Minimizing weighted earliness and tardiness penalties in single‐machine scheduling with idle time permitted

Author

Listed:
  • Jaw‐Yeh Chen
  • Sheng‐Fuu Lin

Abstract

In this paper, a single‐machine scheduling problem with weighted earliness and tardiness penalties is considered. Idle time between two adjacent jobs is permitted and due dates of jobs could be unequal. The dominance rules are utilized to develop a relationship matrix, which allows a branch‐and‐bound algorithm to eliminate a high percentage of infeasible solutions. After combining this matrix with a branching strategy, a procedure to solve the problem is proposed. © 2002 Wiley Periodicals, Inc. Naval Research Logistics 49: 760–780, 2002; Published online in Wiley InterScience (www.interscience.wiley.com). DOI 10.1002/nav.10039

Suggested Citation

  • Jaw‐Yeh Chen & Sheng‐Fuu Lin, 2002. "Minimizing weighted earliness and tardiness penalties in single‐machine scheduling with idle time permitted," Naval Research Logistics (NRL), John Wiley & Sons, vol. 49(8), pages 760-780, December.
  • Handle: RePEc:wly:navres:v:49:y:2002:i:8:p:760-780
    DOI: 10.1002/nav.10039
    as

    Download full text from publisher

    File URL: https://doi.org/10.1002/nav.10039
    Download Restriction: no

    File URL: https://libkey.io/10.1002/nav.10039?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    References listed on IDEAS

    as
    1. J. Steve Davis & John J. Kanet, 1993. "Single‐machine scheduling with early and tardy completion costs," Naval Research Logistics (NRL), John Wiley & Sons, vol. 40(1), pages 85-101, February.
    2. Wlodzimierz Szwarc, 1993. "Adjacent orderings in single‐machine scheduling with earliness and tardiness penalties," Naval Research Logistics (NRL), John Wiley & Sons, vol. 40(2), pages 229-243, March.
    3. Koulamas, Christos, 1996. "Single-machine scheduling with time windows and earliness/tardiness penalties," European Journal of Operational Research, Elsevier, vol. 91(1), pages 190-202, May.
    4. Wlodzimierz Szwarc & Samar K. Mukhopadhyay, 1995. "Optimal timing schedules in earliness‐tardiness single machine sequencing," Naval Research Logistics (NRL), John Wiley & Sons, vol. 42(7), pages 1109-1114, October.
    5. Michael R. Garey & Robert E. Tarjan & Gordon T. Wilfong, 1988. "One-Processor Scheduling with Symmetric Earliness and Tardiness Penalties," Mathematics of Operations Research, INFORMS, vol. 13(2), pages 330-348, May.
    6. Kenneth R. Baker & Gary D. Scudder, 1990. "Sequencing with Earliness and Tardiness Penalties: A Review," Operations Research, INFORMS, vol. 38(1), pages 22-36, February.
    7. J. A. Hoogeveen & S. L. van de Velde, 1996. "A Branch-and-Bound Algorithm for Single-Machine Earliness--Tardiness Scheduling with Idle Time," INFORMS Journal on Computing, INFORMS, vol. 8(4), pages 402-412, November.
    8. Yeong‐Dae Kim & Candace Arai Yano, 1994. "Minimizing mean tardiness and earliness in single‐machine scheduling problems with unequal due dates," Naval Research Logistics (NRL), John Wiley & Sons, vol. 41(7), pages 913-933, December.
    Full references (including those not matched with items on IDEAS)

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. John J. Kanet & V. Sridharan, 2000. "Scheduling with Inserted Idle Time: Problem Taxonomy and Literature Review," Operations Research, INFORMS, vol. 48(1), pages 99-110, February.
    2. Wan, Guohua & Yen, Benjamin P. -C., 2002. "Tabu search for single machine scheduling with distinct due windows and weighted earliness/tardiness penalties," European Journal of Operational Research, Elsevier, vol. 142(2), pages 271-281, October.
    3. Schaller, Jeffrey & Valente, Jorge M.S., 2020. "Minimizing total earliness and tardiness in a nowait flow shop," International Journal of Production Economics, Elsevier, vol. 224(C).
    4. Francis Sourd, 2009. "New Exact Algorithms for One-Machine Earliness-Tardiness Scheduling," INFORMS Journal on Computing, INFORMS, vol. 21(1), pages 167-175, February.
    5. Vincent T’kindt & Karima Bouibede-Hocine & Carl Esswein, 2007. "Counting and enumeration complexity with application to multicriteria scheduling," Annals of Operations Research, Springer, vol. 153(1), pages 215-234, September.
    6. Guang Feng & Hoong Lau, 2008. "Efficient algorithms for machine scheduling problems with earliness and tardiness penalties," Annals of Operations Research, Springer, vol. 159(1), pages 83-95, March.
    7. N Nekoiemehr & G Moslehi, 2011. "Minimizing the sum of maximum earliness and maximum tardiness in the single-machine scheduling problem with sequence-dependent setup time," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 62(7), pages 1403-1412, July.
    8. Hoogeveen, Han, 2005. "Multicriteria scheduling," European Journal of Operational Research, Elsevier, vol. 167(3), pages 592-623, December.
    9. Kate, H.A. ten & Wijngaard, J. & Zijm, W.H.M., 1995. "Minimizing weighted total earliness, total tardiness and setup costs," Research Report 95A37, University of Groningen, Research Institute SOM (Systems, Organisations and Management).
    10. Ventura, Jose A. & Radhakrishnan, Sanjay, 2003. "Single machine scheduling with symmetric earliness and tardiness penalties," European Journal of Operational Research, Elsevier, vol. 144(3), pages 598-612, February.
    11. Kolahan, F. & Liang, M., 1998. "An adaptive TS approach to JIT sequencing with variable processing times and sequence-dependent setups," European Journal of Operational Research, Elsevier, vol. 109(1), pages 142-159, August.
    12. Koulamas, Christos, 1996. "Single-machine scheduling with time windows and earliness/tardiness penalties," European Journal of Operational Research, Elsevier, vol. 91(1), pages 190-202, May.
    13. Kerem Bülbül & Safia Kedad-Sidhoum & Halil Şen, 2019. "Single-machine common due date total earliness/tardiness scheduling with machine unavailability," Journal of Scheduling, Springer, vol. 22(5), pages 543-565, October.
    14. Mosheiov, Gur & Shadmon, Michal, 2001. "Minmax earliness-tardiness costs with unit processing time jobs," European Journal of Operational Research, Elsevier, vol. 130(3), pages 638-652, May.
    15. Sourd, Francis, 2005. "Punctuality and idleness in just-in-time scheduling," European Journal of Operational Research, Elsevier, vol. 167(3), pages 739-751, December.
    16. Simon Thevenin & Nicolas Zufferey & Marino Widmer, 2016. "Order acceptance and scheduling with earliness and tardiness penalties," Journal of Heuristics, Springer, vol. 22(6), pages 849-890, December.
    17. Zhi-Long Chen, 1997. "Scheduling with batch setup times and earliness-tardiness penalties," European Journal of Operational Research, Elsevier, vol. 96(3), pages 518-537, February.
    18. Ventura, Jose A. & Kim, Daecheol & Garriga, Frederic, 2002. "Single machine earliness-tardiness scheduling with resource-dependent release dates," European Journal of Operational Research, Elsevier, vol. 142(1), pages 52-69, October.
    19. Janiak, Adam & Janiak, Władysław A. & Krysiak, Tomasz & Kwiatkowski, Tomasz, 2015. "A survey on scheduling problems with due windows," European Journal of Operational Research, Elsevier, vol. 242(2), pages 347-357.
    20. Weng, Michael X. & Ventura, Jose A., 1996. "Single-machine earliness-tardiness scheduling about a common due date with tolerances," International Journal of Production Economics, Elsevier, vol. 42(3), pages 217-227, April.

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:wly:navres:v:49:y:2002:i:8:p:760-780. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Wiley Content Delivery (email available below). General contact details of provider: https://doi.org/10.1002/(ISSN)1520-6750 .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.