IDEAS home Printed from https://ideas.repec.org/a/eee/ejores/v211y2011i3p650-657.html
   My bibliography  Save this article

A semi-Markov model with holdout transshipment policy and phase-type exponential lead time

Author

Listed:
  • Zhang, Jiaqi
  • Archibald, Thomas W.

Abstract

In this paper, a semi-Markov decision model of a two-location inventory system with holdout transshipment policy is reviewed under the assumption of phase-type exponential replenishment lead time rather than exponential lead time. The phase-type exponential lead time more closely approximates fixed lead time as the number of phases increases. Unlike past research in this area which has concentrated on the simple transshipment policies of complete pooling or no pooling, the research presented in this paper endeavors to develop an understanding of a more general class of transshipment policy. In addition, we propose an effective method to approximate the dynamic holdout transshipment policy.

Suggested Citation

  • Zhang, Jiaqi & Archibald, Thomas W., 2011. "A semi-Markov model with holdout transshipment policy and phase-type exponential lead time," European Journal of Operational Research, Elsevier, vol. 211(3), pages 650-657, June.
  • Handle: RePEc:eee:ejores:v:211:y:2011:i:3:p:650-657
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0377-2217(11)00003-8
    Download Restriction: Full text for ScienceDirect subscribers only
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Kutanoglu, Erhan & Mahajan, Mohit, 2009. "An inventory sharing and allocation method for a multi-location service parts logistics network with time-based service levels," European Journal of Operational Research, Elsevier, vol. 194(3), pages 728-742, May.
    2. T. W. Archibald & S. A. E. Sassen & L. C. Thomas, 1997. "An Optimal Policy for a Two Depot Inventory Problem with Stock Transfer," Management Science, INFORMS, vol. 43(2), pages 173-183, February.
    3. Axsater, Sven, 2003. "Evaluation of unidirectional lateral transshipments and substitutions in inventory systems," European Journal of Operational Research, Elsevier, vol. 149(2), pages 438-447, September.
    4. Zou, Li & Dresner, Martin & Windle, Robert, 2010. "A two-location inventory model with transshipments in a competitive environment," International Journal of Production Economics, Elsevier, vol. 125(2), pages 235-250, June.
    5. T W Archibald, 2007. "Modelling replenishment and transshipment decisions in periodic review multilocation inventory systems," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 58(7), pages 948-956, July.
    6. Uday S. Karmarkar, 1987. "The Multilocation Multiperiod Inventory Problem: Bounds and Approximations," Management Science, INFORMS, vol. 33(1), pages 86-94, January.
    7. Sven Axsäter, 1990. "Modelling Emergency Lateral Transshipments in Inventory Systems," Management Science, INFORMS, vol. 36(11), pages 1329-1338, November.
    8. Xinxin Hu & Izak Duenyas & Roman Kapuscinski, 2008. "Optimal Joint Inventory and Transshipment Control Under Uncertain Capacity," Operations Research, INFORMS, vol. 56(4), pages 881-897, August.
    9. Hui Zhao & Jennifer K. Ryan & Vinayak Deshpande, 2008. "Optimal Dynamic Production and Inventory Transshipment Policies for a Two-Location Make-to-Stock System," Operations Research, INFORMS, vol. 56(2), pages 400-410, April.
    10. Seifert, Ralf W. & Thonemann, Ulrich W. & Sieke, Marcel A., 2006. "Integrating direct and indirect sales channels under decentralized decision-making," International Journal of Production Economics, Elsevier, vol. 103(1), pages 209-229, September.
    11. Hau L. Lee, 1987. "A Multi-Echelon Inventory Model for Repairable Items with Emergency Lateral Transshipments," Management Science, INFORMS, vol. 33(10), pages 1302-1316, October.
    12. Jovan Grahovac & Amiya Chakravarty, 2001. "Sharing and Lateral Transshipment of Inventory in a Supply Chain with Expensive Low-Demand Items," Management Science, INFORMS, vol. 47(4), pages 579-594, April.
    13. Olsson, Fredrik, 2010. "An inventory model with unidirectional lateral transshipments," European Journal of Operational Research, Elsevier, vol. 200(3), pages 725-732, February.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Arruda, E.F. & Fragoso, M.D., 2015. "Solving average cost Markov decision processes by means of a two-phase time aggregation algorithm," European Journal of Operational Research, Elsevier, vol. 240(3), pages 697-705.
    2. Barron, Yonit, 2022. "The continuous (S,s,Se) inventory model with dual sourcing and emergency orders," European Journal of Operational Research, Elsevier, vol. 301(1), pages 18-38.
    3. Olsson, Fredrik, 2015. "Emergency lateral transshipments in a two-location inventory system with positive transshipment leadtimes," European Journal of Operational Research, Elsevier, vol. 242(2), pages 424-433.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Paterson, Colin & Kiesmüller, Gudrun & Teunter, Ruud & Glazebrook, Kevin, 2011. "Inventory models with lateral transshipments: A review," European Journal of Operational Research, Elsevier, vol. 210(2), pages 125-136, April.
    2. Tiacci, Lorenzo & Saetta, Stefano, 2011. "Reducing the mean supply delay of spare parts using lateral transshipments policies," International Journal of Production Economics, Elsevier, vol. 133(1), pages 182-191, September.
    3. Satır, Benhür & Savasaneril, Secil & Serin, Yasemin, 2012. "Pooling through lateral transshipments in service parts systems," European Journal of Operational Research, Elsevier, vol. 220(2), pages 370-377.
    4. van Wijk, A.C.C. & Adan, I.J.B.F. & van Houtum, G.J., 2012. "Approximate evaluation of multi-location inventory models with lateral transshipments and hold back levels," European Journal of Operational Research, Elsevier, vol. 218(3), pages 624-635.
    5. van Wijk, A.C.C. & Adan, I.J.B.F. & van Houtum, G.J., 2019. "Optimal lateral transshipment policies for a two location inventory problem with multiple demand classes," European Journal of Operational Research, Elsevier, vol. 272(2), pages 481-495.
    6. Somarin, Aghil Rezaei & Sharma, Pankaj & Tiwari, Sunil & Chen, Songlin, 2023. "Stock reallocation policy for repairable service parts in case of supply disruptions due to extreme weather events," International Journal of Production Economics, Elsevier, vol. 256(C).
    7. Paterson, Colin & Teunter, Ruud & Glazebrook, Kevin, 2012. "Enhanced lateral transshipments in a multi-location inventory system," European Journal of Operational Research, Elsevier, vol. 221(2), pages 317-327.
    8. Zümbül Atan & Lawrence V. Snyder & George R. Wilson, 2018. "Transshipment policies for systems with multiple retailers and two demand classes," OR Spectrum: Quantitative Approaches in Management, Springer;Gesellschaft für Operations Research e.V., vol. 40(1), pages 159-186, January.
    9. Bhatnagar, Rohit & Lin, Bing, 2019. "The joint transshipment and production control policies for multi-location production/inventory systems," European Journal of Operational Research, Elsevier, vol. 275(3), pages 957-970.
    10. Tiacci, Lorenzo & Saetta, Stefano, 2011. "A heuristic for balancing the inventory level of different locations through lateral shipments," International Journal of Production Economics, Elsevier, vol. 131(1), pages 87-95, May.
    11. Guangyuan Yang & Rommert Dekker, 2010. "Service Parts Inventory Control with Lateral Transshipment that takes Time," Tinbergen Institute Discussion Papers 10-025/4, Tinbergen Institute, revised 10 Mar 2010.
    12. Xinxin Hu & Izak Duenyas & Roman Kapuscinski, 2008. "Optimal Joint Inventory and Transshipment Control Under Uncertain Capacity," Operations Research, INFORMS, vol. 56(4), pages 881-897, August.
    13. Kang, Jae-Hun & Kim, Yeong-Dae, 2012. "Inventory control in a two-level supply chain with risk pooling effect," International Journal of Production Economics, Elsevier, vol. 135(1), pages 116-124.
    14. Yang, Guangyuan & Dekker, Rommert & Gabor, Adriana F. & Axsäter, Sven, 2013. "Service parts inventory control with lateral transshipment and pipeline stockflexibility," International Journal of Production Economics, Elsevier, vol. 142(2), pages 278-289.
    15. Meissner, Joern & Senicheva, Olga V., 2018. "Approximate dynamic programming for lateral transshipment problems in multi-location inventory systems," European Journal of Operational Research, Elsevier, vol. 265(1), pages 49-64.
    16. Wong, H. & van Houtum, G.J. & Cattrysse, D. & Oudheusden, D. Van, 2006. "Multi-item spare parts systems with lateral transshipments and waiting time constraints," European Journal of Operational Research, Elsevier, vol. 171(3), pages 1071-1093, June.
    17. Xu, Kefeng & Evers, Philip T. & Fu, Michael C., 2003. "Estimating customer service in a two-location continuous review inventory model with emergency transshipments," European Journal of Operational Research, Elsevier, vol. 145(3), pages 569-584, March.
    18. Tang, Shao-Long & Yan, Hong, 2010. "Pre-distribution vs. post-distribution for cross-docking with transshipments," Omega, Elsevier, vol. 38(3-4), pages 192-202, June.
    19. Ying Rong & Lawrence V. Snyder & Yang Sun, 2010. "Inventory sharing under decentralized preventive transshipments," Naval Research Logistics (NRL), John Wiley & Sons, vol. 57(6), pages 540-562, September.
    20. Dhahri, Akrem & Gharbi, Ali & Ouhimmou, Mustapha, 2022. "Integrated production-transshipment control policy for a two-location unreliable manufacturing system," International Journal of Production Economics, Elsevier, vol. 247(C).

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:ejores:v:211:y:2011:i:3:p:650-657. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/eor .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.