Content
2021, Volume 19, Issue 2
- 220-246 Selection of a phase change material by using the multi-criteria selection method for use in an automotive thermal insulation system
by Andres Mendez & Javier Martínez-Gómez & Nicolalde Juan Francisco - 247-268 Optimising a fuzzy multi-objective inventory model under different solution method
by R.H. Waliv
2021, Volume 19, Issue 1
- 1-18 Optimality and suboptimality criteria in a quadratic problem of optimal control with a piecewise linear entry
by Fouzia Ghellab & Mohand Ouamer Bibi - 19-44 Transient behaviour of a Markovian vacation queue with re-service balking control of admission closedown and setup times
by A. Azhagappan & T. Deepa - 45-64 Variant working vacation Markovian queue with second optional service, unreliable server and retention of reneged customers
by Vijaya Laxmi Pikkala & Girija Bhavani Edadasari - 65-84 A seller-buyer supply chain model with fixed and variable labour capacity along with advertising cost and demand
by Sandipa Bhattacharya & Seema Sarkar Mondal - 85-103 Economic order quantity models for the remanufacturing industry with imperfect process, two-state Markovian and two types of inventory
by Muhammad Al-Salamah - 104-128 Analysis of fuzzy inventory model for Gompertz deteriorating items with linear demand and shortages
by K. Senbagam & M. Kokilamani
2021, Volume 18, Issue 4
- 433-443 Unilateral 2D Markov-switching autoregressive model
by Houria Djafri & Soumia Kharfouchi - 444-464 A two-vehicle two-stage solid transportation problem with bi-fuzzy coefficients through genetic algorithm
by Dipak Barman & Anjana Kuiri & Barun Das - 465-483 On sufficiency and duality for semi-infinite multiobjective optimisation problems involving V-invexity
by Pushkar Jaisawal & Tadeusz Antczak & Vivek Laha - 484-502 Solving the joint production distribution problem by the variable neighbourhood search algorithm
by Nejah Ben Mabrouk & Bassem Jarboui & Mansour Eddaly - 503-527 An integrated approach of adaptive neuro-fuzzy inference system and dynamic data envelopment analysis for supplier selection
by Mohsen Shafiei Nikabadi & Hossein Fallah Moghaddam - 528-544 On a two-server reliability system with one-server idle below a threshold
by P.V. Ushakumari - 545-565 Locust swarm optimisation for the permutation flow shop scheduling problem
by Mohanad Al-Behadili & Huda Zaki & Khaldoun Al-Yasiri
2021, Volume 18, Issue 3
- 289-309 Fractile criterion iterative-interactive optimisation process for multi-objective stochastic linear programming problems in fuzzy environment
by Arindam Garai - 310-335 On solving linear programming problem by duality approach in neutrosophic environment
by Tuhin Bera & Nirmal Kumar Mahapatra - 336-359 Multi-period mean-variance portfolio selection in a regime-switching market with a bankruptcy state and a state-dependent uncertain exit-time
by Reza Keykhaei - 360-383 Solving the one-dimensional cutting stock problem under discrete, uncertain, time-varying demands using a hybrid of special-purpose Benders' decomposition and column generation
by Aphisak Witthayapraphakorn & Sasarose Jaijit & Peerayuth Charnsethikul - 384-403 Numerical study on transient behaviour of finite bulk arrival or service queues with multiple working vacations
by Rajesh Kumar & Souvik Ghosh & Abhijit Datta Banik - 404-432 Random machine breakdown and stochastic corrective maintenance period on a production inventory system with safe period
by Subhankar Adhikari & Brojeswar Pal
2021, Volume 18, Issue 2
- 145-153 A software reliability growth model considering testing coverage subject to field environment
by Sulekha Rani & Priyanka Agarwal & Madhu Jain & Rahul Solanki - 154-168 Energy analysis of adobe performance as a housing construction material in Ecuador
by Luis Felipe Godoy Vaca & Javier Martínez Gómez & Mario Fernando Bustamante Crespo & A. Jonathan Riofrio Trujillo - 169-186 Algorithmic approach to time-cost analysis of queued commodity flowing through critical path
by Prem Prakash Mishra & T. Poongodi & S.K. Yadav & S.S. Mishra - 187-209 Multi-criteria decision making for lower bumper stiffener material change in a sports utility vehicle with CAE simulation
by Andrés Villarruel-Jaramillo & Juan Carlos Rocha-Hoyos & Edilberto Antonio Llanes Cedeño & Javier Martínez-Gómez - 210-235 Optimal 3-dimensional search model to find the underwater randomly hidden target
by Mohamed Abd Allah El-Hadidy & M. Fakharany - 236-253 Solving multi-objective chance constrained programming problem involving three parameters log normal distribution
by Srikumar Acharya & Berhanu Belay & Rajashree Mishra - 254-263 Multiplicative determination of priority weights in a fuzzy analytic hierarchy process
by Tanja Van Hecke - 264-287 Refined descriptive sample inference in the estimation of the cumulative distribution function
by Oualid Saci & Megdouda Ourbih-Tari
2021, Volume 18, Issue 1
- 1-20 Hermite Hadamard and Fejer type integral inequalities for harmonic convex (concave) fuzzy mappings
by Minakshi Parida & Sunita Chand - 21-44 Fuzzy facility location problem with point and rectangular destinations
by Nemat Allah Taghi-Nezhad & Sadjad Moradi & Gholamreza Karamali - 45-70 Activity couple with interdependent durations: serial, parallel or partly overlapping scheduling?
by Gregory Gurevich & Baruch Keren & Zohar Laslo - 71-84 Multi-step crossover genetic algorithm for bi-criteria parallel machine scheduling problems
by Sameer Sharma & Mehak Chadha & Harpreet Kaur - 85-114 New family of estimators for population mean using regression-cum-ratio exponential estimators
by S.K. Yadav & Cem Kadilar & Dinesh K. Sharma - 115-125 Symbiotic organisms search algorithm based model reduction of higher order continuous systems
by S.P. Singh & Varsha Singh & V.P. Singh - 126-144 A multi-objective model to allocate multiple facilities at proposed locations in the multi-floor organisation, using an improved genetic algorithm. Case study: Isfahan Governorate
by Mehdi Safaei & Meisam Nasrollahi
2020, Volume 17, Issue 4
- 437-466 Performance prediction and ANFIS computing for unreliable retrial queue with delayed repair under modified vacation policy
by Shweta Upadhyaya & Chetna Kushwaha - 467-491 Towards a performance analysis of composite web services using Petri nets
by Nassima Bernine & Hassina Nacer & Djamil Aissani & Hassane Alla - 492-513 Hybrid adaptive memory programming to optimise the multi-commodity many to many vehicle routing problem
by Jalel Euchi - 514-551 An inventory model for deteriorating items with preservation facility of ramp type demand and trade credit
by Ali Akbar Shaikh & Gobinda Chandra Panda & Md. Al-Amin Khan & Abu Hashan Md. Mashud & Amiya Biswas - 552-571 Solving generalised intuitionistic fuzzy 1-median problem on tree networks with a new ranking method
by Akram Soltanpour & Fahimeh Baroughi & Behrooz Alizadeh
2020, Volume 17, Issue 3
- 301-317 Modelling and analysis of a discrete-time GI X / Geom /1/ K queue with N threshold policy
by K. Sikdar - 318-332 Chaos in a fractional-order financial system
by A.A. Khajehnasiri & M. Afshar Kermani & R. Ezzati - 333-352 Multifactor modelling in asset management
by Tolulope Latunde - 353-370 Order six generalised hybrid block method for the solution of third order initial value problems
by Ra'ft Abdelrahim - 371-390 Transient behaviour of an M / E k /1 queue with vacations, balking and control of admission during vacations
by T. Deepa & A. Azhagappan - 391-423 The supplier-retailer optimal replenishment decisions under a two-level trade credit model with shortage for deteriorating items
by Zohreh Molamohamadi & Napsiah Ismail & Zulkiffle Leman & Norzima Zulkifli & Anvarjon Ahmedov - 424-435 Batch arrival Poisson queue with breakdown and repairs
by Balasubramanian Sundar Rajan & V. Ganesan & Samikannu Rita
2020, Volume 17, Issue 2
- 153-169 Maximal covering salesman problems with average travelling cost constrains
by Mostafa Dastmardi & Mohammad Mohammadi & Bahman Naderi - 170-185 Intelligent sensor impact on predictive maintenance program costs
by Soukaina Sadiki & Maurizio Faccio & Mohamed Ramadany & Driss Amegouz & Said Boutahari - 186-198 On the numerical solution of an inverse spectral problem with a singular potential
by Seyfollah Mosazadeh & Abdolali Neamaty & Maedeh Bagherzadeh - 199-232 Keynesian resurgence: financial stimulus and contingent claims modelling
by Ephraim Clark & Sovan Mitra & Octave Jokung - 233-252 An EPQ model for delayed deteriorating items with reliability consideration and quadratic demand
by Sani Dari & Babangida Sani - 253-277 Desert sparrow optimisation algorithm for permutation flowshop scheduling problems
by Meenakshi Sharma & Manisha Sharma & Sameer Sharma - 278-299 Manufacturing procurement cost allocation as dominant factor under limited available manufacturing equipment budget
by Basil Olufemi Akinnuli & Peter Kayode Farayibi & Oluwaseun Oluwagbemiga Ojo
2020, Volume 17, Issue 1
- 1-29 Stability of the optimal distribution for the searching effort to find the Markovian targets by using fuzzy maximum discounted effort reward search: case of the cooperative search techniques
by Alaa Awad Alzulaibani - 30-49 A prospective multi-attribute decision making-based reliability allocation method using fuzzy linguistic approach and minimum effort function
by Aniruddha Samanta & Kajla Basu - 50-77 A dynamic DEA model for resource allocation
by Saeid Ghobadi - 78-89 Searching for multiple equivalent predictors from oral squamous cell carcinoma dataset using statistically equivalent signature algorithm
by Utkarsh Mahadeo Khaire & R. Dhanalakshmi - 90-109 Material selection through of multi-criteria decisions methods applied to a helical gearbox
by Chrystopher Vaca Terán & Javier Martínez-Gómez & Julio César Leguísamo Milla - 110-152 Modularising school timetabling problems in different types of classes for Taiwanese elementary and junior high schools
by Ping-Shun Chen & Wen-Tso Huang & Nai-Chun Peng & Gary Yu-Hsin Chen
2020, Volume 16, Issue 4
- 455-468 Mathematical modelling and performance analysis of single server queuing system - eigenspectrum
by E. Mamatha & S. Saritha & C.S. Reddy & P. Rajadurai - 469-479 Analysis of parameter selection for solar radiation prediction and global solar radiation prediction model using polynomial regression
by Prakash Marimuthu & P. Chinnamuthu & R. Jeyapaul - 480-498 Analysis of non-pre-emptive priority retrial queueing system with two-way communication, Bernoulli vacation, collisions, working breakdown, immediate feedback and reneging
by G. Ayyappan & J. Udayageetha & B. Somasundaram - 499-514 Reliability analysis of different systems using triangular multi-fuzzy sets estimated by statistical data
by E. El-Ghamry & M. El-Damsece & M. Shokry - 515-550 Optimal service rates of a perishable inventory system with service facility
by N. Sangeetha & B. Sivakumar
2020, Volume 16, Issue 3
- 291-315 Analysis of a bulk service queue with unreliable server, multiple vacation, overloading and stand-by server
by G. Ayyappan & S. Karpagam - 316-353 Holistically addressing uncertainty in group decision-making: the case of a 'quasi-collaborative' group structure
by Lanndon A. Ocampo & Eppie E. Clark & Anthony S.F. Chiu & Raymond R. Tan - 354-375 Analysing interval and multi-choice bi-level programming for Stackelberg game using intuitionistic fuzzy programming
by Sumit Kumar Maiti & Sankar Kumar Roy - 376-406 A decentralised multi-objective sustainable supply chain model under intuitionistic fuzzy environment
by Murshid Kamal & Srikant Gupta & Irfan Ali - 407-434 On the distribution of an infinite-buffer queueing system with versatile bulk-service rule under batch-size-dependent service policy: M / G n ( a , Y ) /1
by Sourav Pradhan - 435-454 Comparison of two modified meta-heuristic soft algorithms for solving a bi-objective facility layout problem
by Amir Abbas Shojaie & Seyed Esmail Seyedi Bariran
2020, Volume 16, Issue 2
- 139-158 Selection of materials by multi-criteria methods applied to the side of a self-supporting structure for light vehicles
by Rodger Benjamín Salazar Loor & Javier Martínez-Gómez & Juan Carlos Rocha-Hoyos & Edilberto Antonio LLanes Cedeño - 159-178 A hybrid direction algorithm for solving a convex quadratic problem
by Mohand Ouamer Bibi & Nacira Ikheneche & Mohand Bentobache - 179-201 New class of estimators of the population mean using the known population median of the study variable
by S.K. Yadav & Dinesh K. Sharma & Kate Brown - 202-216 Evaluation of the branches of Iran Insurance Corporation based on data envelopment analysis-free disposal hull in the presence of weight restrictions
by Hossein Safari & Abdol Hossein Jafarzadeh & Mohammad Reza Fathi - 217-237 Transient analysis of multi-server Markovian queueing system with synchronous multiple working vacations and impatience of customers
by P. Vijaya Laxmi & T. Wondewosen Kassahun - 238-256 Multi-objective mathematical model for the redesign of supply chains considering financial criteria optimisation and scenarios
by John Willmer Escobar & Andres Arroyo Marin & Juan David Lince - 257-278 A robust bi-objective programming approach to environmental closed-loop supply chain network design under uncertainty
by Zahra Homayouni & Mir Saman Pishvaee - 279-289 Sion's minimax theorem and Nash equilibrium of symmetric three-players zero-sum game
by Atsuhiro Satoh & Yasuhito Tanaka
2020, Volume 16, Issue 1
- 1-23 Numerical methods for first order uncertain stochastic differential equations
by Justin Chirima & Eriyoti Chikodza & Senelani Dorothy Hove-Musekwa - 24-52 Material selection using multi-criteria decision making methods for geomembranes
by Cristhian Chingo & Javier Martínez-Gómez & Ricardo A. Narváez C. - 53-81 An M [ X ] / G ( a , b )/1 queue with unreliable server, second optional service, closedown, setup with N-policy and multiple vacation
by G. Ayyappan & M. Nirmala - 82-97 Transient solution of an M/M/∞ queue with system's additional tasks and impatient customers
by R. Sudhesh & A. Azhagappan - 98-117 Data analytics for relative ranking of factors to optimise blood bank supply chain
by J. Arul Valan & E. Baburaj & P. Parthiban - 118-137 An application of bilevel optimisation to the waste collection centres location problem
by Massimiliano Caramia & Mattia Dalla Costa
2019, Volume 15, Issue 4
- 395-416 Optimisation of multi-objective commercial bank balance sheet management model: a parametric T-set approach
by Arindam Garai & Bappa Mondal & Tapan Kumar Roy - 417-433 Monohull ship hydrodynamic simulation using CFD
by Paúl Sebastián Dávila Aldás & Jessica Constante & Gabriela Chávez Tapia & Javier Martínez-Gómez - 434-445 An effective algorithm to solve cost minimising transportation problem
by S.M. Abul Kalam Azad & M. Kamrul Hasan - 446-463 Multi-release software reliability growth assessment: an approach incorporating fault reduction factor and imperfect debugging
by Anu Gupta Aggarwal & Neha Gandhi & Vibha Verma & Abhishek Tandon - 464-497 On differentiable harmonic univex fuzzy mappings and its applications to fuzzy mathematical programming problem
by Minakshi Parida & Sunita Chand - 498-539 Solid transportation problem under fully fuzzy environment
by Abhijit Baidya & Uttam Kumar Bera
2019, Volume 15, Issue 3
- 265-295 MAP/PH (1), PH (2)/2 finite retrial inventory system with service facility, multiple vacations for servers
by C. Suganya & B. Sivakumar - 296-309 A new approach for solving fully fuzzy linear programming problem
by Sapan Kumar Das & T. Mandal & Diptiranjan Behera - 310-337 A boundary-point LP solution method and its application to dense linear programs
by Chanaka Edirisinghe & William Ziemba - 338-363 The efficiency of greedy best response algorithm in road traffic assignment
by Lahna Idres & Mohammed Said Radjef - 364-371 A new ranking technique on heptagonal fuzzy numbers to solve fuzzy transportation problem
by P. Malini - 372-394 Using a multi-criteria decision making approach to select the optimal freeway rout (case study: Isfahan-Shiraz Freeway)
by Jalil Heidary Dahooie & Navid Mohammadi & Amir Salar Vanaki
2019, Volume 15, Issue 2
- 137-155 A study on M X / G ( a , b )/ 1 queue with server breakdown without interruption and controllable arrivals during multiple adaptive vacations
by S. Jeyakumar & E. Rameshkumar - 156-180 Modelling and analysis of two-unit hot standby database system with random inspection of standby unit
by Amit Manocha & Gulshan Taneja & Sukhvir Singh & Rahul Rishi - 181-196 A modified two-step method for solving interval linear programming problems
by Mehdi Allahdadi - 197-210 A hybrid metaheuristics approach for a multi-depot vehicle routing problem with simultaneous deliveries and pickups
by Sonu Rajak & P. Parthiban & R. Dhanalakshmi - 211-241 Generalised linear search plan for a D-dimensional random walk target
by Mohamed Abd Allah El-Hadidy - 242-264 Effects of product reliability dependent demand in an EPQ model considering partially imperfect production
by Barun Khara & Jayanta Kumar Dey & Shyamal Kumar Mondal
2019, Volume 15, Issue 1
- 1-25 Analysis of batch arrival bulk service queue with additional optional service multiple vacation and setup time
by G. Ayyappan & T. Deepa - 26-32 Comments on the 'polynomial formulation and heuristic-based approach for the k-travelling repairman problem'
by İmdat Kara & Bahar Y. Kara - 33-54 Solution of fuzzy multi objective generalised assignment problem
by Supriya Kar & Aniruddha Samanta & Kajla Basu - 55-64 A cryptosystem based on chaotic maps and factoring problems
by Nedal Tahat & Eddie Shahril Ismail & Ashraf H. Aljammal - 65-91 A matheuristic approach for the split delivery vehicle routing problem: an efficient set covering-based model with guided route generation schemes
by Nurul Huda Mohamed & Said Salhi & Gábor Nagy & Nurul Akmal Mohamed - 92-109 Exact stationary solution for a fluid queue driven by an M/M/ 1 queue with disaster and subsequent repair
by K.V. Vijayashree & A. Anjuka - 110-126 Inventory model for deteriorating items with incremental holding cost under partial backlogging
by Sanjay Singh & Seema Sharma & S.R. Singh - 127-136 Minimising vehicle distribution duration considering service priority
by Dimitra Alexiou
2019, Volume 14, Issue 4
- 451-472 Evaluating fuzzy risk based on a new method of ranking fuzzy numbers using centroid of centroids
by Phani Bushan Rao Peddi - 473-494 Design optimisation of cost of the pressure vessel through MATLAB and simulation through ANSYS
by S. Elizabeth Amudhini Stephen & D. Christu Nesam David & A. Joe Ajay - 495-516 Geolocation of electric bikes recharging stations: City of Quito study case
by Geovanna Villacreses & Javier Martínez-Gómez & Paola Quintana & Ricardo A. Narváez C. - 517-540 Analysis of bulk queue with additional optional service, vacation and unreliable server
by Charan Jeet Singh & Sandeep Kaur & Madhu Jain - 541-567 Resource portfolio problem under relaxed resource dedication policy in multi-mode multi-project scheduling
by Umut Beşikçi & Ümit Bilge & Gündüz Ulusoy - 568-589 On phase type arithmetico-geometric process and its application to deteriorating systems with warranty
by Y. Sarada & R. Shenbagam - 590-599 Parameter estimation for partially observed linear stochastic system
by Chao Wei
2019, Volume 14, Issue 3
- 307-318 Use of a sine cosine algorithm combined with Simpson method for numerical integration
by Mohamed Abdel-Baset & Yongquan Zhou & Ibrahim Hezam - 319-337 Steady state analysis of system size-based balking in M / M b /1 queue
by G.K. Gupta & A. Banerjee - 338-358 An EPQ model in the perspective of carbon emission reduction
by Sudipta Sinha & Nikunja Mohan Modak - 359-376 Single-vendor multi-buyer integrated inventory system for multi-item
by R. Uthayakumar & M. Ganesh Kumar - 377-388 An inventory model for deteriorating items with time and price dependent demand and shortages under the effect of inflation
by Sumit Saha & Nabendu Sen - 389-406 Ensure optimum profit using linear programming a product-mix of textile manufacturing companies
by Gera Workie Woubante & Abebaw Bizuneh Alemu & Senait Asmelash Gebrehiwot - 407-432 A class of always pooling shrinkage testimators for the Weibull model
by Zuhair A. Al-Hemyari & H.A. Al-Dabag & Ali Al-Humairi - 433-450 New model for improving discrimination power in DEA based on dispersion of weights
by Ali Ebrahimnejad & Shokrollah Ziari
2019, Volume 14, Issue 2
- 157-188 A two-level supply chain model with trade credit and imperfect production process
by R. Udayakumar & K.V. Geetha - 189-220 Large deviations for the overflow level of G / G /1 queues in series
by Karol Rosen - 221-235 An M [ X ] / G ( a , b )/1 queueing system with server breakdown and repair, stand-by server and single vacation
by G. Ayyappan & S. Karpagam - 236-267 Prioritising vulnerabilities using ANP and evaluating their optimal discovery and patch release time
by Yogita Kansal & P.K. Kapur & Uday Kumar & Deepak Kumar - 268-289 Robust and stable flexible job shop scheduling with random machine breakdowns: multi-objectives genetic algorithm approach
by Seyed Mojtaba Sajadi & Azar Alizadeh & Mostafa Zandieh & Fereshteh Tavan - 290-305 Production inventory model of deteriorating items with holding cost, stock, and selling price with backlog
by Dharamender Singh
2019, Volume 14, Issue 1
- 1-14 A new short-term energy price forecasting method based on wavelet neural network
by Farshid Keynia & Azim Heydari - 15-29 Second order duality for variational problem via efficiency of higher order
by Promila Kumar & Bharti Sharma - 30-52 Joint replenishment model of both-ways and one-way substitution among products in fixed time horizon
by Raghu Nandan Giri & Shyamal Kumar Mondal & Manoranjan Maiti - 53-81 Developing an integrated decision making model in supply chain under demand uncertainty using genetic algorithm and network data envelopment analysis
by Sara Nakhjirkan & Farimah Mokhatab Rafiei & Ali Husseinzadeh Kashan - 82-105 A new optimal multi-product ( Q , R , SS ) policy with multivariate Markov stochastic demand forecasting model
by Jie Chen & Zhixiang Chen - 106-122 Optimal strategy for an inventory model based on agile manufacturing under imperfect production process
by Himani Dem & S.R. Singh & Leena Parasher - 123-145 A fuzzy rough integrated multi-stage supply chain inventory model with carbon emissions under inflation and time-value of money
by Soumita Kundu & Tripti Chakrabarti - 146-155 Work planning optimisation in ports: a simplex application
by Iñigo L. Ansorena
2018, Volume 13, Issue 4
- 419-449 N-policy for redundant repairable system with multiple types of warm standbys with switching failure and vacation
by Madhu Jain & Ritu Gupta - 450-470 Numerical approach to the uniqueness solution of Von-Karman evolution
by Jaouad Oudaani - 471-491 A unified approach for optimal release, patching and testing time of a software
by P.K. Kapur & Ompal Singh & A.K. Shrivastava - 492-512 A forward with backward inventory policy algorithm for nonlinear increasing demand and shortage backorders
by Ririn Diar Astanti & Huynh Trung Luong & Hui Ming Wee & The Jin Ai - 513-532 Measuring the productivity changes with double frontiers data envelopment analysis for two-stage processes
by Ali Mohtashami & Alireza Alinezhad & Mohammad Javad Nasiri Sadeghloo - 533-547 Promotional effort and quality sensitive two echelon production inventory model with partial backlogging
by Brojeswar Pal & Asoke Kumar Bhunia & Kripasindhu Chaudhuri
2018, Volume 13, Issue 3
- 281-302 On optimisation over the integer efficient set in fuzzy linear multicriteria programming
by Ouiza Zerdani & Farida Achemine - 303-319 Partial backlogging EOQ model with trade-credit facility and inflationary environment
by Rahul Goel - 320-331 An application of multi-layered fuzzy attributed rough set in studying organisational culture system
by B. Praba & G. Gomathi & Vijaya Mani & M. Vageesh - 332-349 Multi-objective optimisation using genetic algorithm based clustering for multi-depot heterogeneous fleet vehicle routing problem with time windows
by Lahcene Guezouli & Samir Abdelhamid - 350-364 Designing an open-loop supply chain network for recyclable products: a case study
by Shiva Zandkarimkhani & Mohammad Mahdi Nasiri & Jafar Heydari - 365-376 Generate random variates using a newly introduced approximation to cumulative density of lower truncated normal distribution for simulation applications
by Mohammad M. Hamasha - 377-400 Equilibrium behavioural strategies in an M / M /1 queue
by Sofiane Ziani & Fazia Rahmoune & Mohammed Said Radjef - 401-417 A model for supplier evaluation and selection based on integrated interval-valued intuitionistic fuzzy AHP-TOPSIS approach
by Hossein Sayyadi Tooranloo & Arezoo Sadat Ayatollah & Asiyeh Iranpour
2018, Volume 13, Issue 2
- 141-177 Efficient near-optimal procedures for some inventory models with backorders-lost sales mixture and controllable lead time, under continuous or periodic review
by Marcello Braglia & Davide Castellano & Dongping Song - 178-201 A model for continuously degrading systems with outsourcing maintenance service
by Allen H. Tai - 202-218 Proposing a new mathematical model and a meta-heuristic algorithm for scheduling and allocating automated guided vehicle
by Mohammad Mehdi Tavakoli & Seyed Mojtaba Sajadi & Seyed Ali Sadeghi Aghili - 219-242 On the multiserver retrial queues with negative arrivals
by Zidani Nesrine & Djellab Natalia - 243-268 An imprecise-inventory model with PEND and SEND policy
by Dipak Barman & Barun Das - 269-279 Finding the shortest path by Adhwarjee's algorithm and comparison of this powerful method with Dijkstra's algorithm
by Dilip Kumar Adhwarjee
2018, Volume 13, Issue 1
- 1-29 Material selection for multi-tubular fixed bed reactor Fischer-Tropsch reactor
by Javier Martínez-Gómez & Ricardo A. Narváez C. - 30-46 An interior-point algorithm for horizontal linear complementarity problems
by Soodabeh Asadi & Hossein Mansouri & Maryam Zangiabadi - 47-60 A hierarchical cellular manufacturing system
by Seyed Hojat Pakzad-Moghaddam & Farhad Salehian & Seyed Esa Hosseini & Hassan Mina - 61-78 A two-phase heuristic for set covering
by Salim Haddadi & Meryem Cheraitia & Abdellah Salhi - 79-90 New generalised mixed vector variational-like inequalities with semi- η -pseudomonotonicity
by Prashanta Majee & Chandal Nahak - 91-106 Comparison between linear programming and integer linear programming: a review
by Mei Lee Sam & Adi Saptari & Mohd Rizal Bin Salleh & Effendi Mohamad - 107-127 Multi-objective unbalanced assignment problem with restriction of jobs to agents via NSGA-II
by Amiya Biswas & Asoke Kumar Bhunia & Ali Akbar Shaikh - 128-139 Evaluation of reordering time in a manufacturing inventory division
by C.D. Nandakumar & S. Srinivasan & R. Sathiyamoorthi
2018, Volume 12, Issue 4
- 423-437 An EOQ inventory model for deteriorating items with time-dependent deterioration rate, ramp-type demand rate and shortages
by Trailokyanath Singh & Pandit Jagatananda Mishra & Hadibandhu Pattanayak - 423-437 An EOQ inventory model for deteriorating items with time-dependent deterioration rate, ramp-type demand rate and shortages
by Trailokyanath Singh & Pandit Jagatananda Mishra & Hadibandhu Pattanayak - 438-456 Bias-correction in DEA efficiency scores using simulated beta samples: an alternative view of bootstrapping in DEA
by Parakramaweera Sunil Dharmapala - 438-456 Bias-correction in DEA efficiency scores using simulated beta samples: an alternative view of bootstrapping in DEA
by Parakramaweera Sunil Dharmapala - 457-470 Duality for non-differentiable multi-objective semi-infinite programming for higher order invex functions
by Promila Kumar & Jyoti - 457-470 Duality for non-differentiable multi-objective semi-infinite programming for higher order invex functions
by Promila Kumar & Jyoti - 471-506 Testing the fractional integration parameter revisited: a fractional Dickey-Fuller test
by Ahmed Bensalma - 471-506 Testing the fractional integration parameter revisited: a fractional Dickey-Fuller test
by Ahmed Bensalma - 507-531 Approximating service-time distributions by phase-type distributions in single-server queues: a strong stability approach
by Yasmina Djabali & Boualem Rabta & Djamil Aïssani - 507-531 Approximating service-time distributions by phase-type distributions in single-server queues: a strong stability approach
by Yasmina Djabali & Boualem Rabta & Djamil Aïssani - 532-541 On logarithmic fixed-charge transportation problem
by Debiprasad Acharya & Manjusri Basu & Atanu Das - 532-541 On logarithmic fixed-charge transportation problem
by Debiprasad Acharya & Manjusri Basu & Atanu Das - 542-564 A mathematical investigation of Rao diversity coefficients among the communities according to species morphometry and species taxonomy
by Kenneth Barroga - 542-564 A mathematical investigation of Rao diversity coefficients among the communities according to species morphometry and species taxonomy
by Kenneth Barroga
2018, Volume 12, Issue 3
- 293-316 Unreliable bulk queueing model with optional services, Bernoulli vacation schedule and balking
by Binay Kumar - 293-316 Unreliable bulk queueing model with optional services, Bernoulli vacation schedule and balking
by Binay Kumar - 317-330 An exact algorithm for multi-constrained minimum spanning tree problem
by T. Jayanth Kumar & Purusotham Singamsetty - 317-330 An exact algorithm for multi-constrained minimum spanning tree problem
by T. Jayanth Kumar & Purusotham Singamsetty - 331-349 An order level inventory model for deteriorating stock product and time dependent demand under shortages
by Deepa Khurana & Rekha Rani Chaudhary - 331-349 An order level inventory model for deteriorating stock product and time dependent demand under shortages
by Deepa Khurana & Rekha Rani Chaudhary - 350-363 A production inventory model with selling price and stock sensitive demand under partial backlogging
by Deo Datta Aarya & Mukesh Kumar - 350-363 A production inventory model with selling price and stock sensitive demand under partial backlogging
by Deo Datta Aarya & Mukesh Kumar - 364-377 On duality of fuzzy multiobjective optimisation problems: application to a multiplicative search technique
by Mohamed Abd El-Hady Kassem & Mohamed Abd Allah El-Hadidy - 364-377 On duality of fuzzy multiobjective optimisation problems: application to a multiplicative search technique
by Mohamed Abd El-Hady Kassem & Mohamed Abd Allah El-Hadidy - 378-396 Optimal ordering policy for deteriorating items under down-stream trade credit dependent quadratic demand with full up-stream trade credit and partial down-stream trade credit
by Nita H. Shah & Mrudul Y. Jani & Urmila Chaudhari - 378-396 Optimal ordering policy for deteriorating items under down-stream trade credit dependent quadratic demand with full up-stream trade credit and partial down-stream trade credit
by Nita H. Shah & Mrudul Y. Jani & Urmila Chaudhari - 397-412 Simultaneous selection factories, assignment products to factories, lot-sizing and scheduling in distributed permutation flow shop
by Mohammad Mohammadi - 397-412 Simultaneous selection factories, assignment products to factories, lot-sizing and scheduling in distributed permutation flow shop
by Mohammad Mohammadi