IDEAS home Printed from https://ideas.repec.org/a/wly/navres/v42y1995i8p1251-1262.html
   My bibliography  Save this article

A note on minimizing the expected makespan in flowshops subject to breakdowns

Author

Listed:
  • Charles Du
  • Michael Pinedo

Abstract

Consider a two machine flow shop and n jobs. The processing time of job j on machine i is equal to the random variable Xij One of the two machines is subject to breakdown and repair. The objective is to find the schedule that minimizes the expected makespan. Two results are shown. First, ifP(X2j ≧ X1j) = 1 for all j and the random variables X11, X12,…, X1n are likelihood ratio ordered, then the SEPT sequence minimizes the expected makespan when machine 2 is subject to an arbitrary breakdown process; if P(X1j≧X2j) = 1 and X21, X22,….,X2n are likelihood ratio ordered, then the LEPT sequence minimizes the expected makespan when machine 1 is subject to an arbitrary breakdown process. A generalization is presented for flow shops with m machines. Second, consider the case where X1j and X2j are i.i.d. exponentially distributed with rate λj. The SEPT sequence minimizes the expected makespan when machine 2 is subject to an arbitrary breakdown process and the LEPT sequence is optimal when machine 1 is subject to an arbitrary breakdown process. © 1995 John Wiley & Sons, Inc.

Suggested Citation

  • Charles Du & Michael Pinedo, 1995. "A note on minimizing the expected makespan in flowshops subject to breakdowns," Naval Research Logistics (NRL), John Wiley & Sons, vol. 42(8), pages 1251-1262, December.
  • Handle: RePEc:wly:navres:v:42:y:1995:i:8:p:1251-1262
    DOI: 10.1002/1520-6750(199512)42:83.0.CO;2-Q
    as

    Download full text from publisher

    File URL: https://doi.org/10.1002/1520-6750(199512)42:83.0.CO;2-Q
    Download Restriction: no

    File URL: https://libkey.io/10.1002/1520-6750(199512)42:83.0.CO;2-Q?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    References listed on IDEAS

    as
    1. Kevin D. Glazebrook, 1987. "Evaluating the effects of machine breakdowns in stochastic scheduling problems," Naval Research Logistics (NRL), John Wiley & Sons, vol. 34(3), pages 319-335, June.
    2. Michael Pinedo, 1982. "Minimizing the Expected Makespan in Stochastic Flow Shops," Operations Research, INFORMS, vol. 30(1), pages 148-162, February.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Jian Yang & Gang Yu, 2002. "On the Robust Single Machine Scheduling Problem," Journal of Combinatorial Optimization, Springer, vol. 6(1), pages 17-33, March.
    2. Allahverdi, Ali, 1999. "Stochastically minimizing total flowtime in flowshops with no waiting space," European Journal of Operational Research, Elsevier, vol. 113(1), pages 101-112, February.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Golenko-Ginzburg, Dimitri & Gonik, Aharon, 1997. "Using "look ahead" techniques in job-shop scheduling with random operations," International Journal of Production Economics, Elsevier, vol. 50(1), pages 13-22, May.
    2. J Jackman & Z Guerra de Castillo & S Olafsson, 2011. "Stochastic flow shop scheduling model for the Panama Canal," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 62(1), pages 69-80, January.
    3. S.S. Panwalkar & Christos Koulamas, 2015. "Proportionate flow shop: New complexity results and models with due date assignment," Naval Research Logistics (NRL), John Wiley & Sons, vol. 62(2), pages 98-106, March.
    4. P J Kalczynski & J Kamburowski, 2004. "Generalization of Johnson's and Talwar's scheduling rules in two-machine stochastic flow shops," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 55(12), pages 1358-1362, December.
    5. S. E. Pilnick & K. D. Glazebrook & D. P. Gaver, 1991. "Optimal sequential replenishment of ships during combat," Naval Research Logistics (NRL), John Wiley & Sons, vol. 38(5), pages 637-668, October.
    6. Gourgand, Michel & Grangeon, Nathalie & Norre, Sylvie, 2003. "A contribution to the stochastic flow shop scheduling problem," European Journal of Operational Research, Elsevier, vol. 151(2), pages 415-433, December.
    7. Li, Wei & Glazebrook, Kevin D., 1998. "On stochastic machine scheduling with general distributional assumptions," European Journal of Operational Research, Elsevier, vol. 105(3), pages 525-536, March.
    8. Sid Browne & Kevin D. Glazebrook, 1996. "Scheduling jobs that are subject to failure propagation," Naval Research Logistics (NRL), John Wiley & Sons, vol. 43(2), pages 265-288, March.
    9. Yu, Tae-Sun & Pinedo, Michael, 2020. "Flow shops with reentry: Reversibility properties and makespan optimal schedules," European Journal of Operational Research, Elsevier, vol. 282(2), pages 478-490.
    10. Golenko-Ginzburg, Dimitri & Gonik, Aharon, 2002. "Optimal job-shop scheduling with random operations and cost objectives," International Journal of Production Economics, Elsevier, vol. 76(2), pages 147-157, March.
    11. Golenko-Ginzburg, Dimitri & Gonik, Aharon, 1997. "Job-shop resource scheduling via simulating random operations," Mathematics and Computers in Simulation (MATCOM), Elsevier, vol. 44(5), pages 427-440.
    12. Golenko-Ginzburg, Dimitri & Kesler, Shmuel & Landsman, Zinoviy, 1995. "Industrial job-shop scheduling with random operations and different priorities," International Journal of Production Economics, Elsevier, vol. 40(2-3), pages 185-195, August.
    13. Lee, Kangbok & Zheng, Feifeng & Pinedo, Michael L., 2019. "Online scheduling of ordered flow shops," European Journal of Operational Research, Elsevier, vol. 272(1), pages 50-60.
    14. Portougal, Victor & Trietsch, Dan, 2006. "Johnson's problem with stochastic processing times and optimal service level," European Journal of Operational Research, Elsevier, vol. 169(3), pages 751-760, March.
    15. J. Birge & J. B. G. Frenk & J. Mittenthal & A. H. G. Rinnooy Kan, 1990. "Single‐machine scheduling subject to stochastic breakdowns," Naval Research Logistics (NRL), John Wiley & Sons, vol. 37(5), pages 661-677, October.
    16. Opher Baron & Oded Berman & Dmitry Krass & Jianfu Wang, 2017. "Strategic Idleness and Dynamic Scheduling in an Open-Shop Service Network: Case Study and Analysis," Manufacturing & Service Operations Management, INFORMS, vol. 19(1), pages 52-71, February.
    17. K. D. Glazebrook, 1992. "Single‐machine scheduling of stochastic jobs subject to deterioration or delay," Naval Research Logistics (NRL), John Wiley & Sons, vol. 39(5), pages 613-633, August.
    18. Gourgand, Michel & Grangeon, Nathalie & Norre, Sylvie, 2005. "Markovian analysis for performance evaluation and scheduling in m machine stochastic flow-shop with buffers of any capacity," European Journal of Operational Research, Elsevier, vol. 161(1), pages 126-147, February.
    19. Baker, Kenneth R. & Altheimer, Dominik, 2012. "Heuristic solution methods for the stochastic flow shop problem," European Journal of Operational Research, Elsevier, vol. 216(1), pages 172-177.
    20. Yarlin Kuo & Zi‐Ann Chang, 2007. "Integrated production scheduling and preventive maintenance planning for a single machine under a cumulative damage failure process," Naval Research Logistics (NRL), John Wiley & Sons, vol. 54(6), pages 602-614, September.

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:wly:navres:v:42:y:1995:i:8:p:1251-1262. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Wiley Content Delivery (email available below). General contact details of provider: https://doi.org/10.1002/(ISSN)1520-6750 .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.