IDEAS home Printed from https://ideas.repec.org/a/spr/opsear/v53y2016i4d10.1007_s12597-016-0251-z.html
   My bibliography  Save this article

Pricing and production decisions in multi-product single machine manufacturing system with discrete delivery and rework

Author

Listed:
  • Shima Shafiee-Gol

    (University of Tehran)

  • Mohammad Mahdi Nasiri

    (University of Tehran)

  • Ata Allah Taleizadeh

    (University of Tehran)

Abstract

The classic economic production quantity (EPQ) inventory model assumes all items produced are of perfect quality. However, in most real-life manufacturing settings, generation of defective items is unavoidable. Reworking of imperfect items reduces the overall costs. The finished products can only be delivered to customers if the whole lot is quality assured at the end of rework. In addition, in many circumstances the delivery of the products is not continuous. This paper studies pricing and production decisions in multi-product single machine manufacturing system considering discrete delivery as well as rework. We solved this problem in two situations: first, when the condition is satisfied and second, when it is not satisfied. The obtained closed-form solution is optimal when the only constraint of the problem is satisfied; otherwise, the Lagrangian relaxation method is used to determine T* and Q*. At the end, numerical example is solved to illustrate the validity of the proposed solution procedure.

Suggested Citation

  • Shima Shafiee-Gol & Mohammad Mahdi Nasiri & Ata Allah Taleizadeh, 2016. "Pricing and production decisions in multi-product single machine manufacturing system with discrete delivery and rework," OPSEARCH, Springer;Operational Research Society of India, vol. 53(4), pages 873-888, December.
  • Handle: RePEc:spr:opsear:v:53:y:2016:i:4:d:10.1007_s12597-016-0251-z
    DOI: 10.1007/s12597-016-0251-z
    as

    Download full text from publisher

    File URL: http://link.springer.com/10.1007/s12597-016-0251-z
    File Function: Abstract
    Download Restriction: Access to the full text of the articles in this series is restricted.

    File URL: https://libkey.io/10.1007/s12597-016-0251-z?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Chiu, Yuan-Shyi Peter & Ting, Chia-Kuan, 2010. "A note on "Determining the optimal run time for EPQ model with scrap, rework, and stochastic breakdowns"," European Journal of Operational Research, Elsevier, vol. 201(2), pages 641-643, March.
    2. Chiu, Singa Wang & Wang, Shan-Ling & Chiu, Yuan-Shyi Peter, 2007. "Determining the optimal run time for EPQ model with scrap, rework, and stochastic breakdowns," European Journal of Operational Research, Elsevier, vol. 180(2), pages 664-676, July.
    3. Taleizadeh, Ata Allah & Cárdenas-Barrón, Leopoldo Eduardo & Mohammadi, Babak, 2014. "A deterministic multi product single machine EPQ model with backordering, scraped products, rework and interruption in manufacturing process," International Journal of Production Economics, Elsevier, vol. 150(C), pages 9-27.
    4. Chiu, Yuan-Shyi Peter & Chang, Huei-Hsin, 2014. "Optimal run time for EPQ model with scrap, rework and stochastic breakdowns: A note," Economic Modelling, Elsevier, vol. 37(C), pages 143-148.
    5. Chiu, Singa Wang & Pai, Fan-Yun & Wu, Wen Kuei, 2013. "Alternative approach to determine the common cycle time for a multi-item production system with discontinuous deliveries and failure in rework," Economic Modelling, Elsevier, vol. 35(C), pages 593-596.
    6. Taleizadeh, Ata Allah & Mohammadi, Babak & Cárdenas-Barrón, Leopoldo Eduardo & Samimi, Hadi, 2013. "An EOQ model for perishable product with special sale and shortage," International Journal of Production Economics, Elsevier, vol. 145(1), pages 318-338.
    7. Taleizadeh, Ata Allah & Noori-daryan, Mahsa & Cárdenas-Barrón, Leopoldo Eduardo, 2015. "Joint optimization of price, replenishment frequency, replenishment cycle and production rate in vendor managed inventory system with deteriorating items," International Journal of Production Economics, Elsevier, vol. 159(C), pages 285-295.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Amir Hossein Nobil & Amir Hosein Afshar Sedigh & Leopoldo Eduardo Cárdenas-Barrón, 2020. "A multiproduct single machine economic production quantity (EPQ) inventory model with discrete delivery order, joint production policy and budget constraints," Annals of Operations Research, Springer, vol. 286(1), pages 265-301, March.
    2. Tang, Xiaoying & He, Yong & Salling, Melissza, 2021. "Optimal pricing and production strategies for two manufacturers with industrial symbiosis," International Journal of Production Economics, Elsevier, vol. 235(C).
    3. S. Ganesan & R. Uthayakumar, 2023. "An EPQ model for a single-machine multiproduct imperfect production system using a hybrid logarithmic barrier method," OPSEARCH, Springer;Operational Research Society of India, vol. 60(3), pages 1121-1152, September.
    4. Amir Hossein Nobil & Amir Hosein Afshar Sedigh & Behrouz Afshar-Nadjafi, 2020. "Lot-sizing problem for a defective processing system with categorized items, backordering and pricing policy," Journal of Revenue and Pricing Management, Palgrave Macmillan, vol. 19(4), pages 255-265, August.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Al-Amin Khan, Md. & Shaikh, Ali Akbar & Konstantaras, Ioannis & Bhunia, Asoke Kumar & Cárdenas-Barrón, Leopoldo Eduardo, 2020. "Inventory models for perishable items with advanced payment, linearly time-dependent holding cost and demand dependent on advertisement and selling price," International Journal of Production Economics, Elsevier, vol. 230(C).
    2. Harun Öztürk, 2019. "Modeling an inventory problem with random supply, inspection and machine breakdown," OPSEARCH, Springer;Operational Research Society of India, vol. 56(2), pages 497-527, June.
    3. Janssen, Larissa & Claus, Thorsten & Sauer, Jürgen, 2016. "Literature review of deteriorating inventory models by key topics from 2012 to 2015," International Journal of Production Economics, Elsevier, vol. 182(C), pages 86-112.
    4. Harun Öztürk, 2021. "Optimal production run time for an imperfect production inventory system with rework, random breakdowns and inspection costs," Operational Research, Springer, vol. 21(1), pages 167-204, March.
    5. Noori-Daryan, Mahsa & Taleizadeh, Ata Allah & Jolai, Fariborz, 2019. "Analyzing pricing, promised delivery lead time, supplier-selection, and ordering decisions of a multi-national supply chain under uncertain environment," International Journal of Production Economics, Elsevier, vol. 209(C), pages 236-248.
    6. Pasandideh, Seyed Hamid Reza & Niaki, Seyed Taghi Akhavan & Nobil, Amir Hossein & Cárdenas-Barrón, Leopoldo Eduardo, 2015. "A multiproduct single machine economic production quantity model for an imperfect production system under warehouse construction cost," International Journal of Production Economics, Elsevier, vol. 169(C), pages 203-214.
    7. Chiu, Yuan-Shyi Peter & Chang, Huei-Hsin, 2014. "Optimal run time for EPQ model with scrap, rework and stochastic breakdowns: A note," Economic Modelling, Elsevier, vol. 37(C), pages 143-148.
    8. Ata Allah Taleizadeh, 2018. "A constrained integrated imperfect manufacturing-inventory system with preventive maintenance and partial backordering," Annals of Operations Research, Springer, vol. 261(1), pages 303-337, February.
    9. Taleizadeh, Ata Allah & Shokr, Iman & Konstantaras, Ioannis & VafaeiNejad, Mahyar, 2020. "Stock replenishment policies for a vendor-managed inventory in a retailing system," Journal of Retailing and Consumer Services, Elsevier, vol. 55(C).
    10. Taleizadeh, Ata Allah & Sadeghi, Razieh, 2019. "Pricing strategies in the competitive reverse supply chains with traditional and e-channels: A game theoretic approach," International Journal of Production Economics, Elsevier, vol. 215(C), pages 48-60.
    11. Adeinat, Hamza & Pazhani, Subramanian & Mendoza, Abraham & Ventura, Jose A., 2022. "Coordination of pricing and inventory replenishment decisions in a supply chain with multiple geographically dispersed retailers," International Journal of Production Economics, Elsevier, vol. 248(C).
    12. Arpita Roy & Shib Sankar Sana & Kripasindhu Chaudhuri, 2018. "Optimal Pricing of competing retailers under uncertain demand-a two layer supply chain model," Annals of Operations Research, Springer, vol. 260(1), pages 481-500, January.
    13. A. Thangam, 2017. "Retailer’s optimal replenishment policy in a two-echelon supply chain under two-part delay in payments and disruption in delivery," International Journal of System Assurance Engineering and Management, Springer;The Society for Reliability, Engineering Quality and Operations Management (SREQOM),India, and Division of Operation and Maintenance, Lulea University of Technology, Sweden, vol. 8(1), pages 26-46, January.
    14. Al-Salamah, Muhammad, 2019. "Economic production quantity in an imperfect manufacturing process with synchronous and asynchronous flexible rework rates," Operations Research Perspectives, Elsevier, vol. 6(C).
    15. Menezes, Mozart B.C. & Jalali, Hamed & Lamas, Alejandro, 2021. "One too many: Product proliferation and the financial performance in manufacturing," International Journal of Production Economics, Elsevier, vol. 242(C).
    16. Taleizadeh, Ata Allah & Cárdenas-Barrón, Leopoldo Eduardo & Mohammadi, Babak, 2014. "A deterministic multi product single machine EPQ model with backordering, scraped products, rework and interruption in manufacturing process," International Journal of Production Economics, Elsevier, vol. 150(C), pages 9-27.
    17. Chen, Zhixiang, 2019. "Reprint of “Optimization of production inventory with pricing and promotion effort for a single-vendor multi-buyer system of perishable products”," International Journal of Production Economics, Elsevier, vol. 209(C), pages 285-301.
    18. Nita H. Shah & Dushyantkumar G. Patel & Digeshkumar B. Shah, 2018. "EPQ model for returned/reworked inventories during imperfect production process under price-sensitive stock-dependent demand," Operational Research, Springer, vol. 18(2), pages 343-359, July.
    19. Chiu, Yuan-Shyi Peter & Chen, Yung-Chung & Lin, Hong-Dar & Chang, Huei-Hsin, 2014. "Combining an improved multi-delivery policy into a single-producer multi-retailer integrated inventory system with scrap in production," Economic Modelling, Elsevier, vol. 39(C), pages 163-167.
    20. Avinadav, Tal & Herbon, Avi & Spiegel, Uriel, 2014. "Optimal ordering and pricing policy for demand functions that are separable into price and inventory age," International Journal of Production Economics, Elsevier, vol. 155(C), pages 406-417.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:spr:opsear:v:53:y:2016:i:4:d:10.1007_s12597-016-0251-z. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Sonal Shukla or Springer Nature Abstracting and Indexing (email available below). General contact details of provider: http://www.springer.com .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.