IDEAS home Printed from https://ideas.repec.org/r/eee/proeco/v109y2007i1-2p241-253.html
   My bibliography  Save this item

An integrated vendor-managed inventory model for a two-echelon system with order cost reduction

Citations

Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
as


Cited by:

  1. Yu, Yugang & Huang, George Q., 2010. "Nash game model for optimizing market strategies, configuration of platform products in a Vendor Managed Inventory (VMI) supply chain for a product family," European Journal of Operational Research, Elsevier, vol. 206(2), pages 361-373, October.
  2. Lee, Jun-Yeon & Cho, Richard K. & Paik, Seung-Kuk, 2016. "Supply chain coordination in vendor-managed inventory systems with stockout-cost sharing under limited storage capacity," European Journal of Operational Research, Elsevier, vol. 248(1), pages 95-106.
  3. Govindan, Kannan & Malomfalean, Andreea, 2019. "A framework for evaluation of supply chain coordination by contracts under O2O environment," International Journal of Production Economics, Elsevier, vol. 215(C), pages 11-23.
  4. Feng, Xuehao & Moon, Ilkyeong & Ryu, Kwangyeol, 2017. "Warehouse capacity sharing via transshipment for an integrated two-echelon supply chain," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 104(C), pages 17-35.
  5. S. Hemapriya & R. Uthayakumar, 2017. "An inventory model with uncertain demand and lost sales reduction under service level constraint," International Journal of System Assurance Engineering and Management, Springer;The Society for Reliability, Engineering Quality and Operations Management (SREQOM),India, and Division of Operation and Maintenance, Lulea University of Technology, Sweden, vol. 8(2), pages 1399-1418, November.
  6. Dhahri, Akrem & Gharbi, Ali & Ouhimmou, Mustapha, 2022. "Integrated production-delivery control policy for an unreliable manufacturing system and multiple retailers," International Journal of Production Economics, Elsevier, vol. 245(C).
  7. Yu, Yugang & Wang, Zheng & Liang, Liang, 2012. "A vendor managed inventory supply chain with deteriorating raw materials and products," International Journal of Production Economics, Elsevier, vol. 136(2), pages 266-274.
  8. Chung, Kun-Jen, 2008. "A necessary and sufficient condition for the existence of the optimal solution of a single-vendor single-buyer integrated production-inventory model with process unreliability consideration," International Journal of Production Economics, Elsevier, vol. 113(1), pages 269-274, May.
  9. Hossain, Md Shahriar J. & Ohaiba, Mohamed M. & Sarker, Bhaba R., 2017. "An optimal vendor-buyer cooperative policy under generalized lead-time distribution with penalty cost for delivery lateness," International Journal of Production Economics, Elsevier, vol. 188(C), pages 50-62.
  10. Qiu, Xuan & Huang, George Q., 2016. "Transportation service sharing and replenishment/delivery scheduling in Supply Hub in Industrial Park (SHIP)," International Journal of Production Economics, Elsevier, vol. 175(C), pages 109-120.
  11. Taleizadeh, Ata Allah & Shokr, Iman & Konstantaras, Ioannis & VafaeiNejad, Mahyar, 2020. "Stock replenishment policies for a vendor-managed inventory in a retailing system," Journal of Retailing and Consumer Services, Elsevier, vol. 55(C).
  12. Verma, Nishant Kumar & Chakraborty, Abhishek & Chatterjee, Ashis K., 2014. "Joint replenishment of multi retailer with variable replenishment cycle under VMI," European Journal of Operational Research, Elsevier, vol. 233(3), pages 787-789.
  13. Xiao, Tiaojun & Xu, Tiantian, 2013. "Coordinating price and service level decisions for a supply chain with deteriorating item under vendor managed inventory," International Journal of Production Economics, Elsevier, vol. 145(2), pages 743-752.
  14. Parsa, Payam & Rossetti, Manuel D. & Zhang, Shengfan & Pohl, Edward A., 2017. "Quantifying the benefits of continuous replenishment program for partner evaluation," International Journal of Production Economics, Elsevier, vol. 187(C), pages 229-245.
  15. Rad, Reza Hosseini & Razmi, Jafar & Sangari, Mohamad Sadegh & Ebrahimi, Zahra Fallah, 2014. "Optimizing an integrated vendor-managed inventory system for a single-vendor two-buyer supply chain with determining weighting factor for vendor׳s ordering cost," International Journal of Production Economics, Elsevier, vol. 153(C), pages 295-308.
  16. Glock, Christoph H., 2012. "The joint economic lot size problem: A review," International Journal of Production Economics, Elsevier, vol. 135(2), pages 671-686.
  17. K. F. Mary Latha & M. Ganesh Kumar & R. Uthayakumar, 2021. "Two echelon economic lot sizing problems with geometric shipment policy backorder price discount and optimal investment to reduce ordering cost," OPSEARCH, Springer;Operational Research Society of India, vol. 58(4), pages 1133-1163, December.
  18. Yu, Yugang & Chu, Feng & Chen, Haoxun, 2009. "A Stackelberg game and its improvement in a VMI system with a manufacturing vendor," European Journal of Operational Research, Elsevier, vol. 192(3), pages 929-948, February.
  19. Darwish, M.A. & Odah, O.M., 2010. "Vendor managed inventory model for single-vendor multi-retailer supply chains," European Journal of Operational Research, Elsevier, vol. 204(3), pages 473-484, August.
  20. M. Vijayashree & R. Uthayakumar, 2016. "Two-echelon supply chain inventory model with controllable lead time," International Journal of System Assurance Engineering and Management, Springer;The Society for Reliability, Engineering Quality and Operations Management (SREQOM),India, and Division of Operation and Maintenance, Lulea University of Technology, Sweden, vol. 7(1), pages 112-125, December.
  21. Almehdawe, Eman & Mantin, Benny, 2010. "Vendor managed inventory with a capacitated manufacturer and multiple retailers: Retailer versus manufacturer leadership," International Journal of Production Economics, Elsevier, vol. 128(1), pages 292-302, November.
  22. S. Sarkar & B. C. Giri, 2020. "A vendor–buyer integrated inventory system with variable lead time and uncertain market demand," Operational Research, Springer, vol. 20(1), pages 491-515, March.
  23. Huang, Chao-Kuei & Tsai, Deng-Maw & Wu, Ji-Cheng & Chung, Kun-Jen, 2010. "An optimal integrated vendor-buyer inventory policy under conditions of order-processing time reduction and permissible delay in payments," International Journal of Production Economics, Elsevier, vol. 128(1), pages 445-451, November.
  24. Diabat, Ali, 2014. "Hybrid algorithm for a vendor managed inventory system in a two-echelon supply chain," European Journal of Operational Research, Elsevier, vol. 238(1), pages 114-121.
  25. Tiaojun Xiao & Xiangtong Qi, 2016. "A two-stage supply chain with demand sensitive to price, delivery time, and reliability of delivery," Annals of Operations Research, Springer, vol. 241(1), pages 475-496, June.
  26. Haji, Rasoul & Neghab, Mohammadali Pirayesh & Baboli, Armand, 2009. "Introducing a new ordering policy in a two-echelon inventory system with Poisson demand," International Journal of Production Economics, Elsevier, vol. 117(1), pages 212-218, January.
  27. Monami Das Roy & Shib Sankar Sana, 2021. "Inter-dependent lead-time and ordering cost reduction strategy: a supply chain model with quality control, lead-time dependent backorder and price-sensitive stochastic demand," OPSEARCH, Springer;Operational Research Society of India, vol. 58(3), pages 690-710, September.
  28. Antonello Cammarano & Vincenzo Varriale & Francesca Michelino & Mauro Caputo, 2023. "Blockchain as enabling factor for implementing RFID and IoT technologies in VMI: a simulation on the Parmigiano Reggiano supply chain," Operations Management Research, Springer, vol. 16(2), pages 726-754, June.
  29. Yu, Y. & Huang, G.Q., 2009. "Nash Game Model for Optimizing Market Strategies, Configuration of Platform Products in a Vendor Managed Inventory (VMI) Supply Chain for a Product Family," ERIM Report Series Research in Management ERS-2009-009-LIS, Erasmus Research Institute of Management (ERIM), ERIM is the joint research institute of the Rotterdam School of Management, Erasmus University and the Erasmus School of Economics (ESE) at Erasmus University Rotterdam.
  30. Xu, Kefeng & Leung, Mark T., 2009. "Stocking policy in a two-party vendor managed channel with space restrictions," International Journal of Production Economics, Elsevier, vol. 117(2), pages 271-285, February.
IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.