IDEAS home Printed from https://ideas.repec.org/a/eee/ejores/v287y2020i3p964-974.html
   My bibliography  Save this article

Efficient truncated repetitive lot inspection using Poisson defect counts and prior information

Author

Listed:
  • Pérez-González, Carlos J.
  • Fernández, Arturo J.
  • Kohansal, Akram

Abstract

Optimal truncated repetitive sampling plans for inspecting lots of manufactured material using Poisson defect count data and prior information are obtained by minimizing the expected sampling effort. The proposed plans outperform the repetitive and single inspection schemes and they are shown to be better in reducing the number of sample units drawn from the lot. In truncated repetitive plans, the lots can be reinspected, at most, an optimal number of times when their acceptance or rejection cannot be concluded from the original inspection. Assuming a gamma prior model to describe the uncertainty about the unknown defect rate, a computational procedure is proposed to determine the truncated repetitive sampling plans with minimum expected sampling effort by solving integer nonlinear programming problems. The inclusion of lot reinspections, as well as previous information into the decision criteria, also provides the practitioners with a more precise evaluation of the expected producer’s and consumer’s risks. The results obtained illustrate that truncated repetitive plans with expected risks produce important savings in inspection time and cost with respect to conventional sampling schemes based on the classical requirements of quality levels and risks. An application concerning the manufacturing of glass is provided for illustrative purposes.

Suggested Citation

  • Pérez-González, Carlos J. & Fernández, Arturo J. & Kohansal, Akram, 2020. "Efficient truncated repetitive lot inspection using Poisson defect counts and prior information," European Journal of Operational Research, Elsevier, vol. 287(3), pages 964-974.
  • Handle: RePEc:eee:ejores:v:287:y:2020:i:3:p:964-974
    DOI: 10.1016/j.ejor.2020.05.027
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0377221720304574
    Download Restriction: Full text for ScienceDirect subscribers only

    File URL: https://libkey.io/10.1016/j.ejor.2020.05.027?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Wu, Chien-Wei, 2012. "An efficient inspection scheme for variables based on Taguchi capability index," European Journal of Operational Research, Elsevier, vol. 223(1), pages 116-122.
    2. Hsu, Ya-Chen & Pearn, W.L. & Wu, Pei-Ching, 2008. "Capability adjustment for gamma processes with mean shift consideration in implementing Six Sigma program," European Journal of Operational Research, Elsevier, vol. 191(2), pages 517-529, December.
    3. Lu, Wanbo & Tsai, Tzong-Ru, 2009. "Interval censored sampling plans for the gamma lifetime model," European Journal of Operational Research, Elsevier, vol. 192(1), pages 116-124, January.
    4. Wanbo Lu & Tzong-Ru Tsai, 2009. "Interval censored sampling plans for the log-logistic lifetime distribution," Journal of Applied Statistics, Taylor & Francis Journals, vol. 36(5), pages 521-536.
    5. S. Balamurali & Chi-hyuck Jun, 2006. "Repetitive group sampling procedure for variables inspection," Journal of Applied Statistics, Taylor & Francis Journals, vol. 33(3), pages 327-338.
    6. Qin, Ruwen & Cudney, Elizabeth A. & Hamzic, Zlatan, 2015. "An optimal plan of zero-defect single-sampling by attributes for incoming inspections in assembly lines," European Journal of Operational Research, Elsevier, vol. 246(3), pages 907-915.
    7. Lepore, A. & Palumbo, B. & Castagliola, P., 2018. "A note on decision making method for product acceptance based on process capability indices Cpk and Cpmk," European Journal of Operational Research, Elsevier, vol. 267(1), pages 393-398.
    8. Chien-Wei Wu & Shih-Wen Liu, 2018. "A new lot sentencing approach by variables inspection based on process yield," International Journal of Production Research, Taylor & Francis Journals, vol. 56(12), pages 4087-4099, June.
    9. Nani Kurniati & Ruey-Huei Yeh & Chien-Wei Wu, 2015. "Designing a variables two-plan sampling system of type TNTVSS-(nT, nN; k) for controlling process fraction nonconforming with unilateral specification limit," International Journal of Production Research, Taylor & Francis Journals, vol. 53(7), pages 2011-2025, April.
    10. Mohammad Saber Fallah Nezhad & Faeze Zahmatkesh Saredorahi, 2018. "A new policy for designing acceptance sampling plan based on Bayesian inference in the presence of inspection errors," Communications in Statistics - Theory and Methods, Taylor & Francis Journals, vol. 47(21), pages 5307-5318, November.
    11. R. Vijayaraghavan & K. Rajagopal & A. Loganathan, 2008. "A procedure for selection of a gamma-Poisson single sampling plan by attributes," Journal of Applied Statistics, Taylor & Francis Journals, vol. 35(2), pages 149-160.
    12. CHEN, Piao & YE, Zhi-Sheng, 2018. "A systematic look at the gamma process capability indices," European Journal of Operational Research, Elsevier, vol. 265(2), pages 589-597.
    Full references (including those not matched with items on IDEAS)

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Fernández, Arturo J., 2017. "Economic lot sampling inspection from defect counts with minimum conditional value-at-risk," European Journal of Operational Research, Elsevier, vol. 258(2), pages 573-580.
    2. CHEN, Piao & YE, Zhi-Sheng, 2018. "A systematic look at the gamma process capability indices," European Journal of Operational Research, Elsevier, vol. 265(2), pages 589-597.
    3. Ji Hwan Cha & Sophie Mercier, 2022. "Two Reliability Acceptance Sampling Plans for Items Subject to Wiener Process of Degradation," Methodology and Computing in Applied Probability, Springer, vol. 24(3), pages 1651-1668, September.
    4. Amy H. I. Lee & Chien-Wei Wu & Yen-Wen Chen, 2016. "A modified variables repetitive group sampling plan with the consideration of preceding lots information," Annals of Operations Research, Springer, vol. 238(1), pages 355-373, March.
    5. Lee‐Shen Chen & Ming‐Chung Yang & TaChen Liang, 2015. "Bayesian sampling plans for exponential distributions with interval censored samples," Naval Research Logistics (NRL), John Wiley & Sons, vol. 62(7), pages 604-616, October.
    6. Xun Xiao & Amitava Mukherjee & Min Xie, 2016. "Estimation procedures for grouped data – a comparative study," Journal of Applied Statistics, Taylor & Francis Journals, vol. 43(11), pages 2110-2130, August.
    7. Amy Lee & Chien-Wei Wu & Yen-Wen Chen, 2016. "A modified variables repetitive group sampling plan with the consideration of preceding lots information," Annals of Operations Research, Springer, vol. 238(1), pages 355-373, March.
    8. Fernández, Arturo J. & Correa-Álvarez, Cristian D. & Pericchi, Luis R., 2020. "Balancing producer and consumer risks in optimal attribute testing: A unified Bayesian/Frequentist design," European Journal of Operational Research, Elsevier, vol. 286(2), pages 576-587.
    9. Wu, Chien-Wei, 2012. "An efficient inspection scheme for variables based on Taguchi capability index," European Journal of Operational Research, Elsevier, vol. 223(1), pages 116-122.
    10. Chien-Wei Wu & Ming-Hung Shu & Pei-An Wang & Bi-Min Hsu, 2021. "Variables skip-lot sampling plans on the basis of process capability index for products with a low fraction of defectives," Computational Statistics, Springer, vol. 36(2), pages 1391-1413, June.
    11. Ammara Tanveer & Muhammad Azam & Muhammad Aslam & Muhammad Shujaat Navaz, 2020. "Attribute np control charts using resampling systems for monitoring non-conforming items under exponentiated half-logistic distribution," Operations Research and Decisions, Wroclaw University of Science and Technology, Faculty of Management, vol. 30(2), pages 115-143.
    12. Nourelfath, Mustapha & Hassan, Jawad, 2015. "Six Sigma performance for non-normal processesAuthor-Name: Aldowaisan, Tariq," European Journal of Operational Research, Elsevier, vol. 247(3), pages 968-977.
    13. Fernández, Arturo J. & Pérez-González, Carlos J. & Aslam, Muhammad & Jun, Chi-Hyuck, 2011. "Design of progressively censored group sampling plans for Weibull distributions: An optimization problem," European Journal of Operational Research, Elsevier, vol. 211(3), pages 525-532, June.
    14. Lepore, A. & Palumbo, B. & Castagliola, P., 2018. "A note on decision making method for product acceptance based on process capability indices Cpk and Cpmk," European Journal of Operational Research, Elsevier, vol. 267(1), pages 393-398.
    15. Kuen-Suan Chen & Tsun-Hung Huang & Ruey-Chyn Tsaur & Wen-Yang Kao, 2022. "Fuzzy Evaluation Models for Accuracy and Precision Indices," Mathematics, MDPI, vol. 10(21), pages 1-12, October.
    16. Nasrullah Khan & Talat Yasmin & Muhammad Aslam & Chi-Hyuck Jun, 2018. "On the performance of modified EWMA charts using resampling schemes," Operations Research and Decisions, Wroclaw University of Science and Technology, Faculty of Management, vol. 28(3), pages 29-43.
    17. Mustapha Nourelfath & Tariq Aldowaisan & Jawad Hassan, 2016. "Evaluating Six Sigma failure rate for inverse Gaussian cycle times," International Journal of Production Research, Taylor & Francis Journals, vol. 54(20), pages 6092-6101, October.
    18. Sivakumar Devireddy Charana Udaya & Kalyani Kruthiventi & Kanaparthi Rosaiah & Rao Gadde Srinivasa, 2019. "The Odd Generalized Exponential Log-Logistic Distribution Group Acceptance Sampling Plan," Statistics in Transition New Series, Polish Statistical Association, vol. 20(1), pages 103-116, March.
    19. Devireddy Charana Udaya Sivakumar & Rosaiah Kanaparthi & Gadde Srinivasa Rao & Kruthiventi Kalyani, 2019. "The Odd Generalized Exponential Log-Logistic Distribution Group Acceptance Sampling Plan," Statistics in Transition New Series, Polish Statistical Association, vol. 20(1), pages 103-116, March.
    20. Fernández, Arturo J., 2012. "Minimizing the area of a Pareto confidence region," European Journal of Operational Research, Elsevier, vol. 221(1), pages 205-212.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:ejores:v:287:y:2020:i:3:p:964-974. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/eor .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.