Advanced Search
MyIDEAS: Login to save this article or follow this journal

Competition Issues in the Electricity Sector

Contents:

Author Info

  • OECD
Registered author(s):

    Abstract

    Electricity markets are prone to the exercise of market power due to a combination of factors including: inelastic demand, lack of extensive practical storage of electricity, transmission congestion, transmission loop flows and capacity constraints coupled with diversity in the marginal costs of different types of generators. The level of market power can vary rapidly in time according to changes in transmission congestion and fluctuating load levels. Given the propensity of the electricity market to market power, horizontal structural separation (or divestiture) of the generation market is a key policy tool. Some structural separation has been carried out, but on a relatively limited scale. But congestion segments electricity markets and contributes to the exercise of generator market power. This effect can provide the incentive for building new generation capacity. So a balance must be found between providing an...

    Download Info

    If you experience problems downloading a file, check if you have the proper application to view it first. In case of further problems read the IDEAS help page. Note that these files are not on the IDEAS site. Please be patient as the files may be large.
    File URL: http://dx.doi.org/10.1787/clp-v6-art11-en
    Download Restriction: Full text available to READ online. PDF download available to OECD iLibrary subscribers.

    As the access to this document is restricted, you may want to look for a different version under "Related research" (further below) or search for a different version of it.

    Bibliographic Info

    Article provided by OECD Publishing in its journal OECD Journal: Competition Law and Policy.

    Volume (Year): 6 (2004)
    Issue (Month): 4 ()
    Pages: 81-181

    as in new window
    Handle: RePEc:oec:dafkaa:5lgmkd5v8mzt

    Contact details of provider:
    Postal: 2 rue Andre Pascal, 75775 Paris Cedex 16
    Phone: 33-(0)-1-45 24 82 00
    Fax: 33-(0)-1-45 24 85 00
    Email:
    Web page: http://www.oecd.org
    More information through EDIRC

    Order Information:
    Web: http://www.oecd.org/bookshop?16097521

    Related research

    Keywords:

    References

    No references listed on IDEAS
    You can help add them by filling out this form.

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as in new window

    Cited by:
    1. Hesamzadeh, Mohammad R. & Biggar, Darryl R. & Hosseinzadeh, Nasser, 2011. "The TC-PSI indicator for forecasting the potential for market power in wholesale electricity markets," Energy Policy, Elsevier, vol. 39(10), pages 5988-5998, October.

    Lists

    This item is not listed on Wikipedia, on a reading list or among the top items on IDEAS.

    Statistics

    Access and download statistics

    Corrections

    When requesting a correction, please mention this item's handle: RePEc:oec:dafkaa:5lgmkd5v8mzt. See general information about how to correct material in RePEc.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: ().

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If references are entirely missing, you can add them using this form.

    If the full references list an item that is present in RePEc, but the system did not link to it, you can help with this form.

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your profile, as there may be some citations waiting for confirmation.

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.