IDEAS home Printed from https://ideas.repec.org/a/eee/proeco/v111y2008i1p118-128.html
   My bibliography  Save this article

Minimax distribution free procedure with backorder price discount

Author

Listed:
  • Lin, Yu-Jen

Abstract

No abstract is available for this item.

Suggested Citation

  • Lin, Yu-Jen, 2008. "Minimax distribution free procedure with backorder price discount," International Journal of Production Economics, Elsevier, vol. 111(1), pages 118-128, January.
  • Handle: RePEc:eee:proeco:v:111:y:2008:i:1:p:118-128
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0925-5273(07)00011-4
    Download Restriction: Full text for ScienceDirect subscribers only
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Ouyang, Liang-Yuh & Chang, Hung-Chi, 2002. "A minimax distribution free procedure for mixed inventory models involving variable lead time with fuzzy lost sales," International Journal of Production Economics, Elsevier, vol. 76(1), pages 1-12, March.
    2. Silver, Edward A. & Moon, Ilkyeong, 2001. "The multi-item single period problem with an initial stock of convertible units," European Journal of Operational Research, Elsevier, vol. 132(2), pages 466-477, July.
    3. Ouyang, Liang-Yuh & Wu, Kun-Shan & Ho, Chia-Huei, 2004. "Integrated vendor-buyer cooperative models with stochastic demand in controllable lead time," International Journal of Production Economics, Elsevier, vol. 92(3), pages 255-266, December.
    4. L-Y Ouyang & C-K Chen & H-C Chang, 1999. "Lead time and ordering cost reductions in continuous review inventory systems with partial backorders," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 50(12), pages 1272-1279, December.
    5. I Moon & E A Silver, 2000. "The multi-item newsvendor problem with a budget constraint and fixed ordering costs," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 51(5), pages 602-608, May.
    6. Moon, Ilkyeong & Choi, Sangjin, 1997. "Distribution free procedures for make-to-order (MTO), make-in-advance (MIA), and composite policies," International Journal of Production Economics, Elsevier, vol. 48(1), pages 21-28, January.
    7. Hariga, Moncer & Ben-Daya, Mohamed, 1999. "Some stochastic inventory models with deterministic variable lead time," European Journal of Operational Research, Elsevier, vol. 113(1), pages 42-51, February.
    8. Ouyang, Liang-Yuh & Wu, Kun-Shan, 1998. "A minimax distribution free procedure for mixed inventory model with variable lead time," International Journal of Production Economics, Elsevier, vol. 56(1), pages 511-516, September.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Qiu, Ruozhen & Shang, Jennifer & Huang, Xiaoyuan, 2014. "Robust inventory decision under distribution uncertainty: A CVaR-based optimization approach," International Journal of Production Economics, Elsevier, vol. 153(C), pages 13-23.
    2. Ying Gao & Jianteng Xu & Huixin Xu, 2021. "A Flexible Cap-and-Trade Policy and Limited Demand Information Effects on a Sustainable Supply Chain," Sustainability, MDPI, vol. 13(19), pages 1-23, September.
    3. Bimal Kumar Sett & Bikash Koli Dey & Biswajit Sarkar, 2020. "The Effect of O2O Retail Service Quality in Supply Chain Management," Mathematics, MDPI, vol. 8(10), pages 1-36, October.
    4. Haider Ali & Reshma Nasreen & Neetu Arneja & Chandra K. Jaggi, 2023. "Optimization of a periodically assessing model with manageable lead time under SLC with back order rebate for deteriorating items," International Journal of System Assurance Engineering and Management, Springer;The Society for Reliability, Engineering Quality and Operations Management (SREQOM),India, and Division of Operation and Maintenance, Lulea University of Technology, Sweden, vol. 14(1), pages 241-266, February.
    5. Qiu, Ruozhen & Sun, Minghe & Lim, Yun Fong, 2017. "Optimizing (s, S) policies for multi-period inventory models with demand distribution uncertainty: Robust dynamic programing approaches," European Journal of Operational Research, Elsevier, vol. 261(3), pages 880-892.
    6. Hsien-Jen Lin, 2015. "A stochastic periodic review inventory model with back-order discounts and ordering cost dependent on lead time for the mixtures of distributions," TOP: An Official Journal of the Spanish Society of Statistics and Operations Research, Springer;Sociedad de Estadística e Investigación Operativa, vol. 23(2), pages 386-400, July.
    7. Cobb, Barry R. & Johnson, Alan W. & Rumí, Rafael & Salmerón, Antonio, 2015. "Accurate lead time demand modeling and optimal inventory policies in continuous review systems," International Journal of Production Economics, Elsevier, vol. 163(C), pages 124-136.
    8. Anuraag Gutgutia & J. K. Jha, 2018. "A closed-form solution for the distribution free continuous review integrated inventory model," Operational Research, Springer, vol. 18(1), pages 159-186, April.
    9. Yu-Jen Lin & Chia-Huei Ho, 2011. "Integrated inventory model with quantity discount and price-sensitive demand," TOP: An Official Journal of the Spanish Society of Statistics and Operations Research, Springer;Sociedad de Estadística e Investigación Operativa, vol. 19(1), pages 177-188, July.
    10. Soumya Kanti Hota & Biswajit Sarkar & Santanu Kumar Ghosh, 2020. "Effects of Unequal Lot Size and Variable Transportation in Unreliable Supply Chain Management," Mathematics, MDPI, vol. 8(3), pages 1-24, March.
    11. Karuppuchamy Annadurai & Ramasamy Uthayakumar, 2014. "Ordering Cost Reduction in Inventory Model with Defective Items and Backorder Price Discount," Journal of Optimization, Hindawi, vol. 2014, pages 1-14, November.
    12. S. Sarkar & B. C. Giri, 2020. "A vendor–buyer integrated inventory system with variable lead time and uncertain market demand," Operational Research, Springer, vol. 20(1), pages 491-515, March.
    13. Sarkar, Biswajit & Moon, Ilkyeong, 2014. "Improved quality, setup cost reduction, and variable backorder costs in an imperfect production process," International Journal of Production Economics, Elsevier, vol. 155(C), pages 204-213.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Wang, Charles X. & Webster, Scott & Zhang, Sidong, 2014. "Robust price-setting newsvendor model with interval market size and consumer willingness-to-pay," International Journal of Production Economics, Elsevier, vol. 154(C), pages 100-112.
    2. Pan, Jason Chao-Hsien & Lo, Ming-Cheng & Hsiao, Yu-Cheng, 2004. "Optimal reorder point inventory models with variable lead time and backorder discount considerations," European Journal of Operational Research, Elsevier, vol. 158(2), pages 488-505, October.
    3. Mostard, Julien & de Koster, Rene & Teunter, Ruud, 2005. "The distribution-free newsboy problem with resalable returns," International Journal of Production Economics, Elsevier, vol. 97(3), pages 329-342, September.
    4. Ouyang, Liang-Yuh & Chang, Hung-Chi, 2002. "A minimax distribution free procedure for mixed inventory models involving variable lead time with fuzzy lost sales," International Journal of Production Economics, Elsevier, vol. 76(1), pages 1-12, March.
    5. Silver, Edward A. & Moon, Ilkyeong, 2001. "The multi-item single period problem with an initial stock of convertible units," European Journal of Operational Research, Elsevier, vol. 132(2), pages 466-477, July.
    6. M. Vijayashree & R. Uthayakumar, 2016. "Two-echelon supply chain inventory model with controllable lead time," International Journal of System Assurance Engineering and Management, Springer;The Society for Reliability, Engineering Quality and Operations Management (SREQOM),India, and Division of Operation and Maintenance, Lulea University of Technology, Sweden, vol. 7(1), pages 112-125, December.
    7. Hayya, Jack C. & Harrison, Terry P. & He, X. James, 2011. "The impact of stochastic lead time reduction on inventory cost under order crossover," European Journal of Operational Research, Elsevier, vol. 211(2), pages 274-281, June.
    8. Cai, Wenbo & Abdel-Malek, Layek & Hoseini, Babak & Rajaei Dehkordi, Sharareh, 2015. "Impact of flexible contracts on the performance of both retailer and supplier," International Journal of Production Economics, Elsevier, vol. 170(PB), pages 429-444.
    9. Zhang, Guoqing, 2010. "The multi-product newsboy problem with supplier quantity discounts and a budget constraint," European Journal of Operational Research, Elsevier, vol. 206(2), pages 350-360, October.
    10. Ilkyeong Moon & Byung-Hyun Ha & Jongchul Kim, 2012. "Inventory systems with variable capacity," European Journal of Industrial Engineering, Inderscience Enterprises Ltd, vol. 6(1), pages 68-86.
    11. Ting-Chen Hu & Kuo-Chen Hung & Kuo-Lung Yang, 2019. "The Convergence of Gallego’s Iterative Method for Distribution-Free Inventory Models," Mathematics, MDPI, vol. 7(5), pages 1-10, May.
    12. Ouyang, Liang-Yuh & Wu, Kun-Shan & Ho, Chia-Huei, 2004. "Integrated vendor-buyer cooperative models with stochastic demand in controllable lead time," International Journal of Production Economics, Elsevier, vol. 92(3), pages 255-266, December.
    13. Anuraag Gutgutia & J. K. Jha, 2018. "A closed-form solution for the distribution free continuous review integrated inventory model," Operational Research, Springer, vol. 18(1), pages 159-186, April.
    14. Alfares, Hesham K. & Elmorra, Hassan H., 2005. "The distribution-free newsboy problem: Extensions to the shortage penalty case," International Journal of Production Economics, Elsevier, vol. 93(1), pages 465-477, January.
    15. Yong Zhang & Vladimir Vovk & Weiguo Zhang, 2014. "Probability-free solutions to the non-stationary newsvendor problem," Annals of Operations Research, Springer, vol. 223(1), pages 433-449, December.
    16. Su, Rung Hung & Pearn, Wen Lea, 2011. "Product selection for newsboy-type products with normal demands and unequal costs," International Journal of Production Economics, Elsevier, vol. 132(2), pages 214-222, August.
    17. Asif Iqbal Malik & Biswajit Sarkar, 2020. "Coordination Supply Chain Management Under Flexible Manufacturing, Stochastic Leadtime Demand, and Mixture of Inventory," Mathematics, MDPI, vol. 8(6), pages 1-32, June.
    18. Sarkar, Biswajit & Moon, Ilkyeong, 2014. "Improved quality, setup cost reduction, and variable backorder costs in an imperfect production process," International Journal of Production Economics, Elsevier, vol. 155(C), pages 204-213.
    19. Jong-Wuu Wu & Wen-Chuan Lee & Hui-Yin Tsai, 2002. "A Note on Minimax Mixture of Distributions Free Procedure for Inventory Model with Variable Lead Time," Quality & Quantity: International Journal of Methodology, Springer, vol. 36(3), pages 311-323, August.
    20. Felix Papier, 2016. "Supply Allocation Under Sequential Advance Demand Information," Operations Research, INFORMS, vol. 64(2), pages 341-361, April.

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:proeco:v:111:y:2008:i:1:p:118-128. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/ijpe .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.