitive analysis for polling systems," Naval Research Logistics (NRL), John Wiley & Sons, vol. 67(6), pages 404-419, September.
    14. Tanja Mlinar & Philippe Chevalier, 2016. "Pooling heterogeneous products for manufacturing environments," 4OR, Springer, vol. 14(2), pages 173-200, June.
    15. Md. Abdul Moktadir & Towfique Rahman & Syed Mithun Ali & Nazmun Nahar & Sanjoy Kumar Paul, 2020. "Examining barriers to reverse logistics practices in the leather footwear industry," Annals of Operations Research, Springer, vol. 293(2), pages 715-746, October.
    16. Sheikh, Shaya & Komaki, G.M. & Kayvanfar, Vahid & Teymourian, Ehsan, 2019. "Multi-Stage assembly flow shop with setup time and release time," Operations Research Perspectives, Elsevier, vol. 6(C).
    17. Anne Benoit & Mathias Coqblin & Jean-Marc Nicod & Veronika Rehn-Sonigo, 2016. "Optimizing memory allocation for multistage scheduling including setup times," Journal of Scheduling, Springer, vol. 19(6), pages 641-658, December.
    18. Beemsterboer, Bart & Land, Martin & Teunter, Ruud, 2016. "Hybrid MTO-MTS production planning: An explorative study," European Journal of Operational Research, Elsevier, vol. 248(2), pages 453-461.
    19. Sioud, A. & Gagné, C., 2018. "Enhanced migrating birds optimization algorithm for the permutation flow shop problem with sequence dependent setup times," European Journal of Operational Research, Elsevier, vol. 264(1), pages 66-73.
    20. Al-Hinai, Nasr & ElMekkawy, T.Y., 2011. "Robust and stable flexible job shop scheduling with random machine breakdowns using a hybrid genetic algorithm," International Journal of Production Economics, Elsevier, vol. 132(2), pages 279-291, August.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:proeco:v:130:y:2011:i:1:p:125-133. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/ijpe .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.