IDEAS home Printed from https://ideas.repec.org/a/eee/ejores/v138y2002i3p569-577.html
   My bibliography  Save this article

Decomposed vs integrated control of a one-stage production system

Author

Listed:
  • Broersma, Andreas L. A.
  • Sierksma, Gerard
  • Wijngaard, Jacob

Abstract

No abstract is available for this item.

Suggested Citation

  • Broersma, Andreas L. A. & Sierksma, Gerard & Wijngaard, Jacob, 2002. "Decomposed vs integrated control of a one-stage production system," European Journal of Operational Research, Elsevier, vol. 138(3), pages 569-577, May.
  • Handle: RePEc:eee:ejores:v:138:y:2002:i:3:p:569-577
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0377-2217(01)00146-1
    Download Restriction: Full text for ScienceDirect subscribers only
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. ten Kate, Hans A., 1994. "Towards a better understanding of order acceptance," International Journal of Production Economics, Elsevier, vol. 37(1), pages 139-152, November.
    2. D. Sarkar & W. I. Zangwill, 1989. "Expected Waiting Time for Nonsymmetric Cyclic Queueing Systems---Exact Results and Applications," Management Science, INFORMS, vol. 35(12), pages 1463-1474, December.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Wijngaard, J., 2004. "The effect of foreknowledge of demand in case of a restricted capacity: The single-stage, single-product case," European Journal of Operational Research, Elsevier, vol. 159(1), pages 95-109, November.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. repec:dgr:rugsom:99a18 is not listed on IDEAS
    2. Broersma, A.L.A. & Sierksma, G. & Wijngaard, J., 1999. "Decomposed versus integrated control of a one-stage production system," Research Report 99A18, University of Groningen, Research Institute SOM (Systems, Organisations and Management).
    3. Slotnick, Susan A., 2011. "Order acceptance and scheduling: A taxonomy and review," European Journal of Operational Research, Elsevier, vol. 212(1), pages 1-11, July.
    4. Jin Xu & Natarajan Gautam, 2020. "On competitive analysis for polling systems," Naval Research Logistics (NRL), John Wiley & Sons, vol. 67(6), pages 404-419, September.
    5. Rappold, James A. & Yoho, Keenan D., 2014. "Setting safety stocks for stable rotation cycle schedules," International Journal of Production Economics, Elsevier, vol. 156(C), pages 146-158.
    6. Robert B. Cooper & Shun-Chen Niu & Mandyam M. Srinivasan, 1998. "When Does Forced Idle Time Improve Performance in Polling Models?," Management Science, INFORMS, vol. 44(8), pages 1079-1086, August.
    7. Simon Thevenin & Nicolas Zufferey & Marino Widmer, 2016. "Order acceptance and scheduling with earliness and tardiness penalties," Journal of Heuristics, Springer, vol. 22(6), pages 849-890, December.
    8. Subhashish Samaddar & Thomas Whalen, 2008. "Improving Performance in Cyclic Production Systems by Using Forced Variable Idle Setup Time," Manufacturing & Service Operations Management, INFORMS, vol. 10(2), pages 173-180, August.
    9. Sharafali, Moosa & Co, Henry C. & Goh, Mark, 2004. "Production scheduling in a flexible manufacturing system under random demand," European Journal of Operational Research, Elsevier, vol. 158(1), pages 89-102, October.
    10. Zorzini, Marta & Stevenson, Mark & Hendry, Linda C., 2012. "Customer Enquiry Management in global supply chains: A comparative multi-case study analysis," European Management Journal, Elsevier, vol. 30(2), pages 121-140.
    11. Soman, Chetan Anil & van Donk, Dirk Pieter & Gaalman, Gerard, 2004. "Combined make-to-order and make-to-stock in a food production system," International Journal of Production Economics, Elsevier, vol. 90(2), pages 223-235, July.
    12. Sridharan, Sri V., 1998. "Managing capacity in tightly constrained systems," International Journal of Production Economics, Elsevier, vol. 56(1), pages 601-610, September.
    13. Ghadimi, Foad & Aouam, Tarik & Haeussler, Stefan & Uzsoy, Reha, 2022. "Integrated and hierarchical systems for coordinating order acceptance and release planning," European Journal of Operational Research, Elsevier, vol. 303(3), pages 1277-1289.
    14. Gupta, Diwakar & Gunalay, Yavuz & Srinivasan, Mandyam M., 2001. "The relationship between preventive maintenance and manufacturing system performance," European Journal of Operational Research, Elsevier, vol. 132(1), pages 146-162, July.
    15. Calosso, T. & Cantamessa, M. & Vu, Dang & Villa, A., 2003. "Production planning and order acceptance in business to business electronic commerce," International Journal of Production Economics, Elsevier, vol. 85(2), pages 233-249, August.
    16. Volling, Thomas & Spengler, Thomas S., 2011. "Modeling and simulation of order-driven planning policies in build-to-order automobile production," International Journal of Production Economics, Elsevier, vol. 131(1), pages 183-193, May.
    17. Tetsuji Hirayama, 2012. "Analysis of multiclass Markovian polling systems with feedback and composite scheduling algorithms," Annals of Operations Research, Springer, vol. 198(1), pages 83-123, September.
    18. Mandyam M. Srinivasan & Hanoch Levy & Alan G. Konheim, 1996. "The individual station technique for the analysis of cyclic polling systems," Naval Research Logistics (NRL), John Wiley & Sons, vol. 43(1), pages 79-101, February.
    19. Kamath B, Narasimha & Bhattacharya, Subir, 2007. "Lead time minimization of a multi-product, single-processor system: A comparison of cyclic policies," International Journal of Production Economics, Elsevier, vol. 106(1), pages 28-40, March.
    20. Zorzini, M. & Corti, D. & Pozzetti, A., 2008. "Due date (DD) quotation and capacity planning in make-to-order companies: Results from an empirical analysis," International Journal of Production Economics, Elsevier, vol. 112(2), pages 919-933, April.
    21. Merzifonluoglu, Yasemin & Geunes, Joseph, 2006. "Uncapacitated production and location planning models with demand fulfillment flexibility," International Journal of Production Economics, Elsevier, vol. 102(2), pages 199-216, August.

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:ejores:v:138:y:2002:i:3:p:569-577. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/eor .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.