IDEAS home Printed from https://ideas.repec.org/a/eee/ejores/v158y2004i3p577-594.html
   My bibliography  Save this article

The scheduling problem of PCBs for multiple non-identical parallel machines

Author

Listed:
  • Van Hop, Nguyen
  • Nagarur, Nagendra N.

Abstract

No abstract is available for this item.

Suggested Citation

  • Van Hop, Nguyen & Nagarur, Nagendra N., 2004. "The scheduling problem of PCBs for multiple non-identical parallel machines," European Journal of Operational Research, Elsevier, vol. 158(3), pages 577-594, November.
  • Handle: RePEc:eee:ejores:v:158:y:2004:i:3:p:577-594
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0377-2217(03)00376-X
    Download Restriction: Full text for ScienceDirect subscribers only
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Djellab, Housni & Djellab, Khaled & Gourgand, Michel, 2000. "A new heuristic based on a hypergraph representation for the tool switching problem," International Journal of Production Economics, Elsevier, vol. 64(1-3), pages 165-176, March.
    2. Ronald G. Askin & Moshe Dror & Asoo J. Vakharia, 1994. "Printed circuit board family grouping and component allocation for a multimachine, open‐shop assembly cell," Naval Research Logistics (NRL), John Wiley & Sons, vol. 41(5), pages 587-608, August.
    3. Christopher S. Tang & Eric V. Denardo, 1988. "Models Arising from a Flexible Manufacturing Machine, Part I: Minimization of the Number of Tool Switches," Operations Research, INFORMS, vol. 36(5), pages 767-777, October.
    4. Luzzatto, Dino & Perona, Marco, 1993. "Cell formation in PCB assembly based on production quantitative data," European Journal of Operational Research, Elsevier, vol. 69(3), pages 312-329, September.
    5. Gronalt, M. & Grunow, M. & Gunther, H. O. & Zeller, R., 1997. "A heuristic for component switching on SMT placement machines," International Journal of Production Economics, Elsevier, vol. 53(2), pages 181-190, November.
    6. Matzliach, Barouch & Tzur, Michal, 2000. "Storage management of items in two levels of availability," European Journal of Operational Research, Elsevier, vol. 121(2), pages 363-379, March.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Allahverdi, Ali & Ng, C.T. & Cheng, T.C.E. & Kovalyov, Mikhail Y., 2008. "A survey of scheduling problems with setup times or costs," European Journal of Operational Research, Elsevier, vol. 187(3), pages 985-1032, June.
    2. Calmels, Dorothea, 2022. "An iterated local search procedure for the job sequencing and tool switching problem with non-identical parallel machines," European Journal of Operational Research, Elsevier, vol. 297(1), pages 66-85.
    3. Soares, Leonardo Cabral R. & Carvalho, Marco Antonio M., 2020. "Biased random-key genetic algorithm for scheduling identical parallel machines with tooling constraints," European Journal of Operational Research, Elsevier, vol. 285(3), pages 955-964.
    4. Beezão, Andreza Cristina & Cordeau, Jean-François & Laporte, Gilbert & Yanasse, Horacio Hideki, 2017. "Scheduling identical parallel machines with tooling constraints," European Journal of Operational Research, Elsevier, vol. 257(3), pages 834-844.
    5. Choudhury, Nilanjan D. & Wilhelm, Wilbert E. & Rao, Brijesh & Gott, Jonathan & Khotekar, Nikhilesh, 2007. "Process planning for circuit card assembly on a series of dual head placement machines," European Journal of Operational Research, Elsevier, vol. 182(2), pages 626-639, October.
    6. Yazdani Sabouni, M.T. & Logendran, Rasaratnam, 2013. "Carryover sequence-dependent group scheduling with the integration of internal and external setup times," European Journal of Operational Research, Elsevier, vol. 224(1), pages 8-22.
    7. Dang, Quang-Vinh & van Diessen, Thijs & Martagan, Tugce & Adan, Ivo, 2021. "A matheuristic for parallel machine scheduling with tool replacements," European Journal of Operational Research, Elsevier, vol. 291(2), pages 640-660.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Hirvikorpi, Mika & Salonen, Kari & Knuutila, Timo & Nevalainen, Olli S., 2006. "The general two-level storage management problem: A reconsideration of the KTNS-rule," European Journal of Operational Research, Elsevier, vol. 171(1), pages 189-207, May.
    2. Raduly-Baka, Csaba & Nevalainen, Olli S., 2015. "The modular tool switching problem," European Journal of Operational Research, Elsevier, vol. 242(1), pages 100-106.
    3. Crama, Yves & Moonen, Linda S. & Spieksma, Frits C.R. & Talloen, Ellen, 2007. "The tool switching problem revisited," European Journal of Operational Research, Elsevier, vol. 182(2), pages 952-957, October.
    4. Calmels, Dorothea, 2022. "An iterated local search procedure for the job sequencing and tool switching problem with non-identical parallel machines," European Journal of Operational Research, Elsevier, vol. 297(1), pages 66-85.
    5. Dang, Quang-Vinh & van Diessen, Thijs & Martagan, Tugce & Adan, Ivo, 2021. "A matheuristic for parallel machine scheduling with tool replacements," European Journal of Operational Research, Elsevier, vol. 291(2), pages 640-660.
    6. Klomp, Cornelis & van de Klundert, Joris & Spieksma, Frits C. R. & Voogt, Siem, 2000. "The feeder rack assignment problem in PCB assembly: A case study," International Journal of Production Economics, Elsevier, vol. 64(1-3), pages 399-407, March.
    7. Crama, Yves & Flippo, Olaf E. & van de Klundert, Joris & Spieksma, Frits C. R., 1997. "The assembly of printed circuit boards: A case with multiple machines and multiple board types," European Journal of Operational Research, Elsevier, vol. 98(3), pages 457-472, May.
    8. Yves Crama & Joris van de Klundert, 1999. "Worst‐case performance of approximation algorithms for tool management problems," Naval Research Logistics (NRL), John Wiley & Sons, vol. 46(5), pages 445-462, August.
    9. Marc Peeters & Zeger Degraeve, 2004. "The Co-Printing Problem: A Packing Problem with a Color Constraint," Operations Research, INFORMS, vol. 52(4), pages 623-638, August.
    10. Yazdani Sabouni, M.T. & Logendran, Rasaratnam, 2013. "Carryover sequence-dependent group scheduling with the integration of internal and external setup times," European Journal of Operational Research, Elsevier, vol. 224(1), pages 8-22.
    11. Croci, F. & Perona, M. & Pozzetti, A., 2000. "Work-force management in automated assembly systems," International Journal of Production Economics, Elsevier, vol. 64(1-3), pages 243-255, March.
    12. Christopher S. Tang, 2017. "OM Forum—Three Simple Approaches for Young Scholars to Identify Relevant and Novel Research Topics in Operations Management," Manufacturing & Service Operations Management, INFORMS, vol. 19(3), pages 338-346, July.
    13. Nagraj Balakrishnan & Amiya K. Chakravarty, 2001. "Opportunistic retooling of a flexible machine subject to failure," Naval Research Logistics (NRL), John Wiley & Sons, vol. 48(1), pages 79-97, February.
    14. Daniels, Richard L. & Rummel, Jeffrey L. & Schantz, Robert, 1998. "A model for warehouse order picking," European Journal of Operational Research, Elsevier, vol. 105(1), pages 1-17, February.
    15. E Duman, 2007. "Modelling the operations of a component placement machine with rotational turret and stationary component magazine," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 58(3), pages 317-325, March.
    16. Choudhury, Nilanjan D. & Wilhelm, Wilbert E. & Rao, Brijesh & Gott, Jonathan & Khotekar, Nikhilesh, 2007. "Process planning for circuit card assembly on a series of dual head placement machines," European Journal of Operational Research, Elsevier, vol. 182(2), pages 626-639, October.
    17. Chakravarty, Amiya K. & Balakrishnan, Nagraj, 1997. "Job sequencing rules for minimizing the expected makespan in flexible machines," European Journal of Operational Research, Elsevier, vol. 96(2), pages 274-288, January.
    18. Matzliach, Barouch & Tzur, Michal, 2000. "Storage management of items in two levels of availability," European Journal of Operational Research, Elsevier, vol. 121(2), pages 363-379, March.
    19. Ciavotta, Michele & Detti, Paolo & Meloni, Carlo & Pranzo, Marco, 2008. "A bi-objective coordination setup problem in a two-stage production system," European Journal of Operational Research, Elsevier, vol. 189(3), pages 734-745, September.
    20. M. Selim Akturk & Jay B. Ghosh & Evrim D. Gunes, 2003. "Scheduling with tool changes to minimize total completion time: A study of heuristics and their performance," Naval Research Logistics (NRL), John Wiley & Sons, vol. 50(1), pages 15-30, February.

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:ejores:v:158:y:2004:i:3:p:577-594. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/eor .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.