IDEAS home Printed from https://ideas.repec.org/a/pal/jorsoc/v54y2003i8d10.1057_palgrave.jors.2601582.html
   My bibliography  Save this article

Economic optimization of off-line inspection with inspection errors

Author

Listed:
  • S H Sheu

    (National Taiwan University of Science & Technology)

  • Y C Chen

    (National Taiwan University of Science & Technology)

  • W Y Wang

    (Tung Nan Institute of Technology)

  • N H Shin

    (National Pingtung Institute of Commerce)

Abstract

In this paper, we find the optimal inspection policy for the production process of a finite batch of items with inspection errors. We study the effects of inspection errors on the optimal solution and determine which unit should be inspected to minimize the expected total costs. We also find the expected number of inspections for a given batch size. Comparisons of total costs are investigated numerically among the cost minimizing policy, the policy of perfect information, and the policy of zero-defects.

Suggested Citation

  • S H Sheu & Y C Chen & W Y Wang & N H Shin, 2003. "Economic optimization of off-line inspection with inspection errors," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 54(8), pages 888-895, August.
  • Handle: RePEc:pal:jorsoc:v:54:y:2003:i:8:d:10.1057_palgrave.jors.2601582
    DOI: 10.1057/palgrave.jors.2601582
    as

    Download full text from publisher

    File URL: http://link.springer.com/10.1057/palgrave.jors.2601582
    File Function: Abstract
    Download Restriction: Access to full text is restricted to subscribers.

    File URL: https://libkey.io/10.1057/palgrave.jors.2601582?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Evan L. Porteus, 1990. "Note---The Impact of Inspection Delay on Process and Inspection Lot Sizing," Management Science, INFORMS, vol. 36(8), pages 999-1007, August.
    2. Refael Hassin, 1984. "A Dichotomous Search for a Geometric Random Variable," Operations Research, INFORMS, vol. 32(2), pages 423-439, April.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Ferreira, Rodrigo J.P. & de Almeida, Adiel Teixeira & Cavalcante, Cristiano A.V., 2009. "A multi-criteria decision model to determine inspection intervals of condition monitoring based on delay time analysis," Reliability Engineering and System Safety, Elsevier, vol. 94(5), pages 905-912.
    2. Hassin, Refael & Sarid, Anna, 2018. "Operations research applications of dichotomous search," European Journal of Operational Research, Elsevier, vol. 265(3), pages 795-812.
    3. Wang, Wen-Ying & Sheu, Shey-Huei & Chen, Yan-Chun & Horng, Der-Juinn, 2009. "Economic optimization of off-line inspection with rework consideration," European Journal of Operational Research, Elsevier, vol. 194(3), pages 807-813, May.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Wang, Wen-Ying & Sheu, Shey-Huei & Chen, Yan-Chun & Horng, Der-Juinn, 2009. "Economic optimization of off-line inspection with rework consideration," European Journal of Operational Research, Elsevier, vol. 194(3), pages 807-813, May.
    2. Bendavid, Illana & Herer, Yale T., 2009. "Economic optimization of off-line inspection in a process that also produces non-conforming units when in control and conforming units when out of control," European Journal of Operational Research, Elsevier, vol. 195(1), pages 139-155, May.
    3. Shoshana Anily & Abraham Grosfeld-Nir, 2006. "An Optimal Lot-Sizing and Offline Inspection Policy in the Case of Nonrigid Demand," Operations Research, INFORMS, vol. 54(2), pages 311-323, April.
    4. Yale T. Herer & Tzvi Raz, 2000. "Optimal Parallel Inspection for Finding the First Nonconforming Unit in a Batch---An Information Theoretic Approach," Management Science, INFORMS, vol. 46(6), pages 845-857, June.
    5. Abraham Grosfeld‐Nir & Eyal Cohen & Yigal Gerchak, 2007. "Production to order and off‐line inspection when the production process is partially observable," Naval Research Logistics (NRL), John Wiley & Sons, vol. 54(8), pages 845-858, December.
    6. Hassin, Refael & Sarid, Anna, 2018. "Operations research applications of dichotomous search," European Journal of Operational Research, Elsevier, vol. 265(3), pages 795-812.
    7. B C Giri & T Dohi, 2005. "Exact formulation of stochastic EMQ model for an unreliable production system," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 56(5), pages 563-575, May.
    8. Shoshana Anily & Avraham Beja & Amit Mendel, 2002. "Optimal Lot Sizes with Geometric Production Yield and Rigid Demand," Operations Research, INFORMS, vol. 50(3), pages 424-432, June.
    9. Abraham Grosfeld-Nir & Yigal Gerchak & Qi-Ming He, 2000. "Manufacturing to Order with Random Yield and Costly Inspection," Operations Research, INFORMS, vol. 48(5), pages 761-767, October.
    10. Sy-Ming Guu & Chun-Yi Lin, 2018. "The multiple lot sizing problem of a serial production system with interrupted geometric yields, rigid demand and Pentico’s heuristic," Annals of Operations Research, Springer, vol. 269(1), pages 167-183, October.
    11. Stephen M. Gilbert & Hena M Bar, 1999. "The value of observing the condition of a deteriorating machine," Naval Research Logistics (NRL), John Wiley & Sons, vol. 46(7), pages 790-808, October.
    12. Subba Rao, S. & Gunasekaran, A. & Goyal, S. K. & Martikainen, T., 1998. "Waiting line model applications in manufacturing," International Journal of Production Economics, Elsevier, vol. 54(1), pages 1-28, January.
    13. S. Andrew Starbird, 1997. "Acceptance sampling, imperfect production, and the optimality of zero defects," Naval Research Logistics (NRL), John Wiley & Sons, vol. 44(6), pages 515-530, September.
    14. Kazaz, Burak & Sloan, Thomas W., 2013. "The impact of process deterioration on production and maintenance policies," European Journal of Operational Research, Elsevier, vol. 227(1), pages 88-100.
    15. W. C. Tsai & Neng-Hui Shih & Chih-Hsiung Wang, 2018. "The effects of inspection delay and restoration cost on the optimal inspection and production policy," OPSEARCH, Springer;Operational Research Society of India, vol. 55(1), pages 187-195, March.
    16. Vickson, Raymond G. & Hassini, Elkafi, 2006. "Lot streaming for quality control in two-stage batch production," European Journal of Operational Research, Elsevier, vol. 170(3), pages 824-843, May.
    17. Yang Dong & Kefeng Xu & Sining Song, 2014. "Contracting for Quality in a Multiple-Level Global Supply Chain," Working Papers 0205mss, College of Business, University of Texas at San Antonio.
    18. Guu, Sy-Ming & Zhang, Alex X., 2003. "The finite multiple lot sizing problem with interrupted geometric yield and holding costs," European Journal of Operational Research, Elsevier, vol. 145(3), pages 635-644, March.
    19. Borrero, J.S. & Akhavan-Tabatabaei, R., 2013. "Time and inventory dependent optimal maintenance policies for single machine workstations: An MDP approach," European Journal of Operational Research, Elsevier, vol. 228(3), pages 545-555.
    20. T W Sloan, 2004. "A periodic review production and maintenance model with random demand, deteriorating equipment, and binomial yield," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 55(6), pages 647-656, June.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:pal:jorsoc:v:54:y:2003:i:8:d:10.1057_palgrave.jors.2601582. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Sonal Shukla or Springer Nature Abstracting and Indexing (email available below). General contact details of provider: http://www.palgrave-journals.com/ .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.