IDEAS home Printed from https://ideas.repec.org/a/eee/ejores/v164y2005i1p185-194.html
   My bibliography  Save this article

Reexamination of processing time uncertainty

Author

Listed:
  • Cao, Qidong
  • Patterson, J. Wayne
  • Bai, Xue

Abstract

No abstract is available for this item.

Suggested Citation

  • Cao, Qidong & Patterson, J. Wayne & Bai, Xue, 2005. "Reexamination of processing time uncertainty," European Journal of Operational Research, Elsevier, vol. 164(1), pages 185-194, July.
  • Handle: RePEc:eee:ejores:v:164:y:2005:i:1:p:185-194
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0377-2217(03)00894-4
    Download Restriction: Full text for ScienceDirect subscribers only
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Nallan C. Suresh & Jack R. Meredith, 1994. "Coping with the Loss of Pooling Synergy in Cellular Manufacturing Systems," Management Science, INFORMS, vol. 40(4), pages 466-483, April.
    2. Lawrence M. Wein & Philippe B. Chevalier, 1992. "A Broader View of the Job-Shop Scheduling Problem," Management Science, INFORMS, vol. 38(7), pages 1018-1033, July.
    3. Richard L. Daniels & Panagiotis Kouvelis, 1995. "Robust Scheduling to Hedge Against Processing Time Uncertainty in Single-Stage Production," Management Science, INFORMS, vol. 41(2), pages 363-376, February.
    4. C. T. Baker & B. P. Dzielinski, 1960. "Simulation of a Simplified Job Shop," Management Science, INFORMS, vol. 6(3), pages 311-323, April.
    Full references (including those not matched with items on IDEAS)

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Riezebos, J. & Gaalman, G.J.C., 1995. "Relations between cells in cellular manufacturing," Research Report 95A45, University of Groningen, Research Institute SOM (Systems, Organisations and Management).
    2. Siyun Zhang & Kameng Nip & Zhenbo Wang, 0. "Related machine scheduling with machine speeds satisfying linear constraints," Journal of Combinatorial Optimization, Springer, vol. 0, pages 1-17.
    3. Tao, Liangyan & Liu, Sifeng & Xie, Naiming & Javed, Saad Ahmed, 2021. "Optimal position of supply chain delivery window with risk-averse suppliers: A CVaR optimization approach," International Journal of Production Economics, Elsevier, vol. 232(C).
    4. Molleman, Eric & Slomp, Jannes & Rolefes, Samantha, 2002. "The evolution of a cellular manufacturing system - a longitudinal case study," International Journal of Production Economics, Elsevier, vol. 75(3), pages 305-322, February.
    5. Yucesan, Enver & de Groote, Xavier, 2000. "Lead times, order release mechanisms, and customer service," European Journal of Operational Research, Elsevier, vol. 120(1), pages 118-130, January.
    6. Chin-Chia Wu & Jatinder N. D. Gupta & Win-Chin Lin & Shuenn-Ren Cheng & Yen-Lin Chiu & Juin-Han Chen & Long-Yuan Lee, 2022. "Robust Scheduling of Two-Agent Customer Orders with Scenario-Dependent Component Processing Times and Release Dates," Mathematics, MDPI, vol. 10(9), pages 1-17, May.
    7. Tanja Mlinar & Philippe Chevalier, 2016. "Pooling heterogeneous products for manufacturing environments," 4OR, Springer, vol. 14(2), pages 173-200, June.
    8. Conde, Eduardo, 2012. "On a constant factor approximation for minmax regret problems using a symmetry point scenario," European Journal of Operational Research, Elsevier, vol. 219(2), pages 452-457.
    9. Şeker, Merve & Noyan, Nilay, 2012. "Stochastic optimization models for the airport gate assignment problem," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 48(2), pages 438-459.
    10. Olorunniwo, Festus & Udo, Godwin, 2002. "The impact of management and employees on cellular manufacturing implementation," International Journal of Production Economics, Elsevier, vol. 76(1), pages 27-38, March.
    11. Adam Kasperski & Paweł Zieliński, 2019. "Risk-averse single machine scheduling: complexity and approximation," Journal of Scheduling, Springer, vol. 22(5), pages 567-580, October.
    12. Miri Gilenson & Dvir Shabtay & Liron Yedidsion & Rohit Malshe, 2021. "Scheduling in multi-scenario environment with an agreeable condition on job processing times," Annals of Operations Research, Springer, vol. 307(1), pages 153-173, December.
    13. Cohen, Izack & Postek, Krzysztof & Shtern, Shimrit, 2023. "An adaptive robust optimization model for parallel machine scheduling," European Journal of Operational Research, Elsevier, vol. 306(1), pages 83-104.
    14. D'Angelo, Andrea & Gastaldi, Massimo & Levialdi, Nathan, 2000. "Production variability and shop configuration: An experimental analysis," International Journal of Production Economics, Elsevier, vol. 68(1), pages 43-57, October.
    15. Holthaus, Oliver & Rajendran, Chandrasekharan, 1997. "Efficient dispatching rules for scheduling in a job shop," International Journal of Production Economics, Elsevier, vol. 48(1), pages 87-105, January.
    16. Wenhui Zhou & Dongmei Wang & Weixiang Huang & Pengfei Guo, 2021. "To Pool or Not to Pool? The Effect of Loss Aversion on Queue Configurations," Production and Operations Management, Production and Operations Management Society, vol. 30(11), pages 4258-4272, November.
    17. Al-Hinai, Nasr & ElMekkawy, T.Y., 2011. "Robust and stable flexible job shop scheduling with random machine breakdowns using a hybrid genetic algorithm," International Journal of Production Economics, Elsevier, vol. 132(2), pages 279-291, August.
    18. Manning, William & Jensen, John, 2006. "Evaluating the shop-wide performance effect of pooling synergy with analytical models," European Journal of Operational Research, Elsevier, vol. 175(2), pages 1009-1020, December.
    19. Kannan, V. R. & Ghosh, S., 1995. "Using dynamic cellular manufacturing to simplify scheduling in cell based production systems," Omega, Elsevier, vol. 23(4), pages 443-452, August.
    20. Gang Xuan & Win-Chin Lin & Shuenn-Ren Cheng & Wei-Lun Shen & Po-An Pan & Chih-Ling Kuo & Chin-Chia Wu, 2022. "A Robust Single-Machine Scheduling Problem with Two Job Parameter Scenarios," Mathematics, MDPI, vol. 10(13), pages 1-17, June.

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:ejores:v:164:y:2005:i:1:p:185-194. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/eor .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.