Electricity Internal Market in the European Union - What to do next?

Author info | Abstract | Publisher info | Download info | Related research | Statistics
Author Info
Jean-Michel Glachant
François Lévêque

Additional information is available for the following registered author(s):

Abstract

The European Union’s “internal energy market” remains a work in progress. It is even possible its construction were to stall. Given current political, institutional and business conditions in Europe, there are no guarantees that the dynamics of this construction will not dissipate, as in the United States, or that the internal market will not fracture into “national blocks” that may be permanent or persist for a long time. This is exactly what this paper seeks to avoid. It suggests priority actions and secondary improvements to sustain the dynamics of construction of the internal market, from today to the few coming years. It tries too to explain the underlying rationale for these recommendations by describing several aspects of the present state of the construction of the internal market and what factors are blocking or unblocking its progress. A main constraint has guided our thinking and writing of this paper. We have excluded the issuance of a new package of European directives and regulations to push for stronger convergence in the construction of the EU internal energy market. In fact, such an event is low likely. By contrast, we have counted on two levers: the conscientious applying of the provisions of the second directive and companion regulations, and the promoting of reinforced regional cooperation agreements that will lead to the voluntary opening of some domestic markets to regional “mini internal markets”. We believe and try to demonstrate that thank to these levers a minimal but sufficient dynamics of construction can be fostered. The identified priority actions will allow to progress without precluding further policy changes at a later date. Then the length of the phase is defined by the expected life of the current College of European Union Commissioners, that is until 20091. The paper is divided into 5 sections. Each section corresponds to priorities to improve a critical factor: 1- national market designs, 2- EU internal market design, 3- industry structure, 4- TSOs, and 5- regulators. Each section will indicate what makes this factor a key for the building of the internal market and what are the priority or secondary actions which could be useful to keep constructing an EU electricity single market from 2005 to 2009. Note that this paper does not cover all the areas of the European energy policy. Other topics representing core interests of the European Union and the 25 Member States, such as “Security of Supply” and “Sustainability of European Energy Regime”, have not been treated in this paper. They deserve further investigation and analysis.

Download Info
To download:

If you experience problems downloading a file, check if you have the proper application to view it first. Information about this may be contained in the File-Format links below. In case of further problems read the IDEAS help file. Note that these files are not on the IDEAS site. Please be patient as the files may be large.

File URL: http://tisiphone.mit.edu/RePEc/mee/wpaper/2005-015.pdf
File Format: application/pdf
File Function:
Download Restriction: no

Publisher Info
Paper provided by Massachusetts Institute of Technology, Center for Energy and Environmental Policy Research in its series Working Papers with number 0515.

Download reference. The following formats are available: HTML, plain text, BibTeX, RIS (EndNote), ReDIF
Length:
Date of creation: Sep 2005
Date of revision:
Handle: RePEc:mee:wpaper:0515

Contact details of provider:
Postal: 77 Massachusetts Ave. (Building E40-279), Cambridge, MA 02139-4307
Phone: (617) 253-3551
Fax: (617) 253-9845
Email:
Web page: http://tisiphone.mit.edu/RePEc
More information through EDIRC

For technical questions regarding this item, or to correct its listing, contact: (Sharmila Ganguly).

Related research
Keywords:

This paper has been announced in the following NEP Reports:

Cited by:
(explanations, Please report citation or reference errors to , or , if you are the registered author of the cited work, log in to your RePEc Author Service profile, click on "citations" and make appropriate adjustments.)
  1. Jean-Michel Glachant & Vincent Rious, 2007. "A Typical Case of Weak Institutional Complementarity in Institution Building : The Design of Transmission Network Monopoly in Competitive Electricity Markets," Post-Print hal-00217811_v1, HAL. [Downloadable!]
  2. Glachant, J.M. & Saguan, M., 2007. "An Institutional Frame to Compare Alternative Market Designs in EU Electricity Balancing," Cambridge Working Papers in Economics 0724, Faculty of Economics, University of Cambridge. [Downloadable!]
    Other versions:
Statistics
Access and download statistics

Did you know? Use the JEL tree to browse through the database by subfields.

This page was last updated on 2008-9-25.


This information is provided to you by IDEAS at the Department of Economics, College of Liberal Arts and Sciences, University of Connecticut using RePEc data on a server sponsored by the Society for Economic Dynamics.