IDEAS home Printed from https://ideas.repec.org/a/pal/jorsoc/v59y2008i12d10.1057_palgrave.jors.2602513.html
   My bibliography  Save this article

Model for imperfect age-based preventive maintenance with age reduction

Author

Listed:
  • S El-Ferik

    (King Fahd University of Petroleum and Minerals)

  • M Ben-Daya

    (King Fahd University of Petroleum and Minerals)

Abstract

The effect of ageing on the deterioration rate of most repairable systems cannot be ignored. Preventive maintenance (PM) is performed in the hope of restoring fully the performance of these systems. However, in most practical cases, PM activities will be only able to restore part of the performance. Bridging the gap between theory and practice in this area requires realistic modelling of the effect of PM activities on the failure characteristics of maintainable systems. Several sequential PM models have been developed for predetermined PM interval policies but much less effort has been devoted to age-based ones. The purpose of this paper is to develop an age-based model for imperfect PM. The proposed model incorporates adjustment factor in the effective age of the system. The system undergoes PM either at failure or after a predetermined time interval whichever of them occurs first. After a certain number of such PMs, the system is replaced. The problem is to determine both the optimal number of PMs and the optimal PM's schedule that minimize the total long-term expected cost rate. Model analysis relating to the existence and uniqueness of the optimal solutions is provided. Numerical examples are presented to study the sensitivity of the model to different cost function's factors and to illustrate the use of the algorithm.

Suggested Citation

  • S El-Ferik & M Ben-Daya, 2008. "Model for imperfect age-based preventive maintenance with age reduction," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 59(12), pages 1644-1651, December.
  • Handle: RePEc:pal:jorsoc:v:59:y:2008:i:12:d:10.1057_palgrave.jors.2602513
    DOI: 10.1057/palgrave.jors.2602513
    as

    Download full text from publisher

    File URL: http://link.springer.com/10.1057/palgrave.jors.2602513
    File Function: Abstract
    Download Restriction: Access to full text is restricted to subscribers.

    File URL: https://libkey.io/10.1057/palgrave.jors.2602513?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Lai, K. K. & Leung, Francis K. N. & Tao, B. & Wang, S. Y., 2000. "Practices of preventive maintenance and replacement for engines: A case study," European Journal of Operational Research, Elsevier, vol. 124(2), pages 294-306, July.
    2. Pham, Hoang & Wang, Hongzhou, 1996. "Imperfect maintenance," European Journal of Operational Research, Elsevier, vol. 94(3), pages 425-438, November.
    3. D. G. Nguyen & D. N. P. Murthy, 1981. "Optimal Preventive Maintenance Policies for Repairable Systems," Operations Research, INFORMS, vol. 29(6), pages 1181-1194, December.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Nguyen, Dinh Tuan & Dijoux, Yann & Fouladirad, Mitra, 2017. "Analytical properties of an imperfect repair model and application in preventive maintenance scheduling," European Journal of Operational Research, Elsevier, vol. 256(2), pages 439-453.
    2. Kurt, Murat & Kharoufeh, Jeffrey P., 2010. "Optimally maintaining a Markovian deteriorating system with limited imperfect repairs," European Journal of Operational Research, Elsevier, vol. 205(2), pages 368-380, September.
    3. Wu, Jun & Xie, Min & Adam Ng, Tsan Sheng, 2011. "On a general periodic preventive maintenance policy incorporating warranty contracts and system ageing losses," International Journal of Production Economics, Elsevier, vol. 129(1), pages 102-110, January.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. El-Ferik, Sami, 2008. "Economic production lot-sizing for an unreliable machine under imperfect age-based maintenance policy," European Journal of Operational Research, Elsevier, vol. 186(1), pages 150-163, April.
    2. Kurt, Murat & Kharoufeh, Jeffrey P., 2010. "Optimally maintaining a Markovian deteriorating system with limited imperfect repairs," European Journal of Operational Research, Elsevier, vol. 205(2), pages 368-380, September.
    3. Aghezzaf, El-Houssaine & Khatab, Abdelhakim & Tam, Phuoc Le, 2016. "Optimizing production and imperfect preventive maintenance planning׳s integration in failure-prone manufacturing systems," Reliability Engineering and System Safety, Elsevier, vol. 145(C), pages 190-198.
    4. Huang, Yeu-Shiang & Gau, Wei-Yo & Ho, Jyh-Wen, 2015. "Cost analysis of two-dimensional warranty for products with periodic preventive maintenance," Reliability Engineering and System Safety, Elsevier, vol. 134(C), pages 51-58.
    5. Marais, Karen B. & Saleh, Joseph H., 2009. "Beyond its cost, the value of maintenance: An analytical framework for capturing its net present value," Reliability Engineering and System Safety, Elsevier, vol. 94(2), pages 644-657.
    6. Wang, Hongzhou, 2002. "A survey of maintenance policies of deteriorating systems," European Journal of Operational Research, Elsevier, vol. 139(3), pages 469-489, June.
    7. Lin, Zu-Liang & Huang, Yeu-Shiang & Fang, Chih-Chiang, 2015. "Non-periodic preventive maintenance with reliability thresholds for complex repairable systems," Reliability Engineering and System Safety, Elsevier, vol. 136(C), pages 145-156.
    8. Xiang, Yisha, 2013. "Joint optimization of X¯ control chart and preventive maintenance policies: A discrete-time Markov chain approach," European Journal of Operational Research, Elsevier, vol. 229(2), pages 382-390.
    9. Izquierdo, J. & Márquez, A. Crespo & Uribetxebarria, J. & Erguido, A., 2020. "On the importance of assessing the operational context impact on maintenance management for life cycle cost of wind energy projects," Renewable Energy, Elsevier, vol. 153(C), pages 1100-1110.
    10. Seyed Habib A. Rahmati & Abbas Ahmadi & Kannan Govindan, 2018. "A novel integrated condition-based maintenance and stochastic flexible job shop scheduling problem: simulation-based optimization approach," Annals of Operations Research, Springer, vol. 269(1), pages 583-621, October.
    11. Guo R. & Ascher H. & Love E., 2001. "Towards Practical and Synthetical Modelling of Repairable Systems," Stochastics and Quality Control, De Gruyter, vol. 16(1), pages 147-182, January.
    12. Adkins, Roger & Paxson, Dean, 2017. "Replacement decisions with multiple stochastic values and depreciation," European Journal of Operational Research, Elsevier, vol. 257(1), pages 174-184.
    13. Raouf, BOUCEKKINE & Blanca, MARTINEZ & Cagri, SAGLAM, 2006. "Capital Maintenance Vs Technology Adopton under Embodied Technical Progress," Discussion Papers (ECON - Département des Sciences Economiques) 2006030, Université catholique de Louvain, Département des Sciences Economiques.
    14. Dewan, Isha & Dijoux, Yann, 2015. "Modelling repairable systems with an early life under competing risks and asymmetric virtual age," Reliability Engineering and System Safety, Elsevier, vol. 144(C), pages 215-224.
    15. Zhengxin Zhang & Xiaosheng Si & Changhua Hu & Xiangyu Kong, 2015. "Degradation modeling–based remaining useful life estimation: A review on approaches for systems with heterogeneity," Journal of Risk and Reliability, , vol. 229(4), pages 343-355, August.
    16. Xiao, Lei & Zhang, Xinghui & Tang, Junxuan & Zhou, Yaqin, 2020. "Joint optimization of opportunistic maintenance and production scheduling considering batch production mode and varying operational conditions," Reliability Engineering and System Safety, Elsevier, vol. 202(C).
    17. Jackson, Canek & Pascual, Rodrigo, 2008. "Optimal maintenance service contract negotiation with aging equipment," European Journal of Operational Research, Elsevier, vol. 189(2), pages 387-398, September.
    18. Bebbington, Mark & Lai, Chin-Diew & Zitikis, RiÄ ardas, 2009. "Balancing burn-in and mission times in environments with catastrophic and repairable failures," Reliability Engineering and System Safety, Elsevier, vol. 94(8), pages 1314-1321.
    19. Wang, Ling & Xu, Hong & Yuan, Hua & Zhao, Wenjie & Chen, Xiai, 2015. "Optimizing the re-profiling strategy of metro wheels based on a data-driven wear model," European Journal of Operational Research, Elsevier, vol. 242(3), pages 975-986.
    20. Belyi, Dmitriy & Popova, Elmira & Morton, David P. & Damien, Paul, 2017. "Bayesian failure-rate modeling and preventive maintenance optimization," European Journal of Operational Research, Elsevier, vol. 262(3), pages 1085-1093.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:pal:jorsoc:v:59:y:2008:i:12:d:10.1057_palgrave.jors.2602513. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Sonal Shukla or Springer Nature Abstracting and Indexing (email available below). General contact details of provider: http://www.palgrave-journals.com/ .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.