Advanced Search
MyIDEAS: Login to save this paper or follow this series

Cape Verde's infrastructure : a continental perspective

Contents:

Author Info

  • Briceno-Garmendia, Cecilia M.
  • Benitez, Daniel Alberto
Registered author(s):

    Abstract

    Cape Verde stands out in West Africa as a country whose economic geography poses major and unique challenges for infrastructure development. Its small population of half a million people is spread across a nine-island archipelago. The islands need complementary infrastructure in terms of roads, water, transport, ports, power, and ICT. Cape Verde already has well-developed infrastructure networks. Road density is relatively high, and most of the national network is paved. Almost all islands have port and airport facilities. Around 70 percent of the population has power and utility water. Indicators for ICT coverage -- penetration, bandwidth, submarine cable, private sector participation -- are relatively good. Nevertheless, prices for all services are exceptionally high. The quality of services is often deficient. At least half of the national road network is in poor condition; power supply is unreliable; and half of the population receives water from standposts. Cape Verde devotes around $147 million per year to infrastructure (almost 15 percent of GDP), among the highest levels of infrastructure spending on the continent. Some $50 million of that is lost each year to operations inefficiencies and underpricing. The country's main challenges are to improve infrastructure management and reduce high costs of services.

    Download Info

    If you experience problems downloading a file, check if you have the proper application to view it first. In case of further problems read the IDEAS help page. Note that these files are not on the IDEAS site. Please be patient as the files may be large.
    File URL: http://www-wds.worldbank.org/servlet/WDSContentServer/WDSP/IB/2011/06/17/000158349_20110617125047/Rendered/PDF/WPS5687.pdf
    Download Restriction: no

    Bibliographic Info

    Paper provided by The World Bank in its series Policy Research Working Paper Series with number 5687.

    as in new window
    Length:
    Date of creation: 01 Jun 2011
    Date of revision:
    Handle: RePEc:wbk:wbrwps:5687

    Contact details of provider:
    Postal: 1818 H Street, N.W., Washington, DC 20433
    Phone: (202) 477-1234
    Email:
    Web page: http://www.worldbank.org/
    More information through EDIRC

    Related research

    Keywords: Transport Economics Policy&Planning; Infrastructure Economics; Energy Production and Transportation; E-Business; Banks&Banking Reform;

    This paper has been announced in the following NEP Reports:

    References

    No references listed on IDEAS
    You can help add them by filling out this form.

    Citations

    Lists

    This item is not listed on Wikipedia, on a reading list or among the top items on IDEAS.

    Statistics

    Access and download statistics

    Corrections

    When requesting a correction, please mention this item's handle: RePEc:wbk:wbrwps:5687. See general information about how to correct material in RePEc.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: (Roula I. Yazigi).

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If references are entirely missing, you can add them using this form.

    If the full references list an item that is present in RePEc, but the system did not link to it, you can help with this form.

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your profile, as there may be some citations waiting for confirmation.

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.