IDEAS home Printed from https://ideas.repec.org/a/spr/jcomop/v44y2022i4d10.1007_s10878-020-00594-0.html
   My bibliography  Save this article

An approximation algorithm for a supply-chain scheduling problem with an assignable common due window and holding time

Author

Listed:
  • Long Zhang

    (Qufu Normal University)

  • Yuzhong Zhang

    (Qufu Normal University)

  • Qingguo Bai

    (Qufu Normal University)

Abstract

This paper studies single machine scheduling with batch deliveries, where a common due window for all jobs has to be determined, not given in advance. The objective is to minimize the overall cost for the process and delivery. Concretely, it includes the penalty of a job being early or tardy, the cost for holding and delivering a job, and the cost incurred by a late starting or a long duration of the common due window. Observing the NP-hardness, we provide an optimal algorithm of the problem and convert it to a fully polynomial time approximation scheme for a special case.

Suggested Citation

  • Long Zhang & Yuzhong Zhang & Qingguo Bai, 2022. "An approximation algorithm for a supply-chain scheduling problem with an assignable common due window and holding time," Journal of Combinatorial Optimization, Springer, vol. 44(4), pages 2167-2179, November.
  • Handle: RePEc:spr:jcomop:v:44:y:2022:i:4:d:10.1007_s10878-020-00594-0
    DOI: 10.1007/s10878-020-00594-0
    as

    Download full text from publisher

    File URL: http://link.springer.com/10.1007/s10878-020-00594-0
    File Function: Abstract
    Download Restriction: Access to the full text of the articles in this series is restricted.

    File URL: https://libkey.io/10.1007/s10878-020-00594-0?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. W.K. Yeung & Ceyda Oğuz & T.C. Cheng, 2001. "Minimizing Weighted Number of Early and Tardy Jobs with a Common Due Window Involving Location Penalty," Annals of Operations Research, Springer, vol. 108(1), pages 33-54, November.
    2. Herrmann, Jeffrey W. & Lee, Chung-Yee, 1993. "On scheduling to minimize earliness-tardiness and batch delivery costs with a common due date," European Journal of Operational Research, Elsevier, vol. 70(3), pages 272-288, November.
    3. Baruch Mor & Gur Mosheiov, 2017. "A two-agent single machine scheduling problem with due-window assignment and a common flow-allowance," Journal of Combinatorial Optimization, Springer, vol. 33(4), pages 1454-1468, May.
    4. Yin, Yunqiang & Cheng, T.C.E. & Hsu, Chou-Jung & Wu, Chin-Chia, 2013. "Single-machine batch delivery scheduling with an assignable common due window," Omega, Elsevier, vol. 41(2), pages 216-225.
    5. G Mosheiov & A Sarig, 2008. "A due-window assignment problem with position-dependent processing times," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 59(7), pages 997-1003, July.
    6. Long Zhang & Yuzhong Zhang & Qingguo Bai, 2019. "Two-stage medical supply chain scheduling with an assignable common due window and shelf life," Journal of Combinatorial Optimization, Springer, vol. 37(1), pages 319-329, January.
    7. Chen, Zhi-Long, 1996. "Scheduling and common due date assignment with earliness-tardiness penalties and batch delivery costs," European Journal of Operational Research, Elsevier, vol. 93(1), pages 49-60, August.
    8. Liman, Surya D. & Panwalkar, Shrikant S. & Thongmee, Sansern, 1996. "Determination of common due window location in a single machine scheduling problem," European Journal of Operational Research, Elsevier, vol. 93(1), pages 68-74, August.
    9. Cheng, T.C.E. & Yang, Suh-Jenq & Yang, Dar-Li, 2012. "Common due-window assignment and scheduling of linear time-dependent deteriorating jobs and a deteriorating maintenance activity," International Journal of Production Economics, Elsevier, vol. 135(1), pages 154-161.
    10. Esaignani Selvarajah & George Steiner, 2009. "Approximation Algorithms for the Supplier's Supply Chain Scheduling Problem to Minimize Delivery and Inventory Holding Costs," Operations Research, INFORMS, vol. 57(2), pages 426-438, April.
    11. Yeung, W. K. & Oguz, Ceyda & Edwin Cheng, T. C., 2004. "Two-stage flowshop earliness and tardiness machine scheduling involving a common due window," International Journal of Production Economics, Elsevier, vol. 90(3), pages 421-434, August.
    12. Jianfeng Ren & Guo Sun & Yuzhong Zhang, 2017. "The Supplying Chain Scheduling with Outsourcing and Transportation," Asia-Pacific Journal of Operational Research (APJOR), World Scientific Publishing Co. Pte. Ltd., vol. 34(02), pages 1-13, April.
    13. Esaignani Selvarajah & Rui Zhang, 2014. "Supply chain scheduling to minimize holding costs with outsourcing," Annals of Operations Research, Springer, vol. 217(1), pages 479-490, June.
    Full references (including those not matched with items on IDEAS)

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Long Zhang & Yuzhong Zhang & Qingguo Bai, 0. "An approximation algorithm for a supply-chain scheduling problem with an assignable common due window and holding time," Journal of Combinatorial Optimization, Springer, vol. 0, pages 1-13.
    2. Yin, Yunqiang & Cheng, T.C.E. & Hsu, Chou-Jung & Wu, Chin-Chia, 2013. "Single-machine batch delivery scheduling with an assignable common due window," Omega, Elsevier, vol. 41(2), pages 216-225.
    3. Hui Zhu & Min Li & Zhangjin Zhou & Yun You, 2016. "Due-window assignment and scheduling with general position-dependent processing times involving a deteriorating and compressible maintenance activity," International Journal of Production Research, Taylor & Francis Journals, vol. 54(12), pages 3475-3490, June.
    4. Yunqiang Yin & Doudou Li & Dujuan Wang & T. C. E. Cheng, 2021. "Single-machine serial-batch delivery scheduling with two competing agents and due date assignment," Annals of Operations Research, Springer, vol. 298(1), pages 497-523, March.
    5. Yang, Dar-Li & Lai, Chien-Jung & Yang, Suh-Jenq, 2014. "Scheduling problems with multiple due windows assignment and controllable processing times on a single machine," International Journal of Production Economics, Elsevier, vol. 150(C), pages 96-103.
    6. Yunqiang Yin & Yongjian Yang & Dujuan Wang & T.C.E. Cheng & Chin‐Chia Wu, 2018. "Integrated production, inventory, and batch delivery scheduling with due date assignment and two competing agents," Naval Research Logistics (NRL), John Wiley & Sons, vol. 65(5), pages 393-409, August.
    7. Long Zhang & Yuzhong Zhang & Qingguo Bai, 2019. "Two-stage medical supply chain scheduling with an assignable common due window and shelf life," Journal of Combinatorial Optimization, Springer, vol. 37(1), pages 319-329, January.
    8. Janiak, Adam & Janiak, Władysław A. & Krysiak, Tomasz & Kwiatkowski, Tomasz, 2015. "A survey on scheduling problems with due windows," European Journal of Operational Research, Elsevier, vol. 242(2), pages 347-357.
    9. Min Ji & Xin Zhang & Xiaoying Tang & T.C.E. Cheng & Guiyi Wei & Yuanyuan Tan, 2016. "Group scheduling with group-dependent multiple due windows assignment," International Journal of Production Research, Taylor & Francis Journals, vol. 54(4), pages 1244-1256, February.
    10. Ullrich, Christian A., 2013. "Integrated machine scheduling and vehicle routing with time windows," European Journal of Operational Research, Elsevier, vol. 227(1), pages 152-165.
    11. Gordon, Valery & Proth, Jean-Marie & Chu, Chengbin, 2002. "A survey of the state-of-the-art of common due date assignment and scheduling research," European Journal of Operational Research, Elsevier, vol. 139(1), pages 1-25, May.
    12. Xinyu Sun & Xin-Na Geng & Tao Liu, 2020. "Due-window assignment scheduling in the proportionate flow shop setting," Annals of Operations Research, Springer, vol. 292(1), pages 113-131, September.
    13. Cheng, T.C.E. & Yang, Suh-Jenq & Yang, Dar-Li, 2012. "Common due-window assignment and scheduling of linear time-dependent deteriorating jobs and a deteriorating maintenance activity," International Journal of Production Economics, Elsevier, vol. 135(1), pages 154-161.
    14. Chen, Zhi-Long & Lee, Chung-Yee, 2002. "Parallel machine scheduling with a common due window," European Journal of Operational Research, Elsevier, vol. 136(3), pages 512-527, February.
    15. Wang, Guoqing & Cheng, T. C. Edwin, 2000. "Parallel machine scheduling with batch delivery costs," International Journal of Production Economics, Elsevier, vol. 68(2), pages 177-183, November.
    16. Chang, Yung-Chia & Lee, Chung-Yee, 2004. "Machine scheduling with job delivery coordination," European Journal of Operational Research, Elsevier, vol. 158(2), pages 470-487, October.
    17. Zhi-Long Chen, 1997. "Scheduling with batch setup times and earliness-tardiness penalties," European Journal of Operational Research, Elsevier, vol. 96(3), pages 518-537, February.
    18. Li, Gang & Wang, Xiao-Yuan & Wang, Ji-Bo & Sun, Lin-Yan, 2013. "Worst case analysis of flow shop scheduling problems with a time-dependent learning effect," International Journal of Production Economics, Elsevier, vol. 142(1), pages 98-104.
    19. Maliheh Ganji & Rahmat Rabet & Seyed Mojtaba Sajadi, 2022. "A new coordinating model for green supply chain and batch delivery scheduling with satisfaction customers," Environment, Development and Sustainability: A Multidisciplinary Approach to the Theory and Practice of Sustainable Development, Springer, vol. 24(4), pages 4566-4601, April.
    20. Guruprasad Pundoor & Zhi‐Long Chen, 2005. "Scheduling a production–distribution system to optimize the tradeoff between delivery tardiness and distribution cost," Naval Research Logistics (NRL), John Wiley & Sons, vol. 52(6), pages 571-589, September.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:spr:jcomop:v:44:y:2022:i:4:d:10.1007_s10878-020-00594-0. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Sonal Shukla or Springer Nature Abstracting and Indexing (email available below). General contact details of provider: http://www.springer.com .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.