IDEAS home Printed from https://ideas.repec.org/a/eee/proeco/v118y2009i1p339-351.html
   My bibliography  Save this article

Approximate evaluation of order fill rates for an inventory system of service tools

Author

Listed:
  • Vliegen, I.M.H.
  • van Houtum, G.J.

Abstract

This paper deals with the analysis of a single-location, multi-item inventory model for service tools, in which coupled demands and coupled returns occur. We distinguish multiple Poisson demand streams. Per stream there is a given set of tools that is requested per demand. We are interested in the order fill rates, i.e., the percentage of demands for which all requested tools are delivered from stock. Requested tools that are not on stock are delivered via an emergency channel. For the warehouse under consideration, they may be considered as lost sales. Delivered tools are returned to the warehouse after a deterministic return time, that is equal for all tools. We show that the full multi-item evaluation problem decomposes into evaluation problems for small sets of service tools. For the resulting subproblems, we develop three approximate models for the order fill rates, which are all based on Markovian models. One approximate model has appeared to give an underestimation in all computational tests, while the second approximate model has led to an overestimation in all instances tested. The last approximate model combines the other two. This approximate model is very accurate and can be computed efficiently for representative instances based on data from an Original Equipment Manufacturer with whom we collaborated for this research.

Suggested Citation

  • Vliegen, I.M.H. & van Houtum, G.J., 2009. "Approximate evaluation of order fill rates for an inventory system of service tools," International Journal of Production Economics, Elsevier, vol. 118(1), pages 339-351, March.
  • Handle: RePEc:eee:proeco:v:118:y:2009:i:1:p:339-351
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0925-5273(08)00282-X
    Download Restriction: Full text for ScienceDirect subscribers only
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. John W. Mamer & Stephen A. Smith, 1982. "Optimizing Field Repair Kits Based on Job Completion Rate," Management Science, INFORMS, vol. 28(11), pages 1328-1333, November.
    2. Jing-Sheng Song & Susan H. Xu & Bin Liu, 1999. "Order-Fulfillment Performance Measures in an Assemble-to-Order System with Stochastic Leadtimes," Operations Research, INFORMS, vol. 47(1), pages 131-149, February.
    3. John W. Mamer & Stephen A. Smith, 1985. "Job Completion Based Inventory Systems: Optimal Policies for Repair Kits and Spare Machines," Management Science, INFORMS, vol. 31(6), pages 703-718, June.
    4. Shelby Brumelle & Daniel Granot, 1993. "The Repair Kit Problem Revisited," Operations Research, INFORMS, vol. 41(5), pages 994-1006, October.
    5. Isabelle Huault & V. Perret & S. Charreire-Petit, 2007. "Management," Post-Print halshs-00337676, HAL.
    6. H Wong & G J van Houtum & D Cattrysse & D Van Oudheusden, 2005. "Simple, efficient heuristics for multi-item multi-location spare parts systems with lateral transshipments and waiting time constraints," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 56(12), pages 1419-1430, December.
    7. John W. Mamer & Andrew W. Shogan, 1987. "A Constrained Capital Budgeting Problem with Applications to Repair Kit Selection," Management Science, INFORMS, vol. 33(6), pages 800-806, June.
    8. Kennedy, W. J. & Wayne Patterson, J. & Fredendall, Lawrence D., 2002. "An overview of recent literature on spare parts inventories," International Journal of Production Economics, Elsevier, vol. 76(2), pages 201-215, March.
    9. Savas Dayanik & Jing-Sheng Song & Susan H. Xu, 2003. "The Effectiveness of Several Performance Bounds for Capacitated Production, Partial-Order-Service, Assemble-to-Order Systems," Manufacturing & Service Operations Management, INFORMS, vol. 5(3), pages 230-251, December.
    10. Kranenburg, A.A. & Van Houtum, G.J., 2007. "Effect of commonality on spare parts provisioning costs for capital goods," International Journal of Production Economics, Elsevier, vol. 108(1-2), pages 221-227, July.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Ana Bušić & Ingrid Vliegen & Alan Scheller-Wolf, 2012. "Comparing Markov Chains: Aggregation and Precedence Relations Applied to Sets of States, with Applications to Assemble-to-Order Systems," Mathematics of Operations Research, INFORMS, vol. 37(2), pages 259-287, May.
    2. Güllü, Refik & Köksalan, Murat, 2013. "A model for performance evaluation and stock optimization in a kit management problem," International Journal of Production Economics, Elsevier, vol. 143(2), pages 527-535.
    3. Vliegen, I.M.H. & Kleingeld, P.A.M. & van Houtum, G.J., 2010. "Separate tools or tool kits: An exploratory study of engineers' preferences," International Journal of Production Economics, Elsevier, vol. 125(1), pages 173-184, May.
    4. Hoen, K.M.R. & Güllü, R. & van Houtum, G.J. & Vliegen, I.M.H., 2011. "A simple and accurate approximation for the order fill rates in lost-sales Assemble-to-Order systems," International Journal of Production Economics, Elsevier, vol. 133(1), pages 95-104, September.
    5. Rahimi-Ghahroodi, S. & Al Hanbali, A. & Vliegen, I.M.H. & Cohen, M.A., 2019. "Joint optimization of spare parts inventory and service engineers staffing with full backlogging," International Journal of Production Economics, Elsevier, vol. 212(C), pages 39-50.
    6. Willem van Jaarsveld & Alan Scheller-Wolf, 2015. "Optimization of Industrial-Scale Assemble-to-Order Systems," INFORMS Journal on Computing, INFORMS, vol. 27(3), pages 544-560, August.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Vliegen, I.M.H. & Kleingeld, P.A.M. & van Houtum, G.J., 2010. "Separate tools or tool kits: An exploratory study of engineers' preferences," International Journal of Production Economics, Elsevier, vol. 125(1), pages 173-184, May.
    2. Rahimi-Ghahroodi, S. & Al Hanbali, A. & Vliegen, I.M.H. & Cohen, M.A., 2019. "Joint optimization of spare parts inventory and service engineers staffing with full backlogging," International Journal of Production Economics, Elsevier, vol. 212(C), pages 39-50.
    3. Christoph Rippe & Gudrun P. Kiesmüller, 2023. "The added value of advance demand information for the planning of a repair kit," Central European Journal of Operations Research, Springer;Slovak Society for Operations Research;Hungarian Operational Research Society;Czech Society for Operations Research;Österr. Gesellschaft für Operations Research (ÖGOR);Slovenian Society Informatika - Section for Operational Research;Croatian Operational Research Society, vol. 31(1), pages 311-335, March.
    4. Rippe, Christoph & Kiesmüller, Gudrun P., 2023. "The repair kit problem with imperfect advance demand information," European Journal of Operational Research, Elsevier, vol. 304(2), pages 558-576.
    5. Rachel Q. Zhang, 1999. "Expected time delay in multi‐item inventory systems with correlated demands," Naval Research Logistics (NRL), John Wiley & Sons, vol. 46(6), pages 671-688, September.
    6. Hoen, K.M.R. & Güllü, R. & van Houtum, G.J. & Vliegen, I.M.H., 2011. "A simple and accurate approximation for the order fill rates in lost-sales Assemble-to-Order systems," International Journal of Production Economics, Elsevier, vol. 133(1), pages 95-104, September.
    7. Prak, Dennis & Saccani, Nicola & Syntetos, Aris & Teunter, Ruud & Visintin, Filippo, 2017. "The Repair Kit Problem with positive replenishment lead times and fixed ordering costs," European Journal of Operational Research, Elsevier, vol. 261(3), pages 893-902.
    8. Liu, Ke & Li, Jing-An & Lai, Kin Keung, 2004. "Single period, single product newsvendor model with random supply shock," European Journal of Operational Research, Elsevier, vol. 158(3), pages 609-625, November.
    9. Michael F. Gorman & Sanjay Ahire, 2006. "A Major Appliance Manufacturer Rethinks Its Inventory Policies for Service Vehicles," Interfaces, INFORMS, vol. 36(5), pages 407-419, October.
    10. Jing-Sheng Song, 1998. "On the Order Fill Rate in a Multi-Item, Base-Stock Inventory System," Operations Research, INFORMS, vol. 46(6), pages 831-845, December.
    11. Teunter, Ruud H. & Klein Haneveld, Willem K., 2002. "Inventory control of service parts in the final phase: A central depot and repair kits," European Journal of Operational Research, Elsevier, vol. 138(1), pages 76-86, April.
    12. S. Rahimi-Ghahroodi & A. Al Hanbali & W. H. M. Zijm & J. K. W. Ommeren & A. Sleptchenko, 2017. "Integrated planning of spare parts and service engineers with partial backlogging," OR Spectrum: Quantitative Approaches in Management, Springer;Gesellschaft für Operations Research e.V., vol. 39(3), pages 711-748, July.
    13. Heeremans, D. & Gelders, L. F., 1995. "Multiple period repair kit problem with a job completion criterion: A case study," European Journal of Operational Research, Elsevier, vol. 81(2), pages 239-248, March.
    14. K Liu & J-A Li & Y Wu & K K Lai, 2005. "Analysis of monitoring and limiting of commercial cheating: a newsvendor model," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 56(7), pages 844-854, July.
    15. Kathryn E. Caggiano & Peter L. Jackson & John A. Muckstadt & James A. Rappold, 2007. "Optimizing Service Parts Inventory in a Multiechelon, Multi-Item Supply Chain with Time-Based Customer Service-Level Agreements," Operations Research, INFORMS, vol. 55(2), pages 303-318, April.
    16. Stephen A. Smith & Narendra Agrawal, 2000. "Management of Multi-Item Retail Inventory Systems with Demand Substitution," Operations Research, INFORMS, vol. 48(1), pages 50-64, February.
    17. Christiane B. Haubitz & Ulrich W. Thonemann, 2021. "How to Change a Running System—Controlling the Transition to Optimized Spare Parts Inventory Policies," Production and Operations Management, Production and Operations Management Society, vol. 30(5), pages 1386-1405, May.
    18. Gao, Chunyan & Shen, Houcai & Cheng, T.C.E., 2010. "Order-fulfillment performance analysis of an assemble-to-order system with unreliable machines," International Journal of Production Economics, Elsevier, vol. 126(2), pages 341-349, August.
    19. Fritzsche, R., 2012. "Cost adjustment for single item pooling models using a dynamic failure rate: A calculation for the aircraft industry," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 48(6), pages 1065-1079.
    20. Yao Zhao & David Simchi-Levi, 2006. "Performance Analysis and Evaluation of Assemble-to-Order Systems with Stochastic Sequential Lead Times," Operations Research, INFORMS, vol. 54(4), pages 706-724, August.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:proeco:v:118:y:2009:i:1:p:339-351. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/ijpe .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.