This file is part of IDEAS, which uses RePEc data


[ Papers | Articles | Software | Books | Chapters | Authors | Institutions | JEL Classification | NEP reports | Search | New papers by email | Author registration | Rankings | Volunteers | FAQ | Blog | Help! ]

Should we be surprised by the unreliability of real-time output gap estimates? Density estimates for the Eurozone

Author info | Abstract | Publisher info | Download info | Related research | Statistics
Author Info
James Mitchell ()

Additional information is available for the following registered author(s):

Abstract

Output gap estimates calculated in real-time are known to be often unreliable. Recent work has found that, without the benefit of hindsight, it can prove difficult for policy-makers to pin down accurately the current position of the output gap. However, attention primarily has focussed on output gap point estimates alone. This paper considers output gap estimates and their uncertainty more generally. As is well known from the forecasting literature, if the outturn falls within the bounds of what was expected the fact that point forecasts are inaccurate need not mean forecasts more generally contain no useful information. In this sense, the unreliability of real-time output gap estimates need be neither surprising nor indeed lead to sub-optimal inference by users of the estimates. Interpreting real-time output gap estimates as forecasts, we explain the importance of providing measures of uncertainty, via interval or density forecasts, around real-time output gap estimates. We consider how this can be achieved. The importance of allowing, in particular, for parameter uncertainty is discussed. We then explain how ex post the accuracy of these measures of unreliability associated with real-time estimates can be evaluated statistically and a decision then made about their reliability. An application to the Eurozone illustrates the use of these techniques in the context of real-time output gap measurement. Simulated out-of-sample experiments reveal that not only can real-time point estimates of the Eurozone output gap be unreliable, but so can measures of uncertainty associated with them. This provides a serious challenge to both producers and users of output gap estimates.

Download Info
To download:

If you experience problems downloading a file, check if you have the proper application to view it first. Information about this may be contained in the File-Format links below. In case of further problems read the IDEAS help page. Note that these files are not on the IDEAS site. Please be patient as the files may be large.

File URL: http://www.niesr.ac.uk/pubs/dps/Dp225.pdf
File Format: application/pdf
File Function:
Download Restriction: no

Publisher Info
Paper provided by National Institute of Economic and Social Research in its series NIESR Discussion Papers with number 225.

Download reference. The following formats are available: HTML (with abstract), plain text (with abstract), BibTeX, RIS (EndNote, RefMan, ProCite), ReDIF
Length:
Date of creation: Nov 2003
Date of revision:
Handle: RePEc:nsr:niesrd:225

Contact details of provider:
Postal: 2 Dean Trench Street Smith Square London SW1P 3HE
Web page: http://www.niesr.ac.uk

For technical questions regarding this item, or to correct its listing, contact: (Communications Manager).

Related research
Keywords:

Statistics
Access and download statistics

Did you know? You can create your own reading lists on IDEAS.

This page was last updated on 2009-12-21.


This information is provided to you by IDEAS at the Department of Economics, College of Liberal Arts and Sciences, University of Connecticut using RePEc data on a server sponsored by the Society for Economic Dynamics.