IDEAS home Printed from https://ideas.repec.org/a/eee/proeco/v115y2008i1p128-133.html
   My bibliography  Save this article

Single-machine group-scheduling problems with deteriorating setup times and job-processing times

Author

Listed:
  • Wu, Chin-Chia
  • Lee, Wen-Chiung

Abstract

No abstract is available for this item.

Suggested Citation

  • Wu, Chin-Chia & Lee, Wen-Chiung, 2008. "Single-machine group-scheduling problems with deteriorating setup times and job-processing times," International Journal of Production Economics, Elsevier, vol. 115(1), pages 128-133, September.
  • Handle: RePEc:eee:proeco:v:115:y:2008:i:1:p:128-133
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0925-5273(08)00150-3
    Download Restriction: Full text for ScienceDirect subscribers only
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Kunnathur, Anand S. & Gupta, Sushil K., 1990. "Minimizing the makespan with late start penalties added to processing times in a single facility scheduling problem," European Journal of Operational Research, Elsevier, vol. 47(1), pages 56-64, July.
    2. Sid Browne & Uri Yechiali, 1990. "Scheduling Deteriorating Jobs on a Single Processor," Operations Research, INFORMS, vol. 38(3), pages 495-498, June.
    3. Schaller, Jeffrey, 2007. "Scheduling on a single machine with family setups to minimize total tardiness," International Journal of Production Economics, Elsevier, vol. 105(2), pages 329-344, February.
    4. A A K Jeng & B M T Lin, 2007. "A note on parallel-machine scheduling with deteriorating jobs," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 58(6), pages 824-826, June.
    5. Wu, Chin-Chia & Lee, Wen-Chiung, 2006. "Two-machine flowshop scheduling to minimize mean flow time under linear deterioration," International Journal of Production Economics, Elsevier, vol. 103(2), pages 572-584, October.
    6. Kang, Liying & Ng, C.T., 2007. "A note on a fully polynomial-time approximation scheme for parallel-machine scheduling with deteriorating jobs," International Journal of Production Economics, Elsevier, vol. 109(1-2), pages 180-184, September.
    7. Cheng, T. C. E. & Ding, Q. & Lin, B. M. T., 2004. "A concise survey of scheduling with time-dependent processing times," European Journal of Operational Research, Elsevier, vol. 152(1), pages 1-13, January.
    8. Voutsinas, Theodore G. & Pappis, Costas P., 2002. "Scheduling jobs with values exponentially deteriorating over time," International Journal of Production Economics, Elsevier, vol. 79(3), pages 163-169, October.
    9. C. Ng & T. Cheng & Adam Janiak & Mikhail Kovalyov, 2005. "Group Scheduling with Controllable Setup and Processing Times: Minimizing Total Weighted Completion Time," Annals of Operations Research, Springer, vol. 133(1), pages 163-174, January.
    10. B Alidaee & N K Womer, 1999. "Scheduling with time dependent processing times: Review and extensions," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 50(7), pages 711-720, July.
    11. Chiou, Chuang-Chun & Yao, Ming-Jong & Tsai, Jenteng, 2007. "A mutually beneficial coordination mechanism for a one-supplier multi-retailers supply chain," International Journal of Production Economics, Elsevier, vol. 108(1-2), pages 314-328, July.
    12. Wang, Xiuli & Edwin Cheng, T.C., 2007. "Single-machine scheduling with deteriorating jobs and learning effects to minimize the makespan," European Journal of Operational Research, Elsevier, vol. 178(1), pages 57-70, April.
    13. Scott Webster & Kenneth R. Baker, 1995. "Scheduling Groups of Jobs on a Single Machine," Operations Research, INFORMS, vol. 43(4), pages 692-703, August.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Allahverdi, Ali, 2015. "The third comprehensive survey on scheduling problems with setup times/costs," European Journal of Operational Research, Elsevier, vol. 246(2), pages 345-378.
    2. Baoyu Liao & Qingru Song & Jun Pei & Shanlin Yang & Panos M. Pardalos, 2020. "Parallel-machine group scheduling with inclusive processing set restrictions, outsourcing option and serial-batching under the effect of step-deterioration," Journal of Global Optimization, Springer, vol. 78(4), pages 717-742, December.
    3. Zhao, Chuanli & Tang, Hengyong, 2012. "Two-machine flow shop scheduling with deteriorating jobs and chain precedence constraints," International Journal of Production Economics, Elsevier, vol. 136(1), pages 131-136.
    4. Jun Pei & Xinbao Liu & Panos M. Pardalos & Athanasios Migdalas & Shanlin Yang, 2017. "Serial-batching scheduling with time-dependent setup time and effects of deterioration and learning on a single-machine," Journal of Global Optimization, Springer, vol. 67(1), pages 251-262, January.
    5. L-H Sun & L-Y Sun & J-B Wang, 2011. "Single-machine scheduling to minimize total absolute differences in waiting times with deteriorating jobs," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 62(4), pages 768-775, April.
    6. Jim (Junmin) Shi & Xiaohang Yue & Yao Zhao, 2014. "Operations sequencing for a multi‐stage production inventory system," Naval Research Logistics (NRL), John Wiley & Sons, vol. 61(2), pages 144-154, March.
    7. Zhang Xingong & Wang Yong & Bai Shikun, 2016. "Single-machine group scheduling problems with deteriorating and learning effect," International Journal of Systems Science, Taylor & Francis Journals, vol. 47(10), pages 2402-2410, July.
    8. Pei, Jun & Pardalos, Panos M. & Liu, Xinbao & Fan, Wenjuan & Yang, Shanlin, 2015. "Serial batching scheduling of deteriorating jobs in a two-stage supply chain to minimize the makespan," European Journal of Operational Research, Elsevier, vol. 244(1), pages 13-25.
    9. Wang, Ting & Baldacci, Roberto & Lim, Andrew & Hu, Qian, 2018. "A branch-and-price algorithm for scheduling of deteriorating jobs and flexible periodic maintenance on a single machine," European Journal of Operational Research, Elsevier, vol. 271(3), pages 826-838.
    10. Jun Pei & Xinbao Liu & Panos M. Pardalos & Wenjuan Fan & Shanlin Yang, 2017. "Scheduling deteriorating jobs on a single serial-batching machine with multiple job types and sequence-dependent setup times," Annals of Operations Research, Springer, vol. 249(1), pages 175-195, February.
    11. Min Ji & Chou-Jung Hsu & Dar-Li Yang, 2013. "Single-machine scheduling with deteriorating jobs and aging effects under an optional maintenance activity consideration," Journal of Combinatorial Optimization, Springer, vol. 26(3), pages 437-447, October.
    12. Radosław Rudek, 2012. "Scheduling problems with position dependent job processing times: computational complexity results," Annals of Operations Research, Springer, vol. 196(1), pages 491-516, July.
    13. Dirk Briskorn & Konrad Stephan & Nils Boysen, 2022. "Minimizing the makespan on a single machine subject to modular setups," Journal of Scheduling, Springer, vol. 25(1), pages 125-137, February.
    14. Li, Yongqiang & Li, Gang & Sun, Linyan & Xu, Zhiyong, 2009. "Single machine scheduling of deteriorating jobs to minimize total absolute differences in completion times," International Journal of Production Economics, Elsevier, vol. 118(2), pages 424-429, April.
    15. Jin, Xianfei & Li, Kunpeng & Sivakumar, Appa Iyer, 2013. "Scheduling and optimal delivery time quotation for customers with time sensitive demand," International Journal of Production Economics, Elsevier, vol. 145(1), pages 349-358.
    16. Lee, Wen-Chiung & Shiau, Yau-Ren & Chen, Shiuan-Kang & Wu, Chin-Chia, 2010. "A two-machine flowshop scheduling problem with deteriorating jobs and blocking," International Journal of Production Economics, Elsevier, vol. 124(1), pages 188-197, March.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Stanisław Gawiejnowicz, 2020. "A review of four decades of time-dependent scheduling: main results, new topics, and open problems," Journal of Scheduling, Springer, vol. 23(1), pages 3-47, February.
    2. Lee, Wen-Chiung & Shiau, Yau-Ren & Chen, Shiuan-Kang & Wu, Chin-Chia, 2010. "A two-machine flowshop scheduling problem with deteriorating jobs and blocking," International Journal of Production Economics, Elsevier, vol. 124(1), pages 188-197, March.
    3. Wu, Chin-Chia & Lee, Wen-Chiung, 2006. "Two-machine flowshop scheduling to minimize mean flow time under linear deterioration," International Journal of Production Economics, Elsevier, vol. 103(2), pages 572-584, October.
    4. Shakeri, Shakib & Logendran, Rasaratnam, 2007. "A mathematical programming-based scheduling framework for multitasking environments," European Journal of Operational Research, Elsevier, vol. 176(1), pages 193-209, January.
    5. Dar-Li Yang & Wen-Hung Kuo, 2009. "Single-machine scheduling with both deterioration and learning effects," Annals of Operations Research, Springer, vol. 172(1), pages 315-327, November.
    6. Ming Liu & Feifeng Zheng & Chengbin Chu & Jiantong Zhang, 2012. "An FPTAS for uniform machine scheduling to minimize makespan with linear deterioration," Journal of Combinatorial Optimization, Springer, vol. 23(4), pages 483-492, May.
    7. C-C He & C-C Wu & W-C Lee, 2009. "Branch-and-bound and weight-combination search algorithms for the total completion time problem with step-deteriorating jobs," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 60(12), pages 1759-1766, December.
    8. Min Ji & Chou-Jung Hsu & Dar-Li Yang, 2013. "Single-machine scheduling with deteriorating jobs and aging effects under an optional maintenance activity consideration," Journal of Combinatorial Optimization, Springer, vol. 26(3), pages 437-447, October.
    9. Hongfeng Wang & Min Huang & Junwei Wang, 2019. "An effective metaheuristic algorithm for flowshop scheduling with deteriorating jobs," Journal of Intelligent Manufacturing, Springer, vol. 30(7), pages 2733-2742, October.
    10. Qian, Jianbo & Steiner, George, 2013. "Fast algorithms for scheduling with learning effects and time-dependent processing times on a single machine," European Journal of Operational Research, Elsevier, vol. 225(3), pages 547-551.
    11. J-B Wang & J-J Wang & P Ji, 2011. "Scheduling jobs with chain precedence constraints and deteriorating jobs," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 62(9), pages 1765-1770, September.
    12. Li, Yongqiang & Li, Gang & Sun, Linyan & Xu, Zhiyong, 2009. "Single machine scheduling of deteriorating jobs to minimize total absolute differences in completion times," International Journal of Production Economics, Elsevier, vol. 118(2), pages 424-429, April.
    13. Wang, Ji-Bo, 2007. "Single-machine scheduling problems with the effects of learning and deterioration," Omega, Elsevier, vol. 35(4), pages 397-402, August.
    14. Wen-Chiung Lee, 2004. "A Note on Deteriorating Jobs and Learning in Single-Machine Scheduling Problems," International Journal of Business and Economics, School of Management Development, Feng Chia University, Taichung, Taiwan, vol. 3(1), pages 83-89, April.
    15. Ma, Ran & Tao, Jiping & Yuan, Jinjiang, 2016. "Online scheduling with linear deteriorating jobs to minimize the total weighted completion time," Applied Mathematics and Computation, Elsevier, vol. 273(C), pages 570-583.
    16. Wang, Xiuli & Edwin Cheng, T.C., 2007. "Single-machine scheduling with deteriorating jobs and learning effects to minimize the makespan," European Journal of Operational Research, Elsevier, vol. 178(1), pages 57-70, April.
    17. Xing Chai & Wenhua Li & Hang Yuan & Libo Wang, 0. "Online scheduling on a single machine with linear deteriorating processing times and delivery times," Journal of Combinatorial Optimization, Springer, vol. 0, pages 1-13.
    18. Delorme, Maxence & Iori, Manuel & Mendes, Nilson F.M., 2021. "Solution methods for scheduling problems with sequence-dependent deterioration and maintenance events," European Journal of Operational Research, Elsevier, vol. 295(3), pages 823-837.
    19. Xing Chai & Wenhua Li & Hang Yuan & Libo Wang, 2022. "Online scheduling on a single machine with linear deteriorating processing times and delivery times," Journal of Combinatorial Optimization, Springer, vol. 44(3), pages 1900-1912, October.
    20. Florian Jaehn & Helmut A. Sedding, 2016. "Scheduling with time-dependent discrepancy times," Journal of Scheduling, Springer, vol. 19(6), pages 737-757, December.

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:proeco:v:115:y:2008:i:1:p:128-133. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/ijpe .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.