IDEAS home Printed from https://ideas.repec.org/r/inm/ormnsc/v40y1994i12p1678-1689.html
   My bibliography  Save this item

Safety Stock versus Safety Time in MRP Controlled Production Systems

Citations

Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
as


Cited by:

  1. Vincent Giard & Mustapha Sali, 2012. "Monitoring of the upstream part of a supply chain dedicated to the customized mass production with a revisited version of MRP," Working Papers hal-00875498, HAL.
  2. Jansen, Sjors & Atan, Zümbül & Adan, Ivo & Kok, Ton de, 2019. "Setting optimal planned leadtimes in configure-to-order assembly systems," European Journal of Operational Research, Elsevier, vol. 273(2), pages 585-595.
  3. James R. Bradley & Peter W. Glynn, 2002. "Managing Capacity and Inventory Jointly in Manufacturing Systems," Management Science, INFORMS, vol. 48(2), pages 273-288, February.
  4. Jean-Philippe Gayon & Saif Benjaafar & Francis de Véricourt, 2009. "Using Imperfect Advance Demand Information in Production-Inventory Systems with Multiple Customer Classes," Manufacturing & Service Operations Management, INFORMS, vol. 11(1), pages 128-143, July.
  5. Liberopoulos, George, 2008. "On the tradeoff between optimal order-base-stock levels and demand lead-times," European Journal of Operational Research, Elsevier, vol. 190(1), pages 136-155, October.
  6. Feng, Haofang & Zhang, Sheng Hao & Zhang, Yong, 2023. "Managing production-inventory-maintenance systems with condition monitoring," European Journal of Operational Research, Elsevier, vol. 310(2), pages 698-711.
  7. Altendorfer, Klaus & Minner, Stefan, 2011. "Simultaneous optimization of capacity and planned lead time in a two-stage production system with different customer due dates," European Journal of Operational Research, Elsevier, vol. 213(1), pages 134-146, August.
  8. Boulaksil, Youssef, 2016. "Safety stock placement in supply chains with demand forecast updates," Operations Research Perspectives, Elsevier, vol. 3(C), pages 27-31.
  9. Liberopoulos, George & Koukoumialos, Stelios, 2005. "Tradeoffs between base stock levels, numbers of kanbans, and planned supply lead times in production/inventory systems with advance demand information," International Journal of Production Economics, Elsevier, vol. 96(2), pages 213-232, May.
  10. Tong Wang & Beril L. Toktay, 2008. "Inventory Management with Advance Demand Information and Flexible Delivery," Management Science, INFORMS, vol. 54(4), pages 716-732, April.
  11. Tang, Ou & Grubbstrom, Robert W., 2003. "The detailed coordination problem in a two-level assembly system with stochastic lead times," International Journal of Production Economics, Elsevier, vol. 81(1), pages 415-429, January.
  12. Jana Ralfs & Gudrun P. Kiesmüller, 2022. "Inventory management with advance demand information and flexible shipment consolidation," OR Spectrum: Quantitative Approaches in Management, Springer;Gesellschaft für Operations Research e.V., vol. 44(4), pages 1009-1044, December.
  13. Zümbül Atan & Ton de Kok & Nico P. Dellaert & Richard van Boxel & Fred Janssen, 2016. "Setting Planned Leadtimes in Customer-Order-Driven Assembly Systems," Manufacturing & Service Operations Management, INFORMS, vol. 18(1), pages 122-140, February.
  14. Benton, W. C. & Shin, Hojung, 1998. "Manufacturing planning and control: The evolution of MRP and JIT integration," European Journal of Operational Research, Elsevier, vol. 110(3), pages 411-440, November.
  15. Milne, R. John & Mahapatra, Santosh & Wang, Chi-Tai, 2015. "Optimizing planned lead times for enhancing performance of MRP systems," International Journal of Production Economics, Elsevier, vol. 167(C), pages 220-231.
  16. Gansterer, Margaretha, 2015. "Aggregate planning and forecasting in make-to-order production systems," International Journal of Production Economics, Elsevier, vol. 170(PB), pages 521-528.
  17. Vincent Giard & Mustapha Sali, 2012. "Pilotage d'une chaîne logistique par une approche de type MRP dans un environnement partiellement aléatoire," Working Papers hal-00875497, HAL.
  18. repec:dau:papers:123456789/9020 is not listed on IDEAS
  19. Altendorfer, Klaus, 2015. "Influence of lot size and planned lead time on service level and inventory for a single-stage production system with advance demand information and random required lead times," International Journal of Production Economics, Elsevier, vol. 170(PB), pages 478-488.
  20. L. Beril Toktay & Lawrence M. Wein, 2001. "Analysis of a Forecasting-Production-Inventory System with Stationary Demand," Management Science, INFORMS, vol. 47(9), pages 1268-1281, September.
  21. Gansterer, Margaretha & Almeder, Christian & Hartl, Richard F., 2014. "Simulation-based optimization methods for setting production planning parameters," International Journal of Production Economics, Elsevier, vol. 151(C), pages 206-213.
  22. Tor Schoenmeyr & Stephen C. Graves, 2009. "Strategic Safety Stocks in Supply Chains with Evolving Forecasts," Manufacturing & Service Operations Management, INFORMS, vol. 11(4), pages 657-673, March.
  23. repec:dau:papers:123456789/9021 is not listed on IDEAS
  24. Paul Glasserman & Yashan Wang, 1998. "Leadtime-Inventory Trade-Offs in Assemble-to-Order Systems," Operations Research, INFORMS, vol. 46(6), pages 858-871, December.
  25. Alexander Seitz & Martin Grunow, 2017. "Increasing accuracy and robustness of order promises," International Journal of Production Research, Taylor & Francis Journals, vol. 55(3), pages 656-670, February.
  26. Jacobs, F. Robert & Bendoly, Elliot, 2003. "Enterprise resource planning: Developments and directions for operations management research," European Journal of Operational Research, Elsevier, vol. 146(2), pages 233-240, April.
  27. Mohammed Hichame Benbitour & Evren Sahin, 2015. "Evaluation of the Impact of Uncertain Advance Demand Information on Production/Inventory Systems," Post-Print hal-01199290, HAL.
  28. Louly, Mohamed-Aly & Dolgui, Alexandre, 2013. "Optimal MRP parameters for a single item inventory with random replenishment lead time, POQ policy and service level constraint," International Journal of Production Economics, Elsevier, vol. 143(1), pages 35-40.
IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.