IDEAS home Printed from https://ideas.repec.org/a/vrs/otamic/v14y2022i1p2559-2570n2.html
   My bibliography  Save this article

Effects of lagging projectification in the public sector on realizing infrastructure projects

Author

Listed:
  • Wagner Reinhard F.

    (Alma Mater Europaea - European Center Maribor, Slovenska 17, 2000Maribor (Slovenia))

  • Radujkovic Mladen

    (Alma Mater Europaea - European Center Maribor, Slovenska 17, 2000Maribor (Slovenia))

Abstract

The public sector in Germany lags behind the economy in terms of projectification, i.e., the prevalence of projects and experience in applying project management. This has significant implications for realizing complex infrastructure projects in which the public sector is involved as one of the main actors. Nowadays, projectification represents a particular way of thinking about how to embrace a series of dynamic and challenging changes, design them, and implement them effectively for the benefit of society. A quantitative study of projectification in society in Germany was the starting point for our research, the results of which we compared with data from earlier studies of projectification in the economy. Using an interpretative case study drawing on insights from the Berlin Airport, we analyzed the impact of lagging projectification in the public sector in Germany on realizing infrastructure projects to propose suitable approaches. The results of this case study reveal significant effects of lagging projectification in the public sector of Germany on realizing infrastructure projects. In the case of the Berlin BER Airport, an inadequate governance system led to a 9-year delay in the completion date and a 250% overrun of costs directly attributable to the project. This could have been avoided by involving the private construction industry more collaboratively, by building on previous experiences gained, and by a more cooperative way of project planning and implementation. To guide future research, hypotheses are derived that can be used to analyze the underlying problem in greater depth and to derive recommendations for action.

Suggested Citation

  • Wagner Reinhard F. & Radujkovic Mladen, 2022. "Effects of lagging projectification in the public sector on realizing infrastructure projects," Organization, Technology and Management in Construction, Sciendo, vol. 14(1), pages 2559-2570, January.
  • Handle: RePEc:vrs:otamic:v:14:y:2022:i:1:p:2559-2570:n:2
    DOI: 10.2478/otmcj-2022-0002
    as

    Download full text from publisher

    File URL: https://doi.org/10.2478/otmcj-2022-0002
    Download Restriction: no

    File URL: https://libkey.io/10.2478/otmcj-2022-0002?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    References listed on IDEAS

    as
    1. Bertram I. Steininger & Martin Groth & Brigitte L. Weber, 2020. "Cost overruns and delays in infrastructure projects: the case of Stuttgart 21," Journal of Property Investment & Finance, Emerald Group Publishing Limited, vol. 39(3), pages 256-282, November.
    2. Christophe Midler, 1995. "Projectification of the Firm : the Renault Case," Post-Print hal-00262524, HAL.
    3. Steininger, Bertram & Groth, Martin & Weber, Birgitte, 2020. "Cost overruns and delays in infrastructure projects: the case of Stuttgart 21," Working Paper Series 20/11, Royal Institute of Technology, Department of Real Estate and Construction Management & Banking and Finance.
    4. Stephan Manning & Jörg Sydow, 2011. "Projects, paths, and practices: sustaining and leveraging project-based relationships," Industrial and Corporate Change, Oxford University Press and the Associazione ICC, vol. 20(5), pages 1369-1402, October.
    5. Schlömer-Laufen Nadine & Schneck Stefan, 2020. "Data for Mittelstand Companies in Germany at the IfM Bonn," Journal of Economics and Statistics (Jahrbuecher fuer Nationaloekonomie und Statistik), De Gruyter, vol. 240(6), pages 849-859, December.
    6. Midler, Christophe, 1995. ""Projectification" of the firm: The renault case," Scandinavian Journal of Management, Elsevier, vol. 11(4), pages 363-375, December.
    7. Kai Wegrich, 2021. "Is the turtle still plodding along? Public management reform in Germany," Public Management Review, Taylor & Francis Journals, vol. 23(8), pages 1107-1116, August.
    Full references (including those not matched with items on IDEAS)

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Peter B. Doeringer & Pacey Foster & Stephan Manning & David Terkla, 2013. "Project-based industries and craft-like production: structure, location and performance," Chapters, in: Frank Giarratani & Geoffrey J.D. Hewings & Philip McCann (ed.), Handbook of Industry Studies and Economic Geography, chapter 4, pages 99-151, Edward Elgar Publishing.
    2. Fanny Simon & Albéric Tellier, 2016. "Balancing contradictory temporality during the unfold of innovation streams," Post-Print hal-01572302, HAL.
    3. Manning, Stephan, 2017. "The rise of project network organizations: Building core teams and flexible partner pools for interorganizational projects," Research Policy, Elsevier, vol. 46(8), pages 1399-1415.
    4. Martin M�ller & Allison Stewart, 2016. "Does Temporary Geographical Proximity Predict Learning? Knowledge Dynamics in the Olympic Games," Regional Studies, Taylor & Francis Journals, vol. 50(3), pages 377-390, March.
    5. Małgorzata Ćwikła & Anna Góral & Ewa Bogacz-Wojtanowska & Magdalena Dudkiewicz, 2020. "Project-Based Work and Sustainable Development—A Comparative Case Study of Cultural Animation Projects," Sustainability, MDPI, vol. 12(16), pages 1-24, August.
    6. repec:hal:journl:hal-01070044 is not listed on IDEAS
    7. Pierre-Antoine Arrighi & Pascal Le Masson & Benoit Weil, 2013. "Breaking the dilemma between robustness and generativeness: a comparative experiment on the use of new design software at the design-gap," Post-Print hal-00903606, HAL.
    8. Patrícia Marques & Paulo Sousa & Anabela Tereso, 2023. "Sustainability in Project Management: PM 2 versus PRiSM TM," Sustainability, MDPI, vol. 15(22), pages 1-36, November.
    9. Gernot Grabher, 2002. "Cool Projects, Boring Institutions: Temporary Collaboration in Social Context," Regional Studies, Taylor & Francis Journals, vol. 36(3), pages 205-214.
    10. Mitsuru Kodama & Tomoatsu Shibata, 2013. "Research into Ambidextrous R&D in Product Development New Product Development at a Precision Device Maker," TMARG Discussion Papers 109, Graduate School of Economics and Management, Tohoku University.
    11. Jorg Sydow & Udo Staber, 2002. "The Institutional Embeddedness of Project Networks: The Case of Content Production in German Television," Regional Studies, Taylor & Francis Journals, vol. 36(3), pages 215-227.
    12. Hala Alioua & Fanny Simon, 2017. "Managing time pacing in organizations transitioning to a project- based mode – 3 case studies of two multinational companies," Post-Print hal-01597589, HAL.
    13. Kaouthar Mlaouhi & Lilia Gzara & Céline Cholez, 2021. "Use of Competency Management Methods and Tools in Project-based Organizations," Post-Print hal-03842413, HAL.
    14. David Dornisch, 2002. "The Evolution of Post-socialist Projects: Trajectory Shift and Transitional Capacity in a Polish Region," Regional Studies, Taylor & Francis Journals, vol. 36(3), pages 307-321.
    15. Nabila Iken & Franck Aggeri & Stéphane Morel, 2020. "How to lead a sustainability transition at the company level? An approach based on management tools performativity [Comment mener une transition soutenable au niveau de l'entreprise ? Une approche ," Post-Print halshs-02903500, HAL.
    16. Stéphanie Tillement & Frédéric Garcias & Guy Minguet & Florence Charue Duboc, 2019. "Disentangling Exploitation and Exploration in Hybrid Projects: The Case of a New Nuclear Reactor Development," Post-Print halshs-02276378, HAL.
    17. Shankar Sankaran & Mattias Jacobsson & Tomas Blomquist, 2021. "The history and future of projects as a transition innovation: Towards a sustainable project management framework," Systems Research and Behavioral Science, Wiley Blackwell, vol. 38(5), pages 696-714, October.
    18. Terrien, Clara & Maniak, Rémi & Chen, Bo & Shaheen, Susan, 2016. "Good Practices for Advancing Urban Mobility Innovation: A Case Study of One-Way Carsharing," Institute of Transportation Studies, Research Reports, Working Papers, Proceedings qt53z3h2gt, Institute of Transportation Studies, UC Berkeley.
    19. Frédéric Segonds & Julien Nelson & Améziane Aoussat, 2012. "PLM and architectural rehabilitation : a framework to improve collaboration in the early stages of design," Post-Print hal-00719169, HAL.
    20. Thordur Vikingur Fridgeirsson & Helgi Thor Ingason & Haukur Ingi Jonasson & Bara Hlin Kristjansdottir, 2021. "The VUCAlity of Projects: A New Approach to Assess a Project Risk in a Complex World," Sustainability, MDPI, vol. 13(7), pages 1-13, March.
    21. Martin Müller, 2014. "The Topological Multiplicities of Power: The Limits of Governing the Olympics," Economic Geography, Clark University, vol. 90(3), pages 321-339, July.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:vrs:otamic:v:14:y:2022:i:1:p:2559-2570:n:2. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Peter Golla (email available below). General contact details of provider: https://www.sciendo.com .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.