Reducing Siltation and Increasing Hydropower Generation from the Rantambe Reservoir,Sri Lanka

Author

Listed:
  • E.P.N. Udayakumara
  • U.A.D.P. Gunawardena

Abstract

Hydropower in Sri Lanka is affected by unanticipated siltation from changes in upstream watersheds. In this study, we examine the costs of soil erosion associated with the Rantambe reservoir. We assess the impact of changing upstream land use patterns on soil erosion, reservoir sedimentation, electricity availability and dredging costs by using the Integrated Valuation of Ecosystem Services and Tradeoffs (InVEST) Sediment Retention model. We find that the current human-induced average rate of soil erosion in the watershed is 10.7 tons/ ha/year, which is approximately double the permissible rate of soil erosion. Consequently,the reservoir bears an annual hydropower loss of some half a million rupees (over three thousand US$) per year. Our model estimates that these hydel losses could be avoided by incurring an annual cost of dredging of Rs. 259,605 (1,782 US$). Three alternative watershed management strategies would also help lower sedimentation. These include: (I) adoption of a Soil and Water Conservation (SWC) by farmers, (II) re-foresting farmlands with slopesgreater than 60%, and (III) reforesting 10% of current farmlands. Strategy I would reduce the soil erosion rate relative to business as usual by 23%, strategy II would reduce the rate by 16% and strategy III would lower the soil erosion rate by 11%. Thus, SWC strategy (I) provides the best outcome. Undertaking plot level soil and water conservation (strategy I) would result in electricity revenue savings of 15% (460 US$) per year relative to the current scenario. While we focus on the hydel benefits, it is likely that there are also farm level benefits to soil and water conservation.

Suggested Citation

  • E.P.N. Udayakumara & U.A.D.P. Gunawardena, "undated". "Reducing Siltation and Increasing Hydropower Generation from the Rantambe Reservoir,Sri Lanka," Working papers 110, The South Asian Network for Development and Environmental Economics.
  • Handle: RePEc:snd:wpaper:110
    as

    Download full text from publisher

    File URL: http://www.sandeeonline.org/uploads/documents/publication/1097_PUB_Working_Paper_No._113-16.pdf
    Download Restriction: no
    ---><---

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:snd:wpaper:110. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    We have no bibliographic references for this item. You can help adding them by using this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Anuradhak (email available below). General contact details of provider: .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.