IDEAS home Printed from https://ideas.repec.org/a/sae/risrel/v232y2018i2p174-184.html
   My bibliography  Save this article

Realistic modelling of flexibility and dependence in production systems in Industry 4.0 for analysing their productivity and availability

Author

Listed:
  • Fei Long
  • Peter Zeiler
  • Bernd Bertsche

Abstract

Industry 4.0 offers a new opportunity to realize flexible and efficient production. Through modelling the production systems in Industry 4.0, potential delays, interrupts and defaults could be prognosticated and treated on time. Consequently, the productivity and efficiency of production systems can be enhanced. Flexibility has a far-reaching impact on the design of production systems in Industry 4.0 and is still a challenge in the modelling yet. In order to achieve realistic results, dependence must also be taken into account. In this article, a concept of flexible production system in Industry 4.0 is first presented. Then, two models of extended coloured stochastic Petri nets are built and simulated using a software REALIST to investigate the features of flexibility and dependence in production systems in Industry 4.0. As a result, the productivity and availability of production systems are analysed and discussed in the end.

Suggested Citation

  • Fei Long & Peter Zeiler & Bernd Bertsche, 2018. "Realistic modelling of flexibility and dependence in production systems in Industry 4.0 for analysing their productivity and availability," Journal of Risk and Reliability, , vol. 232(2), pages 174-184, April.
  • Handle: RePEc:sae:risrel:v:232:y:2018:i:2:p:174-184
    DOI: 10.1177/1748006X17731938
    as

    Download full text from publisher

    File URL: https://journals.sagepub.com/doi/10.1177/1748006X17731938
    Download Restriction: no

    File URL: https://libkey.io/10.1177/1748006X17731938?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    References listed on IDEAS

    as
    1. Arnoud De Meyer & Jinichiro Nakane & Jeffrey G. Miller & Kasra Ferdows, 1989. "Flexibility: The next competitive battle the manufacturing futures survey," Strategic Management Journal, Wiley Blackwell, vol. 10(2), pages 135-144, March.
    2. Gupta, Yash P. & Somers, Toni M., 1992. "The measurement of manufacturing flexibility," European Journal of Operational Research, Elsevier, vol. 60(2), pages 166-182, July.
    Full references (including those not matched with items on IDEAS)

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Álvarez, María José, 1993. "Capital budgeting and flexible manufacturing," DEE - Working Papers. Business Economics. WB 7080, Universidad Carlos III de Madrid. Departamento de Economía de la Empresa.
    2. Enrico Teich & Thorsten Claus, 2017. "Measurement of Load and Capacity Flexibility in Manufacturing," Global Journal of Flexible Systems Management, Springer;Global Institute of Flexible Systems Management, vol. 18(4), pages 291-302, December.
    3. Shivam Gupta & Vinayak A. Drave & Surajit Bag & Zongwei Luo, 2019. "Leveraging Smart Supply Chain and Information System Agility for Supply Chain Flexibility," Information Systems Frontiers, Springer, vol. 21(3), pages 547-564, June.
    4. Ahmed Abdel‐Maksoud & Wagdy Abdallah & Mayada Youssef, 2012. "An empirical study of the influence of intensity of competition on the deployment of contemporary management accounting practices and managerial techniques in Egyptian firms," Journal of Economic and Administrative Sciences, Emerald Group Publishing Limited, vol. 28(2), pages 84-97, February.
    5. Llorens, F. Javier & Molina, Luis M. & Verdu, Antonio J., 2005. "Flexibility of manufacturing systems, strategic change and performance," International Journal of Production Economics, Elsevier, vol. 98(3), pages 273-289, December.
    6. QiJie Xiao, 2018. "Control or Autonomy? A Case Study of two Organizational Forms in the Zhangjiakou Internal Migrant Organization," Public Organization Review, Springer, vol. 18(2), pages 207-221, June.
    7. Jain, Vineet & Raj, Tilak, 2016. "Modeling and analysis of FMS performance variables by ISM, SEM and GTMA approach," International Journal of Production Economics, Elsevier, vol. 171(P1), pages 84-96.
    8. Sorin Tuluca & Piotr Stalinski, 2004. "The Manufacturing Flexibility to Switch Products: Valuation and Optimal Strategy," Computing in Economics and Finance 2004 292, Society for Computational Economics.
    9. Garavelli, A. Claudio, 2003. "Flexibility configurations for the supply chain management," International Journal of Production Economics, Elsevier, vol. 85(2), pages 141-153, August.
    10. Simon Alcouffe, 2002. "La Diffusion De L'Abc En France : Une Etude Empirique Utilisant La Theorie De La Diffusion Des Innovations," Post-Print halshs-00584420, HAL.
    11. Alcorta, Ludovico, 1995. "New Technologies, Scale and Scope, and Location of Production in Developing Countries," UNU-INTECH Discussion Paper Series 1995-02, United Nations University - INTECH.
    12. Avella, Lucía & Fernández, Esteban & Vázquez, Camilo J., 1999. "The large Spanish industrial company: strategies of the most competitive factories," Omega, Elsevier, vol. 27(5), pages 497-514, October.
    13. Sana, Shib Sankar, 2010. "A production-inventory model in an imperfect production process," European Journal of Operational Research, Elsevier, vol. 200(2), pages 451-464, January.
    14. Tamayo-Torres, Javier & Gutierrez-Gutierrez, Leopoldo & Ruiz-Moreno, Antonia, 2014. "The relationship between exploration and exploitation strategies, manufacturing flexibility and organizational learning: An empirical comparison between Non-ISO and ISO certified firms," European Journal of Operational Research, Elsevier, vol. 232(1), pages 72-86.
    15. Raturi, Amitabh S. & Jack, Eric P., 2004. "Creating a volume-flexible firm," Business Horizons, Elsevier, vol. 47(6), pages 69-78.
    16. Pradeep Kumar & Sasadhar Bera & Tanusree Dutta & Shibashish Chakraborty, 2018. "Auxiliary Flexibility in Healthcare Delivery System: An Integrative Framework and Implications," Global Journal of Flexible Systems Management, Springer;Global Institute of Flexible Systems Management, vol. 19(2), pages 173-186, June.
    17. Pereira, Javier & Paulre, Bernard, 2001. "Flexibility in manufacturing systems: A relational and a dynamic approach," European Journal of Operational Research, Elsevier, vol. 130(1), pages 70-82, April.
    18. Linder, Christian, 2019. "Customer orientation and operations: The role of manufacturing capabilities in small- and medium-sized enterprises," International Journal of Production Economics, Elsevier, vol. 216(C), pages 105-117.
    19. Paul S. Adler & Barbara Goldoftas & David I. Levine, 1999. "Flexibility Versus Efficiency? A Case Study of Model Changeovers in the Toyota Production System," Organization Science, INFORMS, vol. 10(1), pages 43-68, February.
    20. Parker, Rodney P. & Wirth, Andrew, 1999. "Manufacturing flexibility: Measures and relationships," European Journal of Operational Research, Elsevier, vol. 118(3), pages 429-449, November.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:sae:risrel:v:232:y:2018:i:2:p:174-184. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: SAGE Publications (email available below). General contact details of provider: .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.