IDEAS home Printed from https://ideas.repec.org/r/eee/ejores/v135y2001i3p493-513.html
   My bibliography  Save this item

Single-machine scheduling with maintenance and repair rate-modifying activities

Citations

Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
as


Cited by:

  1. Zhao, Chuan-Li & Tang, Heng-Yong & Cheng, Cong-Dian, 2009. "Two-parallel machines scheduling with rate-modifying activities to minimize total completion time," European Journal of Operational Research, Elsevier, vol. 198(1), pages 354-357, October.
  2. Mosheiov, Gur & Sarig, Assaf & Strusevich, Vitaly A & Mosheiff, Jonathan, 2018. "Two-machine flow shop and open shop scheduling problems with a single maintenance window," European Journal of Operational Research, Elsevier, vol. 271(2), pages 388-400.
  3. Xinyu Sun & Tao Liu & Xin-Na Geng & Yang Hu & Jing-Xiao Xu, 2023. "Optimization of scheduling problems with deterioration effects and an optional maintenance activity," Journal of Scheduling, Springer, vol. 26(3), pages 251-266, June.
  4. Dujuan Wang & Feng Liu & Yunqiang Yin & Jianjun Wang & Yanzhang Wang, 2015. "Prioritized surgery scheduling in face of surgeon tiredness and fixed off-duty period," Journal of Combinatorial Optimization, Springer, vol. 30(4), pages 967-981, November.
  5. Du-Juan Wang & Yunqiang Yin & Mengqi Liu, 2016. "Bicriteria scheduling problems involving job rejection, controllable processing times and rate-modifying activity," International Journal of Production Research, Taylor & Francis Journals, vol. 54(12), pages 3691-3705, June.
  6. Shijin Wang & Ming Liu, 2016. "Two-machine flow shop scheduling integrated with preventive maintenance planning," International Journal of Systems Science, Taylor & Francis Journals, vol. 47(3), pages 672-690, February.
  7. Kim, Hyunjoon & Kim, Byung-In, 2022. "Optimal sequence for single server scheduling incorporating a rate-modifying activity under job-dependent linear deterioration," European Journal of Operational Research, Elsevier, vol. 298(2), pages 439-450.
  8. Xiaoqiang Cai & Xianyi Wu & Xian Zhou, 2009. "Stochastic Scheduling Subject to Preemptive-Repeat Breakdowns with Incomplete Information," Operations Research, INFORMS, vol. 57(5), pages 1236-1249, October.
  9. Asaf Levin & Gur Mosheiov & Assaf Sarig, 2009. "Scheduling a maintenance activity on parallel identical machines," Naval Research Logistics (NRL), John Wiley & Sons, vol. 56(1), pages 33-41, February.
  10. Janiak, Adam & Janiak, Władysław A. & Krysiak, Tomasz & Kwiatkowski, Tomasz, 2015. "A survey on scheduling problems with due windows," European Journal of Operational Research, Elsevier, vol. 242(2), pages 347-357.
  11. Xiaoqiang Cai & Xianyi Wu & Xian Zhou, 2021. "Optimal unrestricted dynamic stochastic scheduling with partial losses of work due to breakdowns," Annals of Operations Research, Springer, vol. 298(1), pages 43-64, March.
  12. Kim, Taebok & Glock, Christoph H., 2018. "Production planning for a two-stage production system with multiple parallel machines and variable production rates," International Journal of Production Economics, Elsevier, vol. 196(C), pages 284-292.
  13. Gur Mosheiov & Daniel Oron, 2020. "Scheduling problems with a weight-modifying-activity," Annals of Operations Research, Springer, vol. 295(2), pages 737-745, December.
  14. J S Chen, 2006. "Single-machine scheduling with flexible and periodic maintenance," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 57(6), pages 703-710, June.
  15. W J Chen, 2006. "Minimizing total flow time in the single-machine scheduling problem with periodic maintenance," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 57(4), pages 410-415, April.
  16. C N Potts & V A Strusevich, 2009. "Fifty years of scheduling: a survey of milestones," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 60(1), pages 41-68, May.
  17. Lodree Jr., Emmett J. & Geiger, Christopher D., 2010. "A note on the optimal sequence position for a rate-modifying activity under simple linear deterioration," European Journal of Operational Research, Elsevier, vol. 201(2), pages 644-648, March.
  18. J-J Wang & J-B Wang & F Liu, 2011. "Parallel machines scheduling with a deteriorating maintenance activity," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 62(10), pages 1898-1902, October.
  19. Chen, Wen-Jinn, 2009. "Minimizing number of tardy jobs on a single machine subject to periodic maintenance," Omega, Elsevier, vol. 37(3), pages 591-599, June.
  20. Chun-Lai Liu & Jian-Jun Wang, 2016. "Unrelated Parallel-Machine Scheduling with Controllable Processing Times and Impact of Deteriorating Maintenance Activities under Consideration," Asia-Pacific Journal of Operational Research (APJOR), World Scientific Publishing Co. Pte. Ltd., vol. 33(01), pages 1-16, February.
  21. Wolter, Anja & Helber, Stefan, 2013. "Simultaneous Production and Maintenance Planning for a Single Capacitated Resource facing both a Dynamic Demand and Intensive Wear and Tear," Hannover Economic Papers (HEP) dp-522, Leibniz Universität Hannover, Wirtschaftswissenschaftliche Fakultät.
  22. Shi-Sheng Li & Ren-Xia Chen, 2017. "Scheduling with Rejection and a Deteriorating Maintenance Activity on a Single Machine," Asia-Pacific Journal of Operational Research (APJOR), World Scientific Publishing Co. Pte. Ltd., vol. 34(02), pages 1-17, April.
  23. Zhanguo Zhu & Feifeng Zheng & Chengbin Chu, 2017. "Multitasking scheduling problems with a rate-modifying activity," International Journal of Production Research, Taylor & Francis Journals, vol. 55(1), pages 296-312, January.
  24. Kabir Rustogi & Vitaly A. Strusevich, 2017. "Single machine scheduling with a generalized job-dependent cumulative effect," Journal of Scheduling, Springer, vol. 20(6), pages 583-592, December.
  25. Wang, Ting & Baldacci, Roberto & Lim, Andrew & Hu, Qian, 2018. "A branch-and-price algorithm for scheduling of deteriorating jobs and flexible periodic maintenance on a single machine," European Journal of Operational Research, Elsevier, vol. 271(3), pages 826-838.
  26. Stanisław Gawiejnowicz, 2020. "A review of four decades of time-dependent scheduling: main results, new topics, and open problems," Journal of Scheduling, Springer, vol. 23(1), pages 3-47, February.
  27. G Mosheiov & J B Sidney, 2010. "Scheduling a deteriorating maintenance activity on a single machine," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 61(5), pages 882-887, May.
  28. Hui Zhu & Min Li & Zhangjin Zhou & Yun You, 2016. "Due-window assignment and scheduling with general position-dependent processing times involving a deteriorating and compressible maintenance activity," International Journal of Production Research, Taylor & Francis Journals, vol. 54(12), pages 3475-3490, June.
  29. Hoyningen-Huene, Wiebke von, 2015. "Heuristics for an Integrated Maintenance and Production Scheduling Problem on Parallel Machines with Stochastic Failures and Non-Resumable Jobs," EconStor Preprints 112746, ZBW - Leibniz Information Centre for Economics.
  30. von Hoyningen-Huene, W. & Kiesmüller, G.P., 2015. "Evaluation of the expected makespan of a set of non-resumable jobs on parallel machines with stochastic failures," European Journal of Operational Research, Elsevier, vol. 240(2), pages 439-446.
  31. Sheng Yu, 2015. "An optimal single-machine scheduling with linear deterioration rate and rate-modifying activities," Journal of Combinatorial Optimization, Springer, vol. 30(2), pages 242-252, August.
IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.