IDEAS home Printed from https://ideas.repec.org/a/eee/jomega/v25y1997i4p437-447.html
   My bibliography  Save this article

Scheduling jobs with uncertain setup times and sequence dependency

Author

Listed:
  • Kim, S. C.
  • Bobrowski, P. M.

Abstract

In many real-world job-shop situations, jobs are sequence dependent and the setup times for those jobs vary stochastically because of such random factors as crew skills, temporary shortage of equipment, tools and setup crews, and unexpected breakdowns of fixtures and tools during a setup operation. Assuming these random setup times to be fixed at, say, their expected values, which is often done in the extant literature, may lead to development of inefficient sequencing rules. The purpose of the present paper is to investigate the impact of setup-time variation on sequencing decisions, with normally-distributed setup times. Results show that setup-time variation has a negative impact on shop performance, but does not diminish the advantages of setup-conscious sequencing rules over conventional sequencing rules in dealing with setup times. A simulation model of a nine-machine job-shop is used in the investigation.

Suggested Citation

  • Kim, S. C. & Bobrowski, P. M., 1997. "Scheduling jobs with uncertain setup times and sequence dependency," Omega, Elsevier, vol. 25(4), pages 437-447, August.
  • Handle: RePEc:eee:jomega:v:25:y:1997:i:4:p:437-447
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0305-0483(97)00013-3
    Download Restriction: Full text for ScienceDirect subscribers only
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Leonard Adler & Nelson Fraiman & Edward Kobacker & Michael Pinedo & Juan Carlos Plotnicoff & Tso Pang Wu, 1993. "BPSS: A Scheduling Support System for the Packaging Industry," Operations Research, INFORMS, vol. 41(4), pages 641-648, August.
    2. J. William Gavett, 1965. "Three Heuristic Rules for Sequencing Jobs to a Single Production Facility," Management Science, INFORMS, vol. 11(8), pages 166-176, June.
    3. James C. Hershauer & Ronald J. Ebert, 1975. "Search and Simulation Selection of a Job-Shop Sequencing Rule," Management Science, INFORMS, vol. 21(7), pages 833-843, March.
    4. Deane, Richard H. & Yang, Jiaqin, 1992. "Product mix selection and closed manufacturing cell flow time performance," International Journal of Production Economics, Elsevier, vol. 28(2), pages 157-169, November.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Allahverdi, Ali & Ng, C.T. & Cheng, T.C.E. & Kovalyov, Mikhail Y., 2008. "A survey of scheduling problems with setup times or costs," European Journal of Operational Research, Elsevier, vol. 187(3), pages 985-1032, June.
    2. Nait Tahar, Djamel & Yalaoui, Farouk & Chu, Chengbin & Amodeo, Lionel, 2006. "A linear programming approach for identical parallel machine scheduling with job splitting and sequence-dependent setup times," International Journal of Production Economics, Elsevier, vol. 99(1-2), pages 63-73, February.
    3. Meloni, Carlo & Pranzo, Marco & Samà, Marcella, 2022. "Evaluation of VaR and CVaR for the makespan in interval valued blocking job shops," International Journal of Production Economics, Elsevier, vol. 247(C).

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Schaller, Jeffrey E. & Gupta, Jatinder N. D. & Vakharia, Asoo J., 2000. "Scheduling a flowline manufacturing cell with sequence dependent family setup times," European Journal of Operational Research, Elsevier, vol. 125(2), pages 324-339, September.
    2. Liao, C. J. & Yu, W. C., 1996. "Sequencing heuristics for dependent setups in a continuous process industry," Omega, Elsevier, vol. 24(6), pages 649-659, December.
    3. Agliari, Anna & Diligenti, Mauro & Zavanella, Lucio, 1995. "Variable priority dispatching rules: An analytical approach," International Journal of Production Economics, Elsevier, vol. 41(1-3), pages 51-58, October.
    4. Allahverdi, Ali & Gupta, Jatinder N. D. & Aldowaisan, Tariq, 1999. "A review of scheduling research involving setup considerations," Omega, Elsevier, vol. 27(2), pages 219-239, April.
    5. Gheisariha, Elmira & Tavana, Madjid & Jolai, Fariborz & Rabiee, Meysam, 2021. "A simulation–optimization model for solving flexible flow shop scheduling problems with rework and transportation," Mathematics and Computers in Simulation (MATCOM), Elsevier, vol. 180(C), pages 152-178.
    6. Pickardt, Christoph W. & Hildebrandt, Torsten & Branke, Jürgen & Heger, Jens & Scholz-Reiter, Bernd, 2013. "Evolutionary generation of dispatching rule sets for complex dynamic scheduling problems," International Journal of Production Economics, Elsevier, vol. 145(1), pages 67-77.
    7. Miguel A. González & Juan José Palacios & Camino R. Vela & Alejandro Hernández-Arauzo, 2017. "Scatter search for minimizing weighted tardiness in a single machine scheduling with setups," Journal of Heuristics, Springer, vol. 23(2), pages 81-110, June.
    8. Quadt, Daniel & Kuhn, Heinrich, 2007. "A taxonomy of flexible flow line scheduling procedures," European Journal of Operational Research, Elsevier, vol. 178(3), pages 686-698, May.
    9. Nauss, Robert M., 2008. "Optimal sequencing in the presence of setup times for tow/barge traffic through a river lock," European Journal of Operational Research, Elsevier, vol. 187(3), pages 1268-1281, June.
    10. Azadivar, Farhad & Lee, Young-Hae, 1988. "Optimization of discrete variable stochastic systems by computer simulation," Mathematics and Computers in Simulation (MATCOM), Elsevier, vol. 30(4), pages 331-345.
    11. Tzu-Li Chen & Chen-Yang Cheng & Yi-Han Chou, 2020. "Multi-objective genetic algorithm for energy-efficient hybrid flow shop scheduling with lot streaming," Annals of Operations Research, Springer, vol. 290(1), pages 813-836, July.
    12. Ruiz, Rubén & Vázquez-Rodríguez, José Antonio, 2010. "The hybrid flow shop scheduling problem," European Journal of Operational Research, Elsevier, vol. 205(1), pages 1-18, August.
    13. Chandrashekar, Ashok & Callarman, Thomas E., 1998. "A modelling study of the effects of continuous incremental improvement in the case of a process shop," European Journal of Operational Research, Elsevier, vol. 109(1), pages 111-121, August.
    14. Ruiz, Ruben & Maroto, Concepcion, 2006. "A genetic algorithm for hybrid flowshops with sequence dependent setup times and machine eligibility," European Journal of Operational Research, Elsevier, vol. 169(3), pages 781-800, March.
    15. Durk-Jouke van der Zee, 2017. "Coordinating batching decisions in manufacturing networks," International Journal of Production Research, Taylor & Francis Journals, vol. 55(18), pages 5405-5422, September.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:jomega:v:25:y:1997:i:4:p:437-447. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/wps/find/journaldescription.cws_home/375/description#description .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.