IDEAS home Printed from https://ideas.repec.org/a/gam/jmathe/v7y2019i5p446-d232524.html
   My bibliography  Save this article

A Single-Stage Manufacturing Model with Imperfect Items, Inspections, Rework, and Planned Backorders

Author

Listed:
  • Chang Wook Kang

    (Department of Industrial and Management Engineering, ERICA Campus, Hanyang University, Ansan, Gyeonggi-do 15588, Korea)

  • Misbah Ullah

    (Department of Industrial Engineering, University of Engineering and Technology, Peshawar 25000, Pakistan)

  • Mitali Sarkar

    (Department of Industrial and Management Engineering, ERICA Campus, Hanyang University, Ansan, Gyeonggi-do 15588, Korea)

  • Muhammad Omair

    (Department of Industrial Engineering, Jalozai Campus, University of Engineering and Technology, Peshawar 25000, Pakistan)

  • Biswajit Sarkar

    (Department of Industrial and Management Engineering, ERICA Campus, Hanyang University, Ansan, Gyeonggi-do 15588, Korea)

Abstract

Each industry prefers to sell perfect products in order to maintain its brand image. However, due to a long-run single-stage production system, the industry generally obtains obstacles. To solve this issue, a single-stage manufacturing model is formulated to make a perfect production system without defective items. For this, the industry decides to stop selling any products until whole products are ready to fulfill the order quantity. Furthermore, manufacturing managers prefer product qualification from the inspection station especially when processes are imperfect. The purpose of the proposed manufacturing model considers that the customer demands are not fulfilled during the production phase due to imperfection in the process, however customers are satisfied either at the end of the inspection process or after reworking the imperfect products. Rework operation, inspection process, and planned backordering are incorporated in the proposed model. An analytical approach is utilized to optimize the lot size and planned backorder quantities based on the minimum average cost. Numerical examples are used to illustrate and compare the proposed model with previously developed models. The proposed model is considered more beneficial in comparison with the existing models as it incorporates imperfection, rework, inspection rate, and planned backorders.

Suggested Citation

  • Chang Wook Kang & Misbah Ullah & Mitali Sarkar & Muhammad Omair & Biswajit Sarkar, 2019. "A Single-Stage Manufacturing Model with Imperfect Items, Inspections, Rework, and Planned Backorders," Mathematics, MDPI, vol. 7(5), pages 1-18, May.
  • Handle: RePEc:gam:jmathe:v:7:y:2019:i:5:p:446-:d:232524
    as

    Download full text from publisher

    File URL: https://www.mdpi.com/2227-7390/7/5/446/pdf
    Download Restriction: no

    File URL: https://www.mdpi.com/2227-7390/7/5/446/
    Download Restriction: no
    ---><---

    References listed on IDEAS

    as
    1. Muhammad Omair & Biswajit Sarkar & Leopoldo Eduardo Cárdenas-Barrón, 2017. "Minimum Quantity Lubrication and Carbon Footprint: A Step towards Sustainability," Sustainability, MDPI, vol. 9(5), pages 1-18, April.
    2. Biswajit Sarkar & Kripasindhu Chaudhuri & Shib Sankar Sana, 2010. "A stock-dependent inventory model in an imperfect production process," International Journal of Procurement Management, Inderscience Enterprises Ltd, vol. 3(4), pages 361-378.
    3. Biswajit Sarkar & Shib Sankar Sana & Kripasindhu Chaudhuri, 2010. "Optimal reliability, production lot size and safety stock in an imperfect production system," International Journal of Mathematics in Operational Research, Inderscience Enterprises Ltd, vol. 2(4), pages 467-490.
    4. Sana, Shib Sankar, 2010. "A production-inventory model in an imperfect production process," European Journal of Operational Research, Elsevier, vol. 200(2), pages 451-464, January.
    5. Goyal, Suresh Kumar & Cardenas-Barron, Leopoldo Eduardo, 2002. "Note on: Economic production quantity model for items with imperfect quality - a practical approach," International Journal of Production Economics, Elsevier, vol. 77(1), pages 85-87, May.
    6. Sarker, Bhaba R. & Jamal, A.M.M. & Mondal, Sanjay, 2008. "Optimal batch sizing in a multi-stage production system with rework consideration," European Journal of Operational Research, Elsevier, vol. 184(3), pages 915-929, February.
    7. Sana, Shib Sankar, 2010. "An economic production lot size model in an imperfect production system," European Journal of Operational Research, Elsevier, vol. 201(1), pages 158-170, February.
    8. Wee, H.M. & Yu, Jonas & Chen, M.C., 2007. "Optimal inventory model for items with imperfect quality and shortage backordering," Omega, Elsevier, vol. 35(1), pages 7-11, February.
    9. Dongmin Shin & Mandeep Mittal & Biswajit Sarkar, 2018. "Effects of human errors and trade-credit financing in two-echelon supply chain models," European Journal of Industrial Engineering, Inderscience Enterprises Ltd, vol. 12(4), pages 465-503.
    10. Hu, Wan-ting & Kim, Seung-Lae & Banerjee, Avijit, 2009. "An inventory model with partial backordering and unit backorder cost linearly increasing with the waiting time," European Journal of Operational Research, Elsevier, vol. 197(2), pages 581-587, September.
    11. M Ben-Daya & M Hariga, 2000. "Economic lot scheduling problem with imperfect production processes," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 51(7), pages 875-881, July.
    12. Khan, M. & Jaber, M.Y. & Guiffrida, A.L. & Zolfaghari, S., 2011. "A review of the extensions of a modified EOQ model for imperfect quality items," International Journal of Production Economics, Elsevier, vol. 132(1), pages 1-12, July.
    13. Salameh, M. K. & Jaber, M. Y., 2000. "Economic production quantity model for items with imperfect quality," International Journal of Production Economics, Elsevier, vol. 64(1-3), pages 59-64, March.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Falguni Mahato & Chandan Mahato & Gour Chandra Mahata, 2023. "Sustainable optimal production policies for an imperfect production system with trade credit under different carbon emission regulations," Environment, Development and Sustainability: A Multidisciplinary Approach to the Theory and Practice of Sustainable Development, Springer, vol. 25(9), pages 10073-10099, September.
    2. Singa Wang Chiu & Liang-Wei You & Tsu-Ming Yeh & Tiffany Chiu, 2020. "The Collective Influence of Component Commonality, Adjustable-Rate, Postponement, and Rework on Multi-Item Manufacturing Decision," Mathematics, MDPI, vol. 8(9), pages 1-18, September.
    3. Rimi Karmakar & Sanat K. Mazumder & Md Billal Hossain & Csaba Balint Illes & Arindam Garai, 2023. "Sustainable Green Economy for a Supply Chain with Remanufacturing by Both the Supplier and Manufacturer in a Varying Market," Logistics, MDPI, vol. 7(3), pages 1-48, July.
    4. Waqas Ahmed & Muhammad Jalees & Muhammad Omair & Zainab Mukhtar & Muhammad Imran, 2022. "An inventory management for global supply chain through reworking of defective items having positive inventory level under multi-trade-credit-period," Annals of Operations Research, Springer, vol. 315(1), pages 1-28, August.
    5. Monica Aureliana Petcu & Liliana Ionescu-Feleaga & Bogdan-Ștefan Ionescu & Dumitru-Florin Moise, 2023. "A Decade for the Mathematics : Bibliometric Analysis of Mathematical Modeling in Economics, Ecology, and Environment," Mathematics, MDPI, vol. 11(2), pages 1-30, January.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Hsu, Jia-Tzer & Hsu, Lie-Fern, 2013. "An EOQ model with imperfect quality items, inspection errors, shortage backordering, and sales returns," International Journal of Production Economics, Elsevier, vol. 143(1), pages 162-170.
    2. Lie-Fern Hsu & Jia-Tzer Hsu, 2016. "Economic production quantity (EPQ) models under an imperfect production process with shortages backordered," International Journal of Systems Science, Taylor & Francis Journals, vol. 47(4), pages 852-867, March.
    3. Pal, Brojeswar & Sana, Shib Sankar & Chaudhuri, Kripasindhu, 2014. "Joint pricing and ordering policy for two echelon imperfect production inventory model with two cycles," International Journal of Production Economics, Elsevier, vol. 155(C), pages 229-238.
    4. Muhammad Tayyab & Biswajit Sarkar & Bernardo Nugroho Yahya, 2018. "Imperfect Multi-Stage Lean Manufacturing System with Rework under Fuzzy Demand," Mathematics, MDPI, vol. 7(1), pages 1-18, December.
    5. Ata Allah Taleizadeh, 2018. "A constrained integrated imperfect manufacturing-inventory system with preventive maintenance and partial backordering," Annals of Operations Research, Springer, vol. 261(1), pages 303-337, February.
    6. Sana, Shib Sankar, 2012. "A collaborating inventory model in a supply chain," Economic Modelling, Elsevier, vol. 29(5), pages 2016-2023.
    7. Bimal Kumar Sett & Bikash Koli Dey & Biswajit Sarkar, 2020. "Autonomated Inspection Policy for Smart Factory—An Improved Approach," Mathematics, MDPI, vol. 8(10), pages 1-19, October.
    8. Taleizadeh, Ata Allah & Cárdenas-Barrón, Leopoldo Eduardo & Mohammadi, Babak, 2014. "A deterministic multi product single machine EPQ model with backordering, scraped products, rework and interruption in manufacturing process," International Journal of Production Economics, Elsevier, vol. 150(C), pages 9-27.
    9. Tapan Kumar Datta, 2017. "Inventory system with defective products and investment opportunity for reducing defective proportion," Operational Research, Springer, vol. 17(1), pages 297-312, April.
    10. Sarkar, Mitali & Sarkar, Biswajit, 2013. "An economic manufacturing quantity model with probabilistic deterioration in a production system," Economic Modelling, Elsevier, vol. 31(C), pages 245-252.
    11. Mitali Sarkar & Sungjun Kim & Jihed Jemai & Baishakhi Ganguly & Biswajit Sarkar, 2019. "An Application of Time-Dependent Holding Costs and System Reliability in a Multi-Item Sustainable Economic Energy Efficient Reliable Manufacturing System," Energies, MDPI, vol. 12(15), pages 1-19, July.
    12. Taleizadeh, Ata Allah & Khanbaglo, Mahboobeh Perak Sari & Cárdenas-Barrón, Leopoldo Eduardo, 2016. "An EOQ inventory model with partial backordering and reparation of imperfect products," International Journal of Production Economics, Elsevier, vol. 182(C), pages 418-434.
    13. Nasr, Walid W. & Jaber, Mohamad Y., 2019. "Supplier development in a two-level lot sizing problem with non-conforming items and learning," International Journal of Production Economics, Elsevier, vol. 216(C), pages 349-363.
    14. Rezaei, Jafar & Salimi, Negin, 2012. "Economic order quantity and purchasing price for items with imperfect quality when inspection shifts from buyer to supplier," International Journal of Production Economics, Elsevier, vol. 137(1), pages 11-18.
    15. Prasanta Kumar Ghosh & Amalesh Kumar Manna & Jayanta Kumar Dey & Samarjit Kar, 2023. "Optimal production run in an imperfect production process with maintenance under warranty and product insurance," OPSEARCH, Springer;Operational Research Society of India, vol. 60(2), pages 720-752, June.
    16. Skouri, K. & Konstantaras, I. & Lagodimos, A.G. & Papachristos, S., 2014. "An EOQ model with backorders and rejection of defective supply batches," International Journal of Production Economics, Elsevier, vol. 155(C), pages 148-154.
    17. R. Uthayakumar & M. Rameswari, 2012. "An Economic Production Quantity Model for Defective Items with Trapezoidal type Demand Rate," Journal of Optimization Theory and Applications, Springer, vol. 154(3), pages 1055-1079, September.
    18. Waseem Sajjad & Misbah Ullah & Razaullah Khan & Mubashir Hayat, 2022. "Developing a Comprehensive Shipment Policy through Modified EPQ Model Considering Process Imperfections, Transportation Cost, and Backorders," Logistics, MDPI, vol. 6(3), pages 1-20, June.
    19. Manoranjan De & Barun Das & Manoranjan Maiti, 2016. "EPL models for complementary and substitute items under imperfect production process with promotional cost and selling price dependent demands," OPSEARCH, Springer;Operational Research Society of India, vol. 53(2), pages 259-277, June.
    20. Tien-Yu Lin & Kuo-Lung Hou, 2015. "An imperfect quality economic order quantity with advanced receiving," TOP: An Official Journal of the Spanish Society of Statistics and Operations Research, Springer;Sociedad de Estadística e Investigación Operativa, vol. 23(2), pages 535-551, July.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:gam:jmathe:v:7:y:2019:i:5:p:446-:d:232524. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: MDPI Indexing Manager (email available below). General contact details of provider: https://www.mdpi.com .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.