Single Machine Scheduling Problems with General Breakdowns, Earliness and Tardiness Costs

Author

Listed:
  • A. Federgruen

    (Columbia University, New York)

  • G. Mosheiov

    (Hebrew University, Jerusalem, Israel)

Abstract

In this paper we consider single machine scheduling problems with a common due-date for all jobs, arbitrary monotone earliness and tardiness costs and arbitrary breakdown and repair processes. We show that the problem is equivalent to a deterministic one without breakdowns and repairs and with an equivalent cost function of a job's completion time. A V -shaped schedule without idle times is shown to be optimal, if this equivalent cost function is quasi-convex .Conversely, we show that a V -shaped schedule may fail to be optimal if the property does not apply. We derive general conditions for the earliness and tardiness cost structure and repair and breakdown processes under which the equivalent cost function is quasi-convex . When a V -shaped schedule is optimal, an efficient (though pseudo-polynomial) algorithm can be used to compute an optimal schedule.

Suggested Citation

  • A. Federgruen & G. Mosheiov, 1997. "Single Machine Scheduling Problems with General Breakdowns, Earliness and Tardiness Costs," Operations Research, INFORMS, vol. 45(1), pages 66-71, February.
  • Handle: RePEc:inm:oropre:v:45:y:1997:i:1:p:66-71
    DOI: 10.1287/opre.45.1.66
    as

    Download full text from publisher

    File URL: http://dx.doi.org/10.1287/opre.45.1.66
    Download Restriction: no

    File URL: https://libkey.io/10.1287/opre.45.1.66?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Yarlin Kuo & Zi‐Ann Chang, 2007. "Integrated production scheduling and preventive maintenance planning for a single machine under a cumulative damage failure process," Naval Research Logistics (NRL), John Wiley & Sons, vol. 54(6), pages 602-614, September.
    2. Chen, Zhi-Long & Lee, Chung-Yee, 2002. "Parallel machine scheduling with a common due window," European Journal of Operational Research, Elsevier, vol. 136(3), pages 512-527, February.
    3. Luh, Peter B. & Liu, Feng & Moser, Bryan, 1999. "Scheduling of design projects with uncertain number of iterations," European Journal of Operational Research, Elsevier, vol. 113(3), pages 575-592, March.
    4. Sen, Tapan & Sulek, Joanne M. & Dileepan, Parthasarati, 2003. "Static scheduling research to minimize weighted and unweighted tardiness: A state-of-the-art survey," International Journal of Production Economics, Elsevier, vol. 83(1), pages 1-12, January.
    5. G Mosheiov, 2003. "Scheduling unit processing time jobs on an m-machine flow-shop," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 54(4), pages 437-441, April.
    6. Kerem Bülbül & Safia Kedad-Sidhoum & Halil Şen, 2019. "Single-machine common due date total earliness/tardiness scheduling with machine unavailability," Journal of Scheduling, Springer, vol. 22(5), pages 543-565, October.
    7. Mosheiov, Gur & Shadmon, Michal, 2001. "Minmax earliness-tardiness costs with unit processing time jobs," European Journal of Operational Research, Elsevier, vol. 130(3), pages 638-652, May.

    More about this item

    Keywords

    production/scheduling; stochastic;

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:inm:oropre:v:45:y:1997:i:1:p:66-71. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    We have no bibliographic references for this item. You can help adding them by using this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Chris Asher (email available below). General contact details of provider: https://edirc.repec.org/data/inforea.html .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.