IDEAS home Printed from https://ideas.repec.org/p/zbw/cauman/651.html
   My bibliography  Save this paper

Project scheduling with processing time compression cost and lateness penalties

Author

Listed:
  • Choi, Byung-Cheon
  • Briskorn, Dirk

Abstract

We consider a project scheduling problem where the precedence constraints graph is an out-tree. The processing times can be compressed by using additional resources, which causes cost and simultaneously reduces the processing times of jobs. The objective is to minimize the sum of total lateness penalties and total compression costs where the cost function for compressing the processing times is linear in the amount of compression. The problem can be decomposed into two types of subproblems. We show that both subproblems can be solved in polynomial time. Using these results, we show that the main problem is solvable in polynomial time if the number of chains in the out-tree is fixed.

Suggested Citation

  • Choi, Byung-Cheon & Briskorn, Dirk, 2010. "Project scheduling with processing time compression cost and lateness penalties," Manuskripte aus den Instituten für Betriebswirtschaftslehre der Universität Kiel 651, Christian-Albrechts-Universität zu Kiel, Institut für Betriebswirtschaftslehre.
  • Handle: RePEc:zbw:cauman:651
    as

    Download full text from publisher

    File URL: https://www.econstor.eu/bitstream/10419/147569/1/manuskript_651.pdf
    Download Restriction: no
    ---><---

    References listed on IDEAS

    as
    1. Chung-Yee Lee & Lei Lei, 2001. "Multiple-Project Scheduling with Controllable Project Duration and Hard Resource Constraint: Some Solvable Cases," Annals of Operations Research, Springer, vol. 102(1), pages 287-307, February.
    Full references (including those not matched with items on IDEAS)

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Shabtay, Dvir, 2022. "Single-machine scheduling with machine unavailability periods and resource dependent processing times," European Journal of Operational Research, Elsevier, vol. 296(2), pages 423-439.
    2. Herroelen, Willy & Leus, Roel, 2004. "The construction of stable project baseline schedules," European Journal of Operational Research, Elsevier, vol. 156(3), pages 550-565, August.
    3. Shabtay, Dvir & Zofi, Moshe, 2018. "Single machine scheduling with controllable processing times and an unavailability period to minimize the makespan," International Journal of Production Economics, Elsevier, vol. 198(C), pages 191-200.
    4. Oron, Daniel, 2016. "Scheduling controllable processing time jobs with position-dependent workloads," International Journal of Production Economics, Elsevier, vol. 173(C), pages 153-160.
    5. Gómez Sánchez, Mariam & Lalla-Ruiz, Eduardo & Fernández Gil, Alejandro & Castro, Carlos & Voß, Stefan, 2023. "Resource-constrained multi-project scheduling problem: A survey," European Journal of Operational Research, Elsevier, vol. 309(3), pages 958-976.
    6. Aidin Delgoshaei & Timon Rabczuk & Ahad Ali & Mohd Khairol Anuar Ariffin, 2017. "An applicable method for modifying over-allocated multi-mode resource constraint schedules in the presence of preemptive resources," Annals of Operations Research, Springer, vol. 259(1), pages 85-117, December.
    7. Lei Lei & Michael Pinedo & Lian Qi & Shengbin Wang & Jian Yang, 2015. "Personnel scheduling and supplies provisioning in emergency relief operations," Annals of Operations Research, Springer, vol. 235(1), pages 487-515, December.
    8. Yedidsion, Liron & Shabtay, Dvir, 2017. "The resource dependent assignment problem with a convex agent cost function," European Journal of Operational Research, Elsevier, vol. 261(2), pages 486-502.
    9. Yim, Seho & Hong, Sung-Pil & Park, Myoung-Ju & Chung, Yerim, 2022. "Inverse interval scheduling via reduction on a single machine," European Journal of Operational Research, Elsevier, vol. 303(2), pages 541-549.
    10. Yaron Leyvand & Dvir Shabtay & George Steiner & Liron Yedidsion, 2010. "Just-in-time scheduling with controllable processing times on parallel machines," Journal of Combinatorial Optimization, Springer, vol. 19(3), pages 347-368, April.
    11. Kailiang Xu & Zuren Feng & Liangjun Ke, 2010. "A branch and bound algorithm for scheduling jobs with controllable processing times on a single machine to meet due dates," Annals of Operations Research, Springer, vol. 181(1), pages 303-324, December.
    12. Yedidsion, Liron & Shabtay, Dvir & Korach, Ephraim & Kaspi, Moshe, 2009. "A bicriteria approach to minimize number of tardy jobs and resource consumption in scheduling a single machine," International Journal of Production Economics, Elsevier, vol. 119(2), pages 298-307, June.
    13. C T Daniel Ng & T C E Cheng & M Y Kovalyov, 2003. "Batch scheduling with controllable setup and processing times to minimize total completion time," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 54(5), pages 499-506, May.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:zbw:cauman:651. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: ZBW - Leibniz Information Centre for Economics (email available below). General contact details of provider: https://edirc.repec.org/data/ibkiede.html .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.