Lowest price or value? Investigation of UK construction clients' tender selection process

Author

Listed:
  • Chee Wong
  • Gary Holt
  • Patricia Cooper

Abstract

There is a growing urge for a shift from 'lowest-price wins' to 'multi-criteria selection' practices in the contractor selection process. The rationale is to achieve best value (for money) for the client. Earlier investigations have found that the tender price (i.e. capital cost) still dominates the final selection decision despite increased emphases on the need for contractor selection based on 'value'. This paper provides insights into the evaluation of contractors' attributes, particularly for project-specific criteria (PSC), that is, criteria against which tendering contractors may be considered. The importance attached by clients to the 'lowestprice wins' philosophy is also reported. The perceived importance of PSC (i.e. their influence on final selection choice) is determined through a structured questionnaire survey of UK construction clients. The results show an increasing use of PSC. It is also found that 'lowest-price' is not now necessarily the client's principal selection criterion, but rather, the realization that cost has to be tempered with evaluation of PSC in any attempt to identify value for money.

Suggested Citation

  • Chee Wong & Gary Holt & Patricia Cooper, 2000. "Lowest price or value? Investigation of UK construction clients' tender selection process," Construction Management and Economics, Taylor & Francis Journals, vol. 18(7), pages 767-774.
  • Handle: RePEc:taf:conmgt:v:18:y:2000:i:7:p:767-774
    DOI: 10.1080/014461900433050
    as

    Download full text from publisher

    File URL: http://www.tandfonline.com/doi/abs/10.1080/014461900433050
    Download Restriction: Access to full text is restricted to subscribers.

    File URL: https://libkey.io/10.1080/014461900433050?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Cheaitou, Ali & Larbi, Rim & Al Housani, Bashayer, 2019. "Decision making framework for tender evaluation and contractor selection in public organizations with risk considerations," Socio-Economic Planning Sciences, Elsevier, vol. 68(C).
    2. Mimović Predrag & Krstić Ana, 2016. "Application of Multi-Criteria Analysis in the Public Procurement Process Optimization," Economic Themes, Sciendo, vol. 54(1), pages 103-128, March.
    3. Lauri Pulkka & Miro Ristimäki & Karoliina Rajakallio & Seppo Junnila, 2016. "Applicability and benefits of the ecosystem concept in the construction industry," Construction Management and Economics, Taylor & Francis Journals, vol. 34(2), pages 129-144, February.
    4. Bingsheng Liu & Tengfei Huo & Pinchao Liao & Jie Gong & Bin Xue, 2015. "A Group Decision-Making Aggregation Model for Contractor Selection in Large Scale Construction Projects Based on Two-Stage Partial Least Squares (PLS) Path Modeling," Group Decision and Negotiation, Springer, vol. 24(5), pages 855-883, September.
    5. Ali Al-Otaibi & Patrick Aaniamenga Bowan & Mahmoud M. Abdel daiem & Noha Said & John Obas Ebohon & Aasem Alabdullatief & Essa Al-Enazi & Greg Watts, 2022. "Identifying the Barriers to Sustainable Management of Construction and Demolition Waste in Developed and Developing Countries," Sustainability, MDPI, vol. 14(13), pages 1-17, June.
    6. Kwo-Wuu Wang & Yuan-Yu Hsu & Wen-der Yu & Shao-tsai Cheng, 2018. "Determination of Project Procurement Method with a Graphical Analytic Model," Sustainability, MDPI, vol. 10(10), pages 1-17, October.
    7. Amirhosein Jafari, 2013. "A contractor pre-qualification model based on the quality function deployment method," Construction Management and Economics, Taylor & Francis Journals, vol. 31(7), pages 746-760, July.
    8. Florence Phua, 2005. "Determining the relationship between fee structure and project performance between firms: an empirical study based on institutional and task environment perspectives," Construction Management and Economics, Taylor & Francis Journals, vol. 23(1), pages 45-56.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:taf:conmgt:v:18:y:2000:i:7:p:767-774. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    We have no bibliographic references for this item. You can help adding them by using this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Chris Longhurst (email available below). General contact details of provider: http://www.tandfonline.com/RCME20 .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.